DAUGHTER OF MOSES CONSTRUCTION

General Engineering & General Building


Philippine Contractors Accreditation Board (PCAB) No. 38195
No. 206 Purok 3, Santa Tereza 1st, Lubao, Pampanga
Email Address: dom_construction16@yahoo.com;
Contact Numbers: 0922-280-5549; 0906-855-0421

MAY 31, 2021 Ref.: DOM-QUO-052021

LAKSHMI BUILDING ENVELOPE MANUFACTURING & TECHNOLOGIES


Bldg. 39 PHILEXCELL , Business Park , Manuel A. Roxas Highway
Clark FreePort Zone
2023, Pampanga Philippines

Attention : Mr. Arnel G. Perez


Operational Manager -Lakshmi Bemt

: WIDUS HOTEL AND CASINO EXPANSION


Roxas Highway, Clark Freeport Zone, 2023 Pampanga Philippines
Subject : SUPPLY OF MANPOWER FOR THE INSTALLATION OF GLASS.

Dear Sir :
upply of manpower for the installation of your Glass at Level 2 Podium area.

BILL OF QUANTITY (Summary)


ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL AMOUNT
I Preliminaries
1 Portable working tools included -
2 One-time trade Cleaning Only (Interior& Exterior) included -
Safety and Protection in Complianace to Safety Guidelines including PPE &
3 included -
uniforms
4 House Rental including water and electricity included -
5 Others (workers insurance, SSS, Philhealth and Pag-ibig) included -
Sub-Total for Preliminaries -
II Scope of works
1 INSTALLATION OF GLASS (Level 2) SQ.M ₱770,000.00
2 INSTALLATION OF MULLIONS AND FRAMING SQ.M ₱550,000.00
3 INSTALLATION OF STAINLESS CLADDING SQ.M ₱550,000.00
4 INSTALLATION OF TOP AND BOTTOM BRACKETS SQ.M ₱310,000.00
Sub-Total for Installation ₱2,180,000.00
Total ₱2,180,000.00
***Amount in Words: Two million one hundred eighty thousand Pesos ***

Note:
1 Necessary working and access permits to be provided tous free of charge.
2 Full and clear access to be provided to us during the execution of the above scope of works.
3 Lead time for mobilization shall be one (1) week to two (2) weeks from the date of P.O. issuance.
4 Terms of Payment:
- 10% Down Payment
- Monthly Progress Billing
5 Terms and Condition Apply
6 Exclusion: any item not specifically mentioned above.

Hoping that our best price offer will meet your satisfaction.

Very truly yours,

Marjorie I. Vitug
President - DOM Construction
DAUGHTER OF MOSES CONSTRUCTION
General Engineering & General Building
Philippine Contractors Accreditation Board (PCAB) No. 38195
No. 206 Purok 3, Santa Tereza 1st, Lubao, Pampanga
Email Address: dom_construction16@yahoo.com;
Contact Numbers: 0922-280-5549; 0906-855-0421

Terms & Condition:


* Should only part and not all of this quotation be ordered, prices quoted may be subject to recalculation.
* An advance payment equivalent to Ten Percent (10%) paid after issuance of P.O. or NTP prior to any commencement.
Balance shall be paid on monthly progress billing.
* Bank fees; all payments via telegraphic transfer are to have bank fees & charges paid by the sender, including any local fees from our bank.
* Included on the attached price is a "trade clean" (removal of labels, excess sealant and dust/dirt that has accumulated prior to installation)
of all items contained in this quotation scope. A final clean is not included.
* Payment to BLB Corporation for this is not dependent on payments received by our customer from their clients.
* No retention to be withheld.
* Bond's cost is not included in our quoted price.
* Value added tax (VAT) included.
* Supplementary taxes or governmenal charges are not included (specially municipal, barangay, or other goernment taxes, fees etc.)
* A portion within the working area shall be provided free of charge for office and work shed.
* Suitable area shall be made available for delivery, handling and storage of material, tools and equipment.
* Temporary power and water supply shall be provided at no additional cost.
* Tower cranes, fabricated lifter, Scaffolds or gondolas shall be provided free of charge.
* All masonry, chipping, carpentry and demolition works are excluded.
* Our price remains valid for 30 days.
* Hours of work, 8 hours a day, 6 days a week.
* Twelve (12) months warranty period included for workmanship only.
* DOM Construction shall not be held liable for any implication due to delays caused by port congestion or conditions manmade or nature
that is beyond our control.