PROJECT : Design & Build Contract for FIFA Readiness Project 3B Surface and Ground
Water Network at Al Thumama C851/B
Dear Madam,
We thank you very much for your interest in AUCC Precast Factory and we are pleased to submit our price
offer for Supply of RC Jacking Pipes and additional requirement.
2. Scope of Works
Our scope of works covers the followings:
Preparation of suitable moulds as per the requirement
Cutting, bending and placing the steel reinforcement in moulds as per the details in the final
production drawings
Casting and curing the pipes in our precast yard under AUCC quality control procedure.
Delivery of precast concrete units to the project site using AUCC trailer facilities but excluding the
offloading works
4. Specifications
Production of pipes will be carried out in accordance with our Precast Quality Control Management
Procedure and confirming to QCS 2014 requirements.
6. Exclusions
Any type of coated or special treated reinforcement steel
Any special embedment other than mentioned in BoQ
External laboratory testing and Third Party Inspection
Any work which is not mentioned in our offer.
For Storage of Pipes at AUCC Factory beyond 7 days, storage cost shall be payable by Main
Contractor.
7. Schedule of Delivery
Production shall be commenced within 1 week upon receipt of advance payment.
Schedule of delivery shall be mutually agreed as per production capacity and client requirement.
1 RC Jacking Pipes Lined with HDPE, ID1000mm, OD 1280mm LM 557 1,277.33 711,472
Note – Total Price: AUCC Offer is based on assumption that whole quantity will be awarded as single
contract and if there is any deduction in B.O.Q quantity, AUCC reserves its right to revise the rates
Material price Escalation: AUCC Estimation is based on the material price in the market as on
October 2020, and if the raw material prices increase beyond 5% at the time of award of the sub-
contract or during execution of the project, AUCC reserves its right to charge extra for the material
price Increase plus 10% overhead costs extra.
We trust you will find our price offer technically and commercially attractive. Please contact us if you need
further clarifications. We would be pleased to discuss further details at your convenience.
Yours faithfully,
___________________________
Mohamad Ali Zantout
General Manager
AUCC PRECAST FACTORY W.L.L