DAILY PRODUCTION

DATE 20-Jan
PIT PIT CSW
SHIFT Night Shift
CONTRACTOR PT. HILLCON

Loader EXSN50012 PT. HILLCON


Hauler ADT 02.14.13 Loader : EXSN50012 MATERIAL ADT 60 TON TONAGE ADT 40 TON TONAGE GIGA FVZ TONAGE TOTAL RITASE TOTAL TONAGE
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase Loader : EXSN50012 SAPROLITE 55 2585 0 0 0 0 55 2585
39 WASTE 41 1110.69 0 0 0 0 41 1110.69
39 23 0 0 0 0 0 62
LIMONITE 0 0 0 0 0 0 0 0
Start Loading 22:02 Wit 23 BOULDER 0 0 0 0 0 0 0 0
Stop Loading 4:00 Wit TOP SOIL 0 0 0 0 0 0 0 0
BIOMASS 0 0 0 0 0 0 0 0
0 0 0 0 0 QUARRY 0 0 0 0 0 0 0 0
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase 96 3695.69 0 0 0 0 96 3695.69

Remaks :
Loader EXSN50013 Loader : EXSN50013 2 Loading fleet (2 fleet block model)
Hauler ADT 12.01.11 5 unit ADT ( unit A60H )
18
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase 16Loader : EXSN50013 Fleet Exc 12 SY500H Start Loading 22.02 wit
16 18 0 0 0 0 0 34 Fleet Exc 13 SY500H start Loading 22.48 wit
Note: 1. Hujan dari awal shift hingga jam 22.00 Wit.
Start Loading 22:48 Wit 2. Pemasang batas block di loading point exc SY500H jam
Stop Loading 4:00 Wit 01.47 wit sampai 02.50 Wit
0 0 0 0 0 3. Tower lamp padam jam 04.20 Wit
4. Hujan kedua dari jam 04:00-06:45 (aktivitas diberhentikan sampoai akhir shift)
1 2 3 4 5 6 7

Loader Loader :
Hauler ADT 11.12.02.04.03.77
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase Loader :
0 0 0 0 0 0 0 0

Start Loading 7:40 Wit


Stop Loading 15:45 Wit

1 2 3 4 5 6 7