You are on page 1of 29

Avenues Phase 2

MEP STRATEGY

March 2013

Avenues Phase 2

MECHANICAL
INSTALLATIONS

March 2013

Avenues Phase 2

March 2013

MECHANICAL INSTALLATIONS
List of Mechanical Standards
HEAT LOAD CLACULATIONS
MECHANICAL REQUIREMENTS
(Architectural Space Allocation)
MECHANICAL SERVICES LOCATIONS

Avenues Phase 2

March 2013

List of Mechanical Standards


Services

Air Conditioning

Drainage

Title

Edition

Ashrae Handbook Fundamentals

2009

Ashrae Handbook - HVAC Application

2011

Ashrae Handbook - HVAC systems & Equipment

2012

Ashrae Handbook - Refrigeration


Ashrae Std 62 - Ventilation For Acceptable Indoor Air Quality

2010
2010

NFPA 101- Safety life From Fire in building and Structures


NFPA 90A Installation of Air Conditioning and Ventilating Systems.

2012
2012

NFPA 70 National Electric Code.

2011

NFPA 92 Smoke Control Systems.

2012

DW144 Specification for Sheet Metal Ductworks.

1998

SMACNA Standards for Ductworks.

2005

International Building Code

2012

BSEN 12056-1-2000 Gravity Drainage System Inside Buildings, Part 1 : General and
Performance Requirements.

2000

BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 2 : Sanitary Pipe work
Layout and Calculation.

2000

BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 3 : Roof Drainage,
Layout and Calculation.
BSEN 752, 2008 Drainage & Sewer Systems Outside Buildings.

2000
2008

Plumbing Engineering Services Design Guide


ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4

2002
2001

International Plumbing Code.

2012

Local Codes and Ordinances in Dubai UAE.

2011

Local Civil Defense Regulations and Requirements.

Avenues Phase 2

March 2013

List of Mechanical Standards


Services

Water Supply

Fire Fighting

LPG - Gas Distribution

Title
British Standards BS 6700-Design, installation, testing and maintenance of services
supplying water for domestic use within buildings and their Cartilages

Edition
2006

Plumbing Engineering Services Design Guide.

2002

International Plumbing Code.

2012

ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4


Local Codes and Ordinances in Dubai UAE.

2001
2011

Local Civil Defense Regulations and Requirements.


NFPA 10 Standard for the Installation of Portable Fire Extinguishers

2013

NFPA 13 Standard for the Installation of Sprinkler Systems

2013

NFPA 14 Standard for the Installation of Standpipe and Hose Systems

2013

NFPA 20 Standard for the Installation of Stationary Pumps

2013

NFPA 101 Safety to Life from Fire in Building and Structures

2012

NFPA 90A Installation of Air Conditioning and Ventilating Systems


NFPA 70 National Electric Code
NFPA 92 Smoke Control Systems
UAE Fire Code
Local Civil Defence Regulations and Requirements

2012
2011
2012
2011
-

IMC- Ineternational Mechanical Code


IFGC - International Fuel Gas Code

2012
2012

NFPA 54 - National Fuel Gas Code

2012

NFPA 58 - Liquefied Petroleum Gas Code

2011

NFPA 59

2012

Avenues Phase 2

March 2013

HEAT LOAD CALCULATIONS


Number
Building # DESCRIPTION Floors

of
floors

AREA
(SQ.FT) / FL

AREA
(SQ.MTR)/FL

Occ. Laod
as per Ashrea
62.1

Total BUA
( SQ.MTR)

Est .TCL (W)

Building 01

Anchor STORE

GF + 1

40,239.84

3,738.40

7,476.80

15

1,495,360.71

Building 02

Retail

GF

12,669.50

1,177.03

1,177.03

15

235,406.87

Building 03

Retail

GF

12,287.69

1,141.56

1,141.56

15

228,312.69

Building 04

Retail

GF

17,978.08

1,670.22

1,670.22

15

334,043.53

Building 05

Retail

GF

16,622.90

1,544.32

1,544.32

15

308,863.36

Building 06

Retail

GF

19,505.71

1,812.14

1,812.14

15

362,427.70

Building 07

Retail

GF

36,872.97

3,425.61

3,425.61

15

685,121.85

Building 08

Retail

Gf

21,037.96

1,954.49

1,954.49

15

390,897.85

Building 09

F&B / RESTAURANT

GF

3,621.55

336.45

336.45

70

84,113.12

Building 10

F&B / RESTAURANT

Gf

3,621.55

336.45

336.45

70

84,113.12

Building 11

F&B / RESTAURANT

GF

3,621.55

336.45

336.45

70

84,113.12

Building 12

F&B / RESTAURANT

GF

3,622.14

336.51

336.51

70

84,126.87

Building 13

Anchor

GF

24,228.32

2,250.88

2,250.88

15

450,176.78

F&B / RESTAURANT

GF

3,954.95

367.43

367.43

70

91,856.61

F&B / RESTAURANT

GF

4,592.48

426.66

426.66

70

106,663.86

F&B / RESTAURANT

GF

4,642.31

431.28

431.28

70

107,821.11

F&B / RESTAURANT

GF

4,402.93

409.05

409.05

70

102,261.35

SPA

MEZZ

29,367.78

2,728.36

2,728.36

25

682,088.79

Anchor ( Leisure)

GF+1

23,321.83

2,166.67

4,333.34

100

866,667.19

cinema

GF

131,175.84

12,186.63

12,186.63

50

3,046,657.24

cinema

MEZZ

11,012.94

1,023.14

1,023.14

50

255,783.88

428,400.80

39,799.72

45,704.79

Building 14

Building 15
Building 16
TOTAL

TOTAL

Public alleys

DESCRIPTION

Floor
s

Height

The Courtyards

Internal Walk B01-B13

GF

Stone Axis

Pedestal Main Walk

GF

Fine Dinning Courtyards

Internal Walk B14

GF

TOTAL

TOTAL

AREA
AREA
(SQ.FT) / FL (SQ.MTR)/FL

Total BUA
( SQ.MTR)

95,477.12

8,870.11

8,870.11

45,067.09

4,186.87

4,186.87

10,542.94

979.47

979.47

151,087.15

14,036.45

14,036.45

10,086,877.61

Occ.
Laod
40
40
40

Est .TCL (W)


1,596,620.00
1,256,060.40
176,304.75
3,028,985.15

Avenues Phase 2

OVERALL COOLING LOAD


45,704.79

TOTAL COOLING
(KW)
10,090.00

14,036.45

3,030.00

Total preliminary Estimated cooling load

13,120.00

COOLED AREA (SQ.MTR)

March 2013

Avenues Phase 2

March 2013

Mechanical Requirements - Architectural space Allocation


Services

Ref.
Code

Item

Location

Water Tank

Basement
level
Basement
level / option
1

Fire
Fighting

Pump Room

Parking
Area /option
3

Water
Distribution

Irrigation
System

Drainage
System

Raw Water Tank

Booster Pump Room

Irrigation tank

Irrigation Pump Room

9
10

Parking
Area / option
2

Black water Pit & Sub Pump


Room
Parking gray Water Pit & Sub
Pump Room

Basement
level

Basement
level
Basement
level
Basement
level
Basement
level
Basement
level

Volume
QTY Capacity
(m3)
1

740.00

Shaft
Dimension
(m x m)

Area
(m2)

Room
Dimension

Notes

200

H= 3900mm (water level )

1000x1000
( access for
civil defence - 180 20000 x 9000
Direct from
GF)

refer to sketch #1

1000x1000
( access for
civil defense - 126 14000 x 9000
Direct from
GF)

refer to sketch #2

1000x1000
( access for
civil defence - 153 17000 x 9000
Direct from
GF)

refer to sketch #3

2 nos - 1000 x
800
200
(side access
opening )

750.00

81

9000 x 9000

45

12

4000 x 3000

15

5000 x 3000

4000 x 3000

Depth 2000 mm

4000 x 3000

Depth 2000 mm

Pit dim ( 1500


x 1500 )
Pit dim ( 1500
x 1500 )

H= 3900 mm ( water
level )
location refer to sketch
#4
(reference Dubai Water
req- attached )
4 set of pump to deliver
for 4 project zone
Approximate irrigated
Area of 1400 m2

Avenues Phase 2

MECHANICAL SERVICES LOCATIONS

F
W
T

BS
P

GS
P
BS
P

S/S - 4

FP
R

GS
P

S/S-1

BP
R

BS
P

GS
P

BP
R

D
W
T

D
W
T

S/S - GS
3
BS
P
P

March 2013

Avenues Phase 2

ELECTRICAL
INSTALLATIONS

March 2013

Avenues Phase 2

March 2013

ELECTRICAL INSTALLATIONS

POWER DELIVERY METHODOLOGY


LOAD ASSUMPTIONS
LOAD CLACULATIONS
AREA ALLOCATION PER S/S
RMU LOCATIONS
S/S LOCATIONS IN BASEMENT
ROOM SIZES FOR S/S (3 OPTIONS)
ELECTRICAL REQUIREMENTS
(Architectural Space Allocation)

Avenues Phase 2

March 2013

POWER DELIVERY METHODOLOGY

DEWA NETWORK

DIFFERENT LOADS
PANELS
(LIGHT & POWER)

RMU ROOM

TRANSFORMERS

DISTRIBUTION PANELS
SMDBS & DBS

MAIN LV

Avenues Phase 2

March 2013

LOAD ASSUMPTIONS

AREA RATIO

TOTAL
100
AREA
m2
Load
KW
F
LIGHT
2.28
&
POWER 49.20
B
COOLIN
LI
G
8.40
G
59.88
H TOTAL
T

598.8

60%
Front of
Shop

40%

Kitchen

60 m2

24 m2

W / m2
30
20

W / m2
20
2000

40

250

AREA RATIO

TOTAL
KW
300
AREA
m2
Load
KW
F
5.04
Watts / SQR.MTR & LIGHT
POWER 61.20
B
COOLIN
R
G
25.20
E
ST TOTAL 91.44
U
R

60%
Front of
Shop

40%
Kitchen

180 m2

72 m2

W / m2
20
20

W / m2
20
800

40

250
KW

Avenues Phase 2

March 2013

LOAD ASSUMPTIONS
ANCHOR /
TYPE
RETAIL
UNIT
W / m2
LIGHT
50
POWER
COOLIN
G
TOTAL

ENTERTAINMENT
ANCHOR

SPA

W / m2
30

W / m2
10

60

100

300

40

40

40

150

170

350

Avenues Phase 2

LOAD CALCULATIONS
BASED ON DESIGN BRIEF

March 2013

Avenues Phase 2

LOAD ASSUMPTIONS
TYPE

KW (E)

COOLING VIA CHILLER

6,560

COOLING VIA DX

7,497

+40
W/M2

March 2013

Avenues Phase 2

LOAD CALCULATIONS
BASED ON DESIGN BRIEF

March 2013

Avenues Phase 2

March 2013

LOAD CALCULATIONS
BASED ON DIFFERENT COOLING OPTIONS
CHILLERS OPTION

21,647.06

DX OPTION

22,584.20

TRF =
19

TRF =
Chillers20
only 7
Transformers
7 Nos. @ 950KW
+
13 Nos. @
1200KW
19 Nos. @
1200KW

Maintenance by Client
Electricity cost by client vs.
billing tenants (BTU
Meters)
Available cooling load is
limited by Chiller Capacity

Machines are maintained


by tenants
Electricity Cost is passed
to tenants
Cooling load can increase
as much of spare
electricity is available.

CHILLER

Direct-Expansion (DX)

WHICH WAY TO GO ?
Avenues Phase 2

March 2013

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD
EXAMPLE 1
GLA
(sq.m.)
47

F&B
Designation
QS Fast

Brand 1

Electrica
l

W/m2

KFC

220.00

4,677.87

47

QS Fresh

Taco Bell

220.00

4,651.16

110

Casual

Nordsee

220.00

1,993.66

30

QS Fast

50.00

1,648.53

150.00

1,645.10

60.00

1,560.87

38

Coffee

BKK
Pizza Hut
Express
Costa

35

QS Fast

Wild Peeta

50.00

1,412.03

53

Coffee

Armani

70.00

1,330.55

53

Coffee

Fauchon

70.00

1,330.55

46

QS Fast

Shawarmerize It

50.00

1,089.56

48

QS Fast

Hattam

50.00

1,048.22

50

QS Fast

India

50.00

1,006.44

62

Impulse

Bateel

60.00

974.34

65

Coffee

Caribou

60.00

917.99

57

QS Fast

Subway

50.00

881.68

57

QS Fast

Al Safar

50.00

875.35

26

Impulse

Dunkin Donuts

22.00

840.34

73

Coffee

Starbucks

60.00

817.44

91

QS Fast

TOTAL
AREA
18 Units

989 M2
AVERAGE
W/M2

1,594
W/M2

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD
EXAMPLE 2
GLA
(sq.m.)
57

F&B
Designation
QS Fast

26

Impulse

Dunkin Donuts

22.00

840.34

73

Coffee

Starbucks

60.00

817.44

63

QS Fast

Fat Burger

50.00

797.58

28

Impulse

40 Fruits

22.00

787.12

136

Casual

Nandos

100.00

735.29

83

Coffee

Coffee House

60.00

720.55

70.00

697.42

50.00

690.70

70.00

672.43

India Palace

50.00

646.50

Panda Chinese

50.00

635.73

70.00

633.08

100
72
104

W/m2

Al Safar

50.00

875.35

Ethnic Casual Ottolenghi


QS Fast

Pad Thai

Ethnic Casual Nova

77

QS Fresh

79

QS Fast

111

Electrica
l

Brand 1

Ethnic Casual Yo Sushi

TOTAL
AREA
13 Units

1,010 M2
AVERAGE
W/M2

734 W/M2

Avenues Phase 2

March 2013

LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD
EXAMPLE 1
F&B

10 /50 /100
@ 700 W/M
UNITS
?

9,476.00 SQ.MTR

569
KW /
UNIT

SO

SIZ
E/
QTY

114
KW /
UNIT

USE

LOA
D

57
KW /
UNIT

Avenues Phase 2

AREA ALLOCATION PER S/S


`

S/S-3

B10

S/S-1

RMU-3

B08

B09
RMU-1

B03
B01

B05
B07

B02
B04

S/S-2

RMU-2

B06
RMU-4

S/S-4

March 2013

Avenues Phase 2

S/S LOCATIONS IN BASEMENT

S/S - 4

S/S - 1
S/S-1
S/S - 2

S/S - 3

March 2013

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION 1

TRANSFORMER ROOM
162 m2

4
Nos.

9 Mtr.

4.5 Mtr.

36 Mtr. (9x4)

LV ROOM
126 m2

8 Mtr.

GENERATOR
ROOM
24 m2

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION 2

TRANSFORMER ROOM
162 m2

18 Mtr.

9 Mtr.

18 Mtr. (9x2)

LV ROOM
135 m2

9 Mtr.

GENERATOR
ROOM
27 m2

4
Nos.

Avenues Phase 2

March 2013

ROOM SIZES IN BASEMENT - OPTION

<4
Nos.

9 Mtr.

TRANSFORMER ROOM
81 m2
LV ROOM
81 m2

GENERATOR
ROOM
40.5 m2

18 Mtr. (9x2)

4.5 Mtr.

Avenues Phase 2

March 2013

ELECTRICAL REQUIREMENTS - Architectural Space Allocation

Servic
es

QTY

Minimum
Volume
Capacity
(m3)

N/A

N/A

38

3.1

N/A

N/A

38

3.1

N/A

N/A

38

3.1

RMU ROOM-4

N/A

N/A

38

3.1

TRANSFORMER
ROOM-1

N/A

N/A

148

3.1

TRANSFORMER
ROOM-2

N/A

N/A

148

3.1

N/A

N/A

148

3.1

N/A

N/A

148

3.1

Item

Location

RMU ROOM-1

HV
Rooms

Transfo
rmer
Rooms

RMU ROOM-2
RMU ROOM-3

TRANSFORMER
ROOM-3
TRANSFORMER
ROOM-4

GROUND
LEVEL

BASEMENT
LEVEL

Min.
Shaft
Area
Dimension
(m x m)
(m2)

Minimum
Height (m)

Notes

SUBJECT TO DEWA
APPROVAL

SUBJECT TO DEWA
APPROVAL

Avenues Phase 2

March 2013

ELECTRICAL Requirements - Architectural Space Allocation


Servic
es

Item

LOW VOLTAGE
PANELS ROOM-1

LV
Rooms

LOW VOLTAGE
PANELS ROOM-2
LOW VOLTAGE
PANELS ROOM-3
LOW VOLTAGE
PANELS ROOM-4

Qt
y

Minimum
Volume
Capacity
(m3)

N/A

N/A

125

3.5

ADJACENT 1
TO
TRANSFORM
ER ROOM 1

N/A

N/A

125

3.5

N/A

N/A

125

3.5

N/A

N/A

125

3.5

N/A

N/A

24

3.5

Location

ADJACENT
TO
GENERATOR ROOMTRANSFORM 1
1
ER ROOM-2
ADJACENT
Genera
TO
tor GENERATOR ROOMTRANSFORM 1
2
Rooms
ER ROOM-3
ADJACENT
GENERATOR ROOMTO
1
3
TRANSFORM
ER ROOM-4

Shaft
Minimu
Minimum Height
Dimension m Area
(m)
(m x m)
(m2)

Notes

SUBJECT TO DEWA
APPROVAL

N/A

N/A

24

3.5

N/A

N/A

24

3.5

Room includes Diesel


Tank Good for 8 hours