You are on page 1of 12

Approved House of Expertise by General Directorate of Civil Defence

Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

COMPLIANCE REPORT FOR FIRE PROTECTION,


FIRE ALARM, SMOKE MANAGEMENT & LIFE SAFETY
FOR LULU –CENTRAL LOGISTIC HUB –
DRY STORAGE WAREHOUSE.
Plot No 531-956 Dubai Industrial Park- Dubai-UAE

Client: M/s. LULU LOGISTICS LLC

REF: KOFFEL/CR/2022/894-REV1

KOFFEL INTERNATIONAL
FIRE SAFETY CONSULTANCY
Office 107, Abdul Aziz Mirza BLDG,
Near Karama Park, Dubai, UAE.
Land Line: +971-4-3306375
Civil Defence Approved House of Expertise Email: info@koffelme.com

Rev Date Description Prepared By Reviewed &


Approved by
00 22 July 2022 Compliance report for review
01 23 August 2022 Compliance report for review

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 1/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

Table of Contents
1 INTRODUCTION ................................................................................................................................. 3
1.1 PROJECT DESCRIPTION ....................................................................................................................... 3
1.2 PURPOSE OF THE REPORT ................................................................................................................... 3
1.3 AUTHORITY HAVING JURISDICTION .................................................................................................... 3
1.4 APPLICABLE CODES, STANDARDS AND REGULATIONS ......................................................................... 3
1.5 PROJECT STAKEHOLDERS .................................................................................................................... 4
1.6 DRAWINGS ......................................................................................................................................... 4
2 BUILDING CHARACTERISTICS AND PROJECT LOCATION ................................................ 5
2.1 BUILDING DESCRIPTION – DRY WAREHOUSE NO. .............................................................................. 5
3 COMMODITY CLASSIFICATION AS PER NFPA-13 ................................................................ 6
4 TYPE OF STORAGES / STORAGE HEIGHT ................................................................................ 6
5 SPRINKLER SYSTEM DESIGN CRITERIA / SPRINKLER ZONES ....................................... 6
5.1 FOR WAREHOUSE AREA ...................................................................................................................... 6
6 COMPLIANCE REVIEW BASED ON THE UAE FIRE & LIFE SAFETY CODE AND NFPA ............... 7
7 GENERAL COMMENTS .......................................................................................................................... 9

LIST OF TABLES
Table 1: Codes and Standards ............................................................................................... 3
Table 2 : Stakeholders List ..................................................................................................... 4
Table 3 : Drawings Provided .................................................................................................. 4
Table 4 : Building Characteristics ......................................................................................... 5
Table 5 : Commodity Classification as per NFPA-13 .......................................................... 6
Table 6 : Type of Storages / Storage Height ...................................................................... 6

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 2/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

1 Introduction

1.1 Project Description


This Compliance report for Fire protection, Fire Alarm, Smoke management & Life safety is
prepared for LULU Central Logistic Hub - Dry Storage Warehouse located at Plot No. 531-0956
Dubai Industrial Park.

The storage have ground level storage. The storage type will be Racking system.

M/s. KOFFEL International Fire Safety Consultancy has been appointed to prepare Compliance
report for Fire protection, Fire Alarm, Smoke management & Life safety to assess the proposed
Fire protection/sprinkler/Fire alarm/Smoke management/Life safety design is adequate/
suitable for the proposed storage.

1.2 Purpose of the Report

The purpose of this compliance report represents implementation of recommendations


stipulated in NFPA 10,13,14,20,24,72,101,5000, UAE Fire & Life Safety Code of Practice -2018
and comments made by Client.

1.3 Authority Having Jurisdiction

The Authority Having Jurisdiction (AHJ) for Fire & Life safety of this development will be Dubai
Civil Defence Authority (DCD).

1.4 Applicable Codes, Standards and Regulations

Table 1: Codes and Standards

Code Title Edition

UAE FLS code UAE Fire & Life Safety Code of Practice 2018
NFPA 10 Standard for Portable Fire Extinguishers 2019
NFPA-13 Standard for the Installation of Sprinkler Systems 2018
NFPA 14 Standard for the Installation of Standpipe and Hose Systems 2018
NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection 2022
NFPA 24 Standard for the Installation of Private Fire Service Mains and Their 2019
Appurtenances
NFPA 72 National Fire Alarm and Signalling Code 2019
NFPA-101 Life safety code 2019
NFPA 5000 Building Construction and Safety Code 2015

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 3/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

1.5 Project Stakeholders

Table 2 : Stakeholders List

Role Organization

Client M/s. LULU

Authority Having
DUBAI CIVIL DEFENCE AUTHORITY (DCD)
Jurisdiction (AHJ)

Project Consultant M/s. AL WASL AL JADEED

Fire Safety Consultant M/s. KOFFEL International Fire Safety Consultancy

1.6 Drawings

Below is a list of architectural plans/ drawings that were used to compile this Fire and Life
Safety Strategy Report.

Table 3 : Drawings Provided

Revision
Drawing Number Drawing Title
Number / Date
AW-748-SD-01-3440100 Fire truck access plan 00
AW-748-SD-01-3440101 Lower Ground Floor plan 00
AW-748-SD-01-3440102 Ground Floor Plan 00
AW-748-SD-01-3440103 Mezzanine floor plan 00
AW-748-SD-01-3440104 Roof floor plan 00
AW-748-DD-01-A-301 Sections 01
CEC-P264-DD-01-MEP-FF02 Fire Fighting setting out plan 00
CEC-P264-DD-01-MEP-FF03 Lower Ground Fire Fighting Floor plan 00
CEC-P264-DD-01-MEP-FF04 Ground Fire Fighting Floor plan 00
CEC-P264-DD-01-MEP-FF05 Mezzanine floor Fire Fighting Floor plan 00
CEC-P264-DD-01-MEP-FF06 Fire Fighting Schematic Diagram 00
CEC-P264-DD-01-MEP-FA02 Lower Ground Fire Alarm Floor plan 00
CEC-P264-DD-01-MEP-FA03 Ground Fire Alarm Floor plan 00
CEC-P264-DD-01-MEP-FA04 Mezzanine floor Fire Alarm Floor plan 00
CEC-P264-DD-01-MEP-FA05 Fire Alarm Schematic Diagram 00
CEC-P264-DD-01-MEP-EM05 Emergency lightings Schematic Diagram 00
Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 4/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

CEC-P264-DD-01-MEP-SV02 Lower Ground Smoke Ventilation Floor plan 00


CEC-P264-DD-01-MEP-SV03 Ground Smoke Ventilation Floor plan 00
CEC-P264-DD-01-MEP-SV04 Mezzanine floor Smoke Ventilation Floor plan 00
CEC-P264-DD-01-MEP-SV05 Roof Smoke Ventilation Floor plan 00

2 Building Characteristics and Project Location

2.1 Building Description – Dry Warehouse No.

The proposed storage warehouse will have ground level storage.

Proposed building characteristics are detailed in the table below.

Table 4 : Building Characteristics

Max. Roof /
Applicable
Building Part Name Area Ceiling
Occupancy
Height

Warehouse Area – (Ground) 39150.0 m² 13.00 m Warehouse

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 5/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

3 Commodity Classification as per NFPA-13

The type of storage goods proposed to store in the warehouse will be (General Commodity)
Storage items.

The details of commodity classification as per NFPA-13 are provided in the Table below:
Table 5 : Commodity Classification as per NFPA-13

Commodity Classification as per


Type of Storage Cartoned / Exposed
NFPA-13

Miscellaneous storage Class I to IV Cartooned or Exposed

4 Type of Storages / Storage Height

Following table provide the details of Storage type and the allowed Storage height, ceiling
height for each storage area.

Table 6 : Type of Storages / Storage Height

Building Part Max. Roof / Max. Storage


Area Type of Storage
Name Ceiling Height Height
Solid Piled Storage,
Palletized, Bin box,
Dry Warehouse Single /Double/Multiple row
39150.0 m² 12.0 m 10.05 m
(Ground) rack
and
back to back shelf storage

5 Sprinkler System Design Criteria / Sprinkler Zones

5.1 For Warehouse Area

A Warehouse Miscellaneous material Storage

Warehouse Maximum Ceiling Height 12.0m

B Details of Storage

Storage Materials Grocery Foods, Roastery Products, Delicatessen.


Textiles, Luggage, Health/Beauty,

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 6/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

Electrical, Overheads, Stationery, Ladies bags,


Garments/Textiles
C Applicable NFPA Table / Requirements

Sprinkler Protection of Rack Storage of Class Design Densities:


I Through Class IV Commodities (No open
NFPA 13 –Table 23.3.1 (2022)
top container or solid shelves)
Maximum Allowable ceiling/Roof height 12.2 meters [as per NFPA13- Table 25.3.1

D ESFR Ceiling Sprinklers

Storage Arrangement Single-row, double-row racks of Class I Through IV


commodities
NFPA-13 Commodity Classification Class I, II, III, or IV, cartooned, encapsulated or non-
encapsulated Group A plastics.
Ceiling sprinkler K- Factor ESFR 25.2 (360)

Number of Design Sprinkler 12 NOS (as per NFPA13- Table 25.3.1)

Required Minimum ESFR sprinkler discharge 1.7 Bars


pressure as per NFPA 13(Table 25.3.1)
Total Discharge Through Active Sprinkler – Q= K√P
Q= 360√1.7
Q= 469.4 Lpm (124GPM)
Fire water requirement for 12 Numbers 12Nos X 469.4 Lpm (124GPM)
ESFR sprinkler
= 5632 Lpm (1488GPM)
Hose stream allowance: 1893 lpm (500 gpm).

Total Sprinkler & hose stream demand: 1488 gpm + 500 gpm = 1988 GPM

Total Fire Water Demand = 2000 GPM @11 bar


Installed Fire Water Pump Capacity = 2000 GPM @ 11 Bar

FLS Design Fire Pump Capacity – 2000 GPM.


Assessment

6 Compliance review based on the UAE Fire & Life Safety code and NFPA

S. No Recommendations Reference from UAE FLS code 2018

Fire rating for the doors provided for


UAE Fire and Life Safety Code of
Electrical room & Telephone room Shall be
1. Practice, Chapter 1 Table 1.9 & Chapter
revised to 60min fire rated instead of 90min
3 Table 3.3a, 3.3b.
fire rated.
Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 7/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

Additional door shall be provided for the


UAE Fire and Life Safety Code of
2. Staff dining room in the Mezzanine floor as
Practice, Chapter 3 Table 3.14.
occupant load is exceeding 50 persons.
In Mezzanine floor, the compartmentation
between corridor and warehouse area shall UAE Fire and Life Safety Code of
3.
be 1 Hour Fire rated wall. (The wall shall be Practice, Chapter 1 Table 1.2
1 hr. Fire rated).
All the Beams & Columns shall be 2 hour UAE Fire and Life Safety Code of
4.
Fire rated. Practice, Chapter 1 Table 1.6 & Table 1.8
Roof Sandwich panel as product shall
comply with ASTM D1929 having self-
ignition temperature of not less than 343 ⁰C
and Sandwich panel assembly shall comply
UAE Fire and Life Safety Code of
5. with NFPA 256 With pass criteria “Class B”
Practice, Chapter 1 Table 1.17c
or ASTM E 108 with pass criteria “Class B”
or EN 13501-5 +A1 With pass criteria “Class
B roof t4” or UL 790 With pass criteria
“Class B”.
Diesel generator rooms which are separated
as part of separated service blocks and
UAE Fire and Life Safety Code of
6. detached from the predominant occupancy,
Practice, Chapter 9 Table 9.30
by a separation distance of 3 m, shall not be
required to be protected.
LV Rooms which are separated as part of
separated service blocks and detached from
UAE Fire and Life Safety Code of
7. the predominant occupancy, by a separation
Practice, Chapter 9 Table 9.30
distance of 3 m, shall not be required to be
protected.
Electrical rooms, Telephone room, IDF room
which are less than 10 m2 in area shall not be UAE Fire and Life Safety Code of
8.
required to be protected with clean agent Practice, Chapter 9 Table 9.30
system. (Comply)
Since Dry store warehouse is more than
3600m2, Provision of Yard Hydrant and UAE Fire and Life Safety Code of
9.
Hose reel system is sufficient for the Practice, Chapter 9 Table 9.27 & Table 9.5
warehouse. (Comply)
Ground floor makeup air shall be discharged UAE Fire and Life Safety Code of
10.
at least low level from the FFL +0.30m. Practice, Chapter 10 Table 10.6
Listed smoke curtains @ 4000 sq. m of the
floor area with smoke reservoir effective UAE Fire and Life Safety Code of
11.
depth of 20% of the total ceiling height of the Practice, Chapter 10 Table 10.9
space. (Comply)
Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 8/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

Monitored Type Self Contained Emergency


Lighting System, complete with dedicated
UAE Fire and Life Safety Code of
12. control and monitoring equipment along
Practice, Chapter 6 Table 6.5
with computer interfacing shall be provided
for Warehouse Occupancy.

7 General comments

S. No Description Action By

ARCHITECTURAL
1. Travel distance shall be comply with UAE Fire code, Consultant Shall
Chapter 3, Table 3.16.17 ensure compliance.
2. Electrical room, Garbage room, Telephone room, Battery Consultant to ensure
room door and wall shall be 60 minutes fire rated as per compliance.
the UAE Fire Code, Chapter 1 Table 1.9.
3. Minimum Door width shall not be less than 915 mm, Consultant to ensure
Where a pair of door leaves is provided, one door leaf compliance.
shall provide not less than 810 mm clear width opening as
per the UAE Fire Code, Chapter 3 Table 3.2.

FIRE DETECTION AND ALARM INSTALLATION

1. Calculated battery backup storage should is sufficient for Consultant/Specialist


24 hours in normal Condition and 30 minutes in Fire Fire contractor to
Alarm condition. ensure compliance.
2. Smoke detectors should be installed Above false ceiling Consultant/Specialist
spaces with height more than 800 mm and Below raised Fire contractor to
floor spaces with height 350 mm shall be provided with ensure compliance
optical smoke detectors, complete with remote response
indicators
3. Detectors shall not be located in direct airflow or within 1 Consultant/Specialist
m (3 ft) of air supply diffuser or return air opening Fire contractor to
ensure compliance
4. A fire alarm repeater panel should be provided at Security Consultant/Specialist
Guard house. Fire contractor to
ensure compliance
5. Beam detectors (Projected Beam) where installed shall be Consultant/Specialist
spaced at a maximum distance of 18 m (60 ft.). The Fire contractor to
Transmitters and Receivers shall be located at a maximum ensure compliance
distance of 4.5 m from wall. And the projected beam light
shall be at a maximum parallel distance of 9 m from wall.
Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 9/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

Beam detectors where applicable, shall be utilized for


application in the range of minimum of 5 m and maximum
of 100 m coverage
6. VESDA air Sampling type smoke detectors shall be Consultant/Specialist
designed as per manufacturers approved software based Fire contractor to
calculations (Fluid Dynamic Calculations). The maximum ensure compliance
smoke transport time from the farthest sampling point
shall not exceed 120 seconds. The Air Sampling Piping
network throughout the area shall be identified with clear
signage as "Smoke Detection Piping-Do not tamper”
7. Total Fire Alarm Notification sound level, mixed with local Consultant/Specialist
ambient sounds shall not be more than 110 dBA at the Fire contractor to
minimum hearing distance ensure compliance
FIRE PROTECTION
1. Minimum flow and residual pressure at the hydraulically Consultant/Specialist
most remotely ( located Landing Valve shall be 250 gpm
Fire contractor to
(946 LPM ) at 6.9 bar (100 psi) ensure compliance
2. Minimum flow and residual pressure at the hydraulically Consultant/Specialist
most remotely located Hose Reel/Hose Rack shall not be Fire contractor to
less than 6.5 gpm (24.6 LPM) at 4.5 bar (65 psi) ensure compliance
3. ESFR sprinkler pipe sizes shall be consider as per the Consultant/Specialist
Hydraulic calculation. Fire contractor to
ensure compliance
4. Fire rated Electrical cabling for Fire pump controller shall Consultant/Specialist
be through dedicated cable trey, protected route and Fire contractor to
dedicated junction box
ensure compliance
5. Fire Pump room to have easy accessible by Civil Defence Consultant/Specialist
Fire Fighters during emergencies Fire contractor to
ensure compliance
6. The fire water tanks shall be provided with a filling Consultant/Specialist
connection directly from DEWA with a float operated Fire contractor to
valve for automatic refilling. ensure compliance
7. The fire water tanks shall be provided with drain Consultant/Specialist
arrangement, overflow connection, access manhole, Fire contractor to
ladders, level indicators, low level switch, etc ensure compliance
8. Yard Hydrant system shall satisfy the flow requirement of Consultant/Specialist
500 gpm with 6.9 bar pressure at the two most remote Fire contractor to
Hydrants ensure compliance

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 10/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

CLEAN AGENT SYSTEM


1. Electrical rooms which are less than 10 m2 in area shall not Consultant/Specialist
be required Fire contractor to
ensure compliance
2. Pressure relief valve location and installation shall be such Consultant/Specialist
that its operations shall not cause hazard to personnel or Fire contractor to
affect ventilation systems ensure compliance
3. Ventilation and air circulation systems shall be shut down Consultant/Specialist
upon actuation Fire contractor to
ensure compliance

SMOKE MANAGEMENT SYSTEM

1. Mechanical smoke extract fans shall be listed and Consultant/Specialist


approved by Civil Defence as per the test requirements of Fire contractor to
Chapter 10, Section 6 of UAE Fire code. ensure compliance
Smoke extract fans should comply with Table 10.1 and
shall be approved and listed for effective operation at
400ºC for 2 hours
2. Ducting for the mechanical smoke extract shall be Consultant/Specialist
dedicated, independent of any other system in the building Fire contractor to
and shall comply with Table 10.1.3.2. . of UAE Fire code ensure compliance
3. The mechanical smoke purging system shall be designed to Consultant/Specialist
achieve 10 air changes per hour. Fire contractor to
Detailed design /Engineering analysis to be carried out by ensure compliance
Specialist Smoke management consultant/contractors.
4. Mechanical make-up air is supplied, the supply points for Consultant/Specialist
the makeup air shall be located beneath the smoke layer Fire contractor to
interface. ensure compliance
5. Make-up air shall not exceed an inlet velocity of 5 m/s. Consultant/Specialist
Fire contractor to
ensure compliance
6. Listed smoke curtains @ 4000 sq. m of the floor area with Consultant/Specialist
smoke reservoir effective depth of 20% of the total ceiling Fire contractor to
height of the space. ensure compliance
7. Extracted air shall be discharged directly to the external Consultant/Specialist
and shall not be less than 5 m from any air intake openings. Fire contractor to
ensure compliance

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 11/ 12
Document No.: KOFFEL/CR/2022/894-REV1
Approved House of Expertise by General Directorate of Civil Defence
Licensed Fire Safety Engineering Consultants by the U.A.E Ministry of Interior

8. The mechanical smoke exhaust fans shall be interfaced Consultant/Specialist


with a cross zoned Fire detection and a sprinkler Fire contractor to
activation. ensure compliance
9. Backup Power in an event of Emergency provided as per Consultant/Specialist
Table 10.26 Point No.1 of UAE Fire & Life safety code. Fire contractor to
ensure compliance
10. Smoke extract system separated based on the smoke zones Consultant/Specialist
or provide Motorized Smoke Damper Fire contractor to
ensure compliance

Title: COMPLIANCE ASSESMENT REPORT FOR M/s LULU LOGISTICS LLC Page : 12/ 12