QUALITY INVESTIGATION REPORT

PROJECT : Hinulugang Taktak STP DATE INSPECTED : January 24,2022


PRODUCT : Different location of ground floor fire exit on plans. FABRICATOR :
BED ID : QIR NUMBER : 005

PRODUCT ID QTY NATURE OF DEFFECTS POSSIBLE CAUSE RECOMMENDED REMEDIES ACTION TAKEN

Different From the floor plan, the fire exit is at


location of GL B but at the rear elevation plan, it
Revision of the rear elevation
ground floor 1 is located at the middle of GL B and Plans not updated.
plan.
fire exit on GL C. On actual, the floor plan is
plans. followed.

FIGURE:

ACTION TAKEN ACCEPTABLE NOT ACCEPTABLE

Prepared / Inspected by: Checked and Verified by: Noted by: Received by:

June Kristian Esico Jaymar T. Isorena Paul Vincent B. Setias


Q. C. Inspector QC Supervisor Manager / Head Operations Rep.