Professional Documents
Culture Documents
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: HDPE Perforated Pipes for Gravity Surface Water Drainage
Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 25/Sep/21 Comparison Sheet No. PJ17-DZ-57
Request Date 25-Sep-21 Project Reference.: PJ017 Department: PO Number: PJ017‐UIV‐271‐2020
Requisition No. 199 Material Type: HDPE Perforated Pipes for Gravity Surface Water Drainage
1 SW400-5112123 Meter 2,000 Half Perforated Pipe-HDPE, OD 560mm, SDR 17 221.85 443,700.00 320.00 640,000.00 337.95 675,900.00 453.20 906,400.00 401.65
803,300.00
Special Discount
Revised rates due to the price Global Changes of Raw Material
as received from the suppliers
Grand Total 443,700.00 640,000.00 675,900.00 906,400.00 803,300.00
PJ017‐UIV‐271‐2020 for HEPWORTH Cost Control Comments: Payment terms: LC 90 Days LC 90 Days LC 90 days LC 90 days Credit 90 Days
Delivery Time: as per site requirement as per site requirement as per site schedule as per site schedule as per site schedule
Brand / Origin Hepworth / Qatar Hepworth / Qatar APF / Qatar QPLAST / Qatar DRPS /Qatar
Warranty as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement
Recommendation: Ashghal PVL Listed in PVL Listed in PVL Listed in PVL Listed in PVL Listed in PVL
Tel./Mob. No. 3303 0197 / 5552 7626 3303 0197 / 5552 7626 3325 6313 5557 6530 5075 8117
Other
Recommended Award Value QAR 640,000.00 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET
Sr Procurement Cost Control Project Manager Project Director Procurement Manager Operations Support Operations Director Finance Director
Engineer Director Bassam Kataw Mohammad Kreik
Dima Zareefa Moath Qasem Jehad Al Afranji Radi Shunnar Tarek Turabieh Khaled Eid
02/15/202308:19:39 Page 1 of 2
STANDARD OPERATING PROCEDURE FORM NO
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: HDPE Perforated Pipes for Gravity Surface Water Drainage
Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 5/Jul/20 Comparison Sheet No. PJ17-DZ-03
Request Date 2-Jul-20 Project Reference.: PJ017 Department: PO Number:
Requisition No. 199 Material Type: HDPE Perforated Pipes for Gravity Surface Water Drainage
1 Meter 1,200 Half Perforated Pipe-HDPE, OD 900mm, SDR 17 0.00 1,182.06 1,418,472.20 980.00 1,176,000.00 865.00 1,038,000.00
2 Meter 7,120 Half Perforated Pipe-HDPE, OD 560mm, SDR 17 0.00 290.44 2,067,932.80 221.85 1,579,572.00 224.68 1,599,721.60
Special Discount
In the tender stage we had only Delivery INCOTERM: Site Site Site
600mm HDPE perforated pipes.
This Budget is provided Delivery Time: as per site requirement as per site requirement as per site schedule
irrespective of BOQ reference.
Brand / Origin QNPF / Qatar Hepworth / Qatar APF / Qatar
Warranty as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement
Recommendation: Ashghal PVL Listed in PVL Listed in PVL Listed in PVL
Other
Recommended Award Value QAR 2,617,572.00
Prepared By: Cost Control Project Manager Project Director Procurement Director Operations Support Operations Director Finance Manager Managing Director
Director Bassam Kataw Mohammad Kreik Khaldoun Jabr
Dima Zareefa Jiss Tom Thahir Abbas Radi Shunnar Ramzi Abedrabbo Khaled Eid
02/15/202308:19:39 Page 2 of 2