We are pleased to offer herewith our proposal for the above-mentioned subject for the required
Construction Services to carry out the project to wit:
I. PROJECT DESCRIPTION
A. Supply and installation of Concrete Trench Canal with Steel Grille Cover
B. Supply and installation of Concrete Oil Interceptor with Steel Plate Cover
The proposed work schedule to carry-out the work and construction will start provided
that the Client conform on the proposal and issue the “Notice to Proceed” to commence
the work , to wit:
WEEK
ITEM PHASE DAYS
1 2 3 4 5 6 7
I GENERAL REQUIREMENTS 15
II CONCRETE TRENCH CANAL 10
III OIL INTERCEPTOR 25
IV PROJECT TURN-OVER 5
40 Days (6 Weeks)
PVBS Construction Services & Consultancy is expected to provide the summary of cost
including indirect cost and tax for providing Construction Services as follows:
The total General Construction Works for the above-mentioned project shall be in
Philippine Peso:
One Million Five Hundred Ninety Six Thousand Seven Hundred Forty Three Pesos
& 90/100 centavos
Time table to carry out all works shall be minimum of Forty (40) days or more or less
Six Months upon approval /conforming this proposal and shall be extended depends on
circumstances thereof.
Any additional works requested by the owner after approval of this proposal not included
on the program of works shall be charged as Extra Work Order with separate cost per
item.
PVBS CONSTRUCTION SERVICES & CONSULTANCY
Blk 29 Lot 5 Herb St., cor. Pardinas St., Purok 13
Zone 6 Bgy. South Signal
Taguig City, Metro Manila, 1630 Philippines
M: +639184252769 / +639152418181
T: (+632) 959 4365
E: pvbs.construction.services2013@gmail.com
TIN : 926 – 665 - 404
3| P a g e
We hope that you find the above in order and we look forward to working with on this
project.
Should our proposal merit your favorable consideration, please confirm by signing on the space
provided below.