RELOCATION OF APPLIANCE CENTER

2nd Floor, SM CITY BAGUIO


Bid Proposal for Mechanical Works
MR. HANS T. SY, JR.
President - SMEDD

Attention to: ENGR. NORMIE C. SAN GABRIEL


SAVP - PMG Retail Affiliates
Thru: ENGR. HELEN P. BLANCO
AVP - PMG Retail Affiliates (Non-Fashion)
ENGR. JESSICA G. VILLANUEVA
Assistant Project Manager
ENGR. HENESHEY R. PALOMA
Project Engineer

In compliance with your invitation to bid dated _____________ , our quotation


for the above mentioned project are as follows:

DESCRIPTION AMOUNT

I. Insurance Php 45,000.00


II. Supply of Ceiling Concealed - Chilled Water FCU Php 878,400.00
III. Installation of Ceiling Concealed - Chilled Water FCU Php 280,000.00
IV. Supply and Installation of AC Units Php 243,600.00
V. Supply and Installation of Refrigerant pipes, fittings, insulation Php 961,352.00
VI. Supply, Fabrication & Installation of AC Works w/ Polyolefin Insulation Php 924,673.00
Supply and Installation fo Condensate Drain Pipes & Insulation w/
VII. Php 48,460.00
Dripping Pan
VIII. Electrical Works Php 129,698.00

TOTAL AMOUNT Php 3,511,183.00

We/I further certify that the cost submitted above are complete based on the bid plans, scope of works and materials
specification issued by SM Engineering and Development Division.

We / I agrees that this is a closed bid and to be open only by the authorized representative of the Owner.

We / I commit to start and finish the project within 75 days complying to approved construction period
(Schedule subject to change unless otherwise confirmed in the contractor's schedule.)

Terms and conditions:


˃ Terms of Payment: 30% DP, 60% PB, 100%PB (w/ Retention)
˃ Warranty of unit (AC):
˃ One (1) year on compressor (non-inverter) / Five (5) years on compressor (inverter)
˃ Two (2) years on FCU parts
˃ Warranty of Workmanship:
˃ One (1) year for the implemented works (the contractor will rectify all defective works found and free of charge,
within one(1) year starting from the date of completion of store or opening date, whichever comes first).
˃ Inclusive of testing of system & submission of test result.
˃ One (1) year Preventive Maintenance (Quarterly cleaning or as the need arise)
˃ Inclusive of sign and seal for permit application requirements and submission of 10 sets asbuilt plan (blueprint) w/ 3 CDs.
> NO PPE NO Work Policy should be complied with
> Inclusions of expenses in compliance with Covid-19 Safety Guidelines & Preventive Measurements such as disposable masks
(min. reqt of surgical mask) for all workers and disinfectant liquids for site/materials sanitization.

Contractor's Name METRO COOLAIRE ENGINEERING SERVICES

Authorized Signatory ENGR. NOVA GRACE C. CASTILLO

Position SALES AND SERVICE ENGINEER

Contact Number 0917-708-4205

Date Submitted June 16, 2020