BaikIN DAIKIN AIRCONDITIONING PHILIPPINES, INCORPORATED
INSPECTION AND PRE-START UP REQUEST CHECKLIST
‘COMPLETION
Fu ves_|_no
CLEAN AREA
FIKED CIRCUIT BREAKER
FIXED POWER SUPPLY
RAIN
TRANSMISSION WIRE
uct
accu
CLEAN AREA
FIXED CIRCUIT BREAKER
FIXED POWER SUPPLY
‘TRANSMISSION WIRE
uct
PRE-HEAT (FOR VRV ONLY)
‘AVAILABILITY
ACCESSORIES ves | no
REMOTE CONTROL
REFRIGERANT (BRANDED)
GAUGE MANIFOLD
WEIGHING SCALE (O1GITA)
REMARKS.
TO BE FILED UP BY REQUESTING PARTIES:
NAME OF PROJECT:
COMPLETE ADDRESS:
INSTALLER REPRESENTATIVE ON SITE:
REQUESTED DATE OF INSPECTION OR START UP:
INSTALLER CONTACT No,
‘TPE OF AIRCONDITION vavjary. SINGLE SPLIT/QTY.
REQUESTED By: SIGNATURE:
‘TO BE FILLED UP BY INSTALLATION SUPPORT DEPARTMENT OF DAIKIN
APPROVED DATE AND TIME OF INSPECTION / START UP:
[APPROVED BY: SIGNATURE:
TERMS AND CONDITIONS
‘To DAI OFFICE Jo NSALLATEN SUPPORT DEPARTMENT
‘4, REQUESTED DATE OF INSPECTION OR START UP MUST BE AT LEAST THREE (3) WORKING DAYS AHEADPROJECT
LOCATION
SYSTEM N
4
MODULE
NAME ;
OUTDOOR UNIT
MODEL
SERIAL NO.
ACCU TAG
2
3
INDOOR UNIT
MODEL NO.: SERIAL NO.: FCU TAG
|S ]o}on] a }oofno| =