IR-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.110
Roads and Infrastructure in West Muaither (Al Manaseer) - (DW002-P02) GBP 4.760
PAGE
DI Pipes & fittings for Potable water
Requestor Name Amr Al kurdi Project Name: Roads and Infrastructure in West Muaither (Al Manaseer) - Date: 7-Nov-20 Comparison Sheet No. PJ012-DZ-05
Request Date 1-Nov-20 Project Reference.: PJ0012 Department: Technical PO Number:
Requisition No. 1238 Material Type: DI Pipes & fittings for Potable water
Cost Control
BUDGET SAINT GOBAIN UPTC ELACTROSTEEL
Sr. Cost Code BOQ Ref. Unit Qty. Description
1 Nos. 16 ALL SOCKET TEE ø 100 X 100 X 100 209.00 3,344.00 270.00 4,320.00 285.21 4,563.38
Nos. 10 ALL SOCKET TEE ø 100 X 100 X 100 282.00 2,820.00 270.00 2,700.00 285.21 2,852.11
2 Nos. 1 ALL SOCKET TEE ø 150 X 150 X 150 293.00 293.00 350.00 350.00 475.38 475.38
3 Nos. 1 ALL SOCKET TEE ø 200 X 200 X 150 381.00 381.00 0.00 651.05 651.05
4 Nos. 3 ALL SOCKET TEE ø 300 X 300 X 150 2,575.00 7,725.00 0.00 985.50 2,956.50
6 Nos. 27 FLANGE SPIGOT WITH PUDDLE ø 100, 675mm Length 2,126.00 57,402.00 545.00 14,715.00 414.20 11,183.40
(375mm to Flange)
7 Nos. 10 FLANGE SPIGOT WITH PUDDLE ø 150, 675mm Length 2,978.00 29,780.00 800.00 8,000.00 609.56 6,095.60
(375mm to Flange)
Warranty As per Authority requirements As per Authority requirements As per Authority requirements
Recommendation:
Ashghal/Kahramaa PVL Listed in the PVL Listed in the PVL Listed in the PVL
Remarks
Recommended Award Value QAR 35,025.50 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET
Sr. Procurement Cost Control Project Manager Project Director Procurement Director Operations Support Director
Engineer
Khalid Eid
Dima Zareefa Zeeshan Shahid Nassim Al Omari Radi Shunnar Ramzi Abedrabo
02/23/202312:12:54 Page 1 of 3
STANDARD OPERATING PROCEDURE FORM NO
IR-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.110
Roads and Infrastructure in West Muaither (Al Manaseer) - (DW002-P02) GBP 4.760
PAGE
DI Pipes & fittings for Potable water
Requestor Name Amr Al kurdi Project Name: Roads and Infrastructure in West Muaither (Al Manaseer) - Date: 7-Nov-20 Comparison Sheet No. PJ012-DZ-05
Request Date 1-Nov-20 Project Reference.: PJ0012 Department: Technical PO Number:
Requisition No. 1238 Material Type: DI Pipes & fittings for Potable water
Cost Control
BUDGET SAINT GOBAIN UPTC ELACTROSTEEL
Sr. Cost Code BOQ Ref. Unit Qty. Description
02/23/202312:12:55 Page 2 of 3
SN Descrition Unit QTY
Supply & Delivery of Ductile Iron Pipes
& Fittings for Potable water network
fully complying with Kahramaa
Specification
Unit Total
SN Description Qty Unit Rate Amonut
Supply & Delivery of Ductile Ironn Pipes & Fittings for Potable water networks
fully complying with Kahramaa Specification
1 ALL SOCKET TEE ø 100 X 100 X 100 16 Nos. 209.00 3,344.00
Total 14,790.00
Total 6,975.98