You are on page 1of 2

STANDARD OPERATING PROCEDURE FORM NO

UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: HDPE Perforated Pipes for Gravity Surface Water Drainage

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 25/Sep/21 Comparison Sheet No. PJ17-DZ-57
Request Date 25-Sep-21 Project Reference.: PJ017 Department: PO Number: PJ017‐UIV‐271‐2020
Requisition No. 199 Material Type: HDPE Perforated Pipes for Gravity Surface Water Drainage

Cost Control Hepworth PME DOHA REGIONAL PLASTIC


BUDGET PO RATE Hepworth PME Advance Plastic Factory Q-PLAST SPLUTIONS
Sr. Cost Code BOQ Ref. Unit Qty. Description
Qty Rate Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR

Supply & Delivery of HDPE Perforated Pipes fully comply


with QCS2014, Ashghal Spes and Approved MAS

1 SW400-5112123 Meter 2,000 Half Perforated Pipe-HDPE, OD 560mm, SDR 17 221.85 443,700.00 320.00 640,000.00 337.95 675,900.00 453.20 906,400.00 401.65
803,300.00

Comments: Total QAR 0.00 443,700.00 640,000.00 675,900.00 906,400.00 803,300.00

Special Discount
Revised rates due to the price Global Changes of Raw Material
as received from the suppliers
Grand Total 443,700.00 640,000.00 675,900.00 906,400.00 803,300.00

These Quantities will be deducted from PO No#


AWARD 640,000.00

PJ017‐UIV‐271‐2020 for HEPWORTH Cost Control Comments: Payment terms: LC 90 Days LC 90 Days LC 90 days LC 90 days Credit 90 Days

Delivery INCOTERM: Site Site Site Site Site

Delivery Time: as per site requirement as per site requirement as per site schedule as per site schedule as per site schedule

Brand / Origin Hepworth / Qatar Hepworth / Qatar APF / Qatar QPLAST / Qatar DRPS /Qatar

Warranty as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement
Recommendation: Ashghal PVL Listed in PVL Listed in PVL Listed in PVL Listed in PVL Listed in PVL

Approval Status to be submitted to be submitted to be submitted to be submitted to be submitted


HEPWORTH_Approved Supplier
Contact Person Deepak / Ahmad Al Afandi Deepak / Ahmad Al Afandi Ferdinand Abdul Azeez Sojan Mathew

Tel./Mob. No. 3303 0197 / 5552 7626 3303 0197 / 5552 7626 3325 6313 5557 6530 5075 8117

Other
Recommended Award Value QAR 640,000.00 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET

Sr Procurement Cost Control Project Manager Project Director Procurement Manager Operations Support Operations Director Finance Director
Engineer Director Bassam Kataw Mohammad Kreik

Dima Zareefa Moath Qasem Jehad Al Afranji Radi Shunnar Tarek Turabieh Khaled Eid

02/15/202308:19:39 Page 1 of 2
STANDARD OPERATING PROCEDURE FORM NO
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: HDPE Perforated Pipes for Gravity Surface Water Drainage

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 5/Jul/20 Comparison Sheet No. PJ17-DZ-03
Request Date 2-Jul-20 Project Reference.: PJ017 Department: PO Number:
Requisition No. 199 Material Type: HDPE Perforated Pipes for Gravity Surface Water Drainage

Cost Control Castle for Building Materials


BUDGET Qatar National Plastic Factory Hepworth PME Co. WLL
Sr. Cost Code BOQ Ref. Unit Qty. Description
Qty Rate Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR

Supply & Delivery of HDPE Perforated Pipes fully comply


with QCS2014, Ashghal Spes and Approved MAS

1 Meter 1,200 Half Perforated Pipe-HDPE, OD 900mm, SDR 17 0.00 1,182.06 1,418,472.20 980.00 1,176,000.00 865.00 1,038,000.00

2 Meter 7,120 Half Perforated Pipe-HDPE, OD 560mm, SDR 17 0.00 290.44 2,067,932.80 221.85 1,579,572.00 224.68 1,599,721.60

Half Perforated HDPE-PIPE-DIA600-MM 11,986.00 270.00 3,236,220.00

Comments: Total QAR 3,236,220.00 3,486,405.00 2,755,572.00 2,637,721.60

Special Discount

Grand Total 3,486,405.00 2,755,572.00 2,637,721.60

AWARD 1,579,572.00 1,038,000.00

Cost Control Comments: Payment terms: LC 60 days LC 90 Days LC 90 days

In the tender stage we had only Delivery INCOTERM: Site Site Site
600mm HDPE perforated pipes.
This Budget is provided Delivery Time: as per site requirement as per site requirement as per site schedule
irrespective of BOQ reference.
Brand / Origin QNPF / Qatar Hepworth / Qatar APF / Qatar

Warranty as per Ashghal requirement as per Ashghal requirement as per Ashghal requirement
Recommendation: Ashghal PVL Listed in PVL Listed in PVL Listed in PVL

Approval Status to be submitted to be submitted


Castle for Building Materials Co. WLL: for 900mm HDPE Pipe
Contact Person Bakar / Azeez Deepak / Ahmad Al Afandi Ferdinand
Hepworth PME: for 560mm HDPE Pipe Tel./Mob. No. 3318 9151 / 5557 6530 3303 0197 / 5552 7626 3325 6313

Other
Recommended Award Value QAR 2,617,572.00

Prepared By: Cost Control Project Manager Project Director Procurement Director Operations Support Operations Director Finance Manager Managing Director
Director Bassam Kataw Mohammad Kreik Khaldoun Jabr

Dima Zareefa Jiss Tom Thahir Abbas Radi Shunnar Ramzi Abedrabbo Khaled Eid

02/15/202308:19:39 Page 2 of 2