GENERAL DIRECTORATE of CIVIL
DEFENCE MINISTRY of INTERIOR
STATE of QATAR
Proposed Development :
INTERNAL MODIFICATIONS AND ADDITIONS ON PREVIOUS APPROVED PS 30304 & 31734 CABLE
FACTORY
Location : MESAEED Application No. : N/2021/0005240
Pin No. : 92320013 Type of Plans : FF
Findings
> identify and indiacate the node reference in each sprinkers that were used in your Hydraulic calculation.
> provide flushing connections in crossmains.
> relocate FHC to completely cover the whole store area. Apply also in Corridor.
> recheck travel distance of fire extinguisher throughout Store(s). Provide additional as necessary. Apply also in Corridor.
> do not put Electrical room that are not reflected from approved LSP dwg.(at gridline 29/6)
> clarify the room w/ aluminum frame w/ glass(gridline 29/7) if it has no false ceiling. Provide tagging in the room if it is so(if not, then provide sprinkler).
(h) in modified Workshop;
> for rooms protected w/ Clean agent system, submit Non- objection/Confirmation letter(see related findings above).
> in small rooms(e.g. around gridline C/11, C/6 and B/4), provide tagging if they have no false ceiling thus non provision of sprinklers.
> provide demarcation(for open above/double height) in all areas/rooms that are protected with high level sprinklers.
> clarify/confirm if Class III FHC is existing.
> provide complete coverage of portable fire extinguishers(Note: provide/put in common area then measure up to the most remote room/area). Apply required travel
distances.
5.0. At FF-202, in 1F;
> provide sprinkler in Server room.
> provide complete sprinkler coverage in corridor at gridline E-F/3.
> recheck travel distances of fire extinguisher. Provide additional as necessary.
6.0. At FF-203, clarify if the Office Mezzanine is full height all through up the Roof. If not, provide above sprinkler as necessary. Moreover, provide
fire extinguiher serving Offices and Pantry(also fire blanket).
7.0. At FF-204, in GF, provide sprinkler in small rooms at gridline A/1 and A/3.
8.0. At FF-301 to 303;
Note: Complete review will be done upon submision of "No objection/Confirmation letter".
(a) revise Tabulation of Clean agent design criteria, use format as per QCD standard.
(b) for gas cylinders, move outside of the room (apply as per QCD requirements).
(c) provide also Sounder/flasher unit inside the room.
(d) provide Warning sign/Illuminated sign in both inside&outside of the room.
(e) provide Section dwg of each room(and show above ceiling/trench void if any). Then reflect the nozzle/detector as per plan layout.
(f)provide FA&FF schematic diagran that are consistent as per plan layout.
(g) provide General Notes for Clean agent system, Sequence of operation and standard details.
9.0. Provide Section dwg of all modified Bldgs. And reflect sprinklers(and standpipe riser for Tower) as per plan layout.
10. Submit Design Report of this application. And this should be signed&stamped by the Design Consultant and Owner/owner's representative.
11. Submit Hydrauli calculations;
(a) submit Sprinkler&Hose calculation in most remote&most demand based from the modified Buildings of this application. Note: Attach them with their respective
isometric diagrams.
(b) for Storage, attach cutsheet of figures or tables from NFPA 13 where in the selected criterias are highlighted(e.g. hazard classification, storage configuration,
commodity class, k-factor and others).
12. Reserve.
2 of