You are on page 1of 4

STANDARD OPERATING PROCEDURE FORM NO

UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: RC Jacking Pipes & Short Pipes for SW Network

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 29/Mar/21 Comparison Sheet No. PJ017-DZ-28-R01
Request Date 24-Feb-21 Project Reference.: PJ017 Department: PO Number:
Requisition No. 542 Material Type: RC Jacking Pipes & Short Pipes for SW Network

Cost Control
DOHA PRECAST FACTORY AUCC PRECAST ADVANCED PIPEAS & CASTS
Sr. Cost Code BOQ Ref. Unit Qty. Description BUDGET CO. (APC)

Qty Rate Amount/QR Rate/QR Amount/QR

Supply & Delivery of Reinforced Concrete Jacking Pipes


3m Length Lined with HDPE 2.3 mm including Stainless
Steel Collar.

1 SW401-5112133 L.m 215 Pipe diameter 1000mm, OD-1280mm 865.00 185,975.00 1,277.33 274,625.95

Comments: Total QAR 0.00 185,975.00 274,625.95

Special Discount

Grand Total 185,975.00 274,625.95

AWARD 185,975.00

Cost Control Comments: Payment terms: LC 60 Days TBA NO SUPPLY

Total Budget = 18,417,551 Delivery INCOTERM: Site Site


Committed todate =
24,694,710 Delivery Time: TBA As per site schedule

Brand / Origin Doha Precast Factory AUCC-Qatar

Warranty As per Ashghal Requirement As per Ashghal Requirement


Recommendation: Ashghal PVL No. PVL No. PVL

Approval Status To be Submitted To be Submitted


DOHA PRECAST FACTORY: Best Price & Good Terms
Remarks Lined with 2.3mm HDPE Lined with HDPE

Recommended Award Value QAR 185,975.00 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET

Sr. Procurement Cost Control Project Manager Project Director Procurement Manager Operations Support Director Operations Director
Engineer Bassam Kataw

Dima Zareefa Jiss Tom Jehad Al Afrangi Radi Shunnar Tarek Turabieh Khaled Eid

Operations Director Finance Director Executive Director- Managing Director Khaldoun UCC Cost Control Director UCC Holding UCC Holding CEO /
Bassam Kataw Mohammad Kreik Operations Ziad Kamel Jabr Finance Head or PIH MD
OVER BUDGET APPROVAL

02/12/202305:51:21 Page 1 of 4
STANDARD OPERATING PROCEDURE FORM NO
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: RC Jacking Pipes & Short Pipes for SW Network

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 29/Mar/21 Comparison Sheet No. PJ017-DZ-28-R01
Request Date 24-Feb-21 Project Reference.: PJ017 Department: PO Number:
Requisition No. 542 Material Type: RC Jacking Pipes & Short Pipes for SW Network

Cost Control
DOHA PRECAST FACTORY AUCC PRECAST ADVANCED PIPEAS & CASTS
Sr. Cost Code BOQ Ref. Unit Qty. Description BUDGET CO. (APC)

Qty Rate Amount/QR Rate/QR Amount/QR

Supply & Delivery of Reinforced Concrete Jacking Pipes


3m Length Lined with HDPE 2.3 mm including Stainless
Steel Collar.

1 SW401-5112133 L.m 215 Pipe diameter 1000mm, OD-1280mm 865.00 185,975.00 1,277.33 274,625.95

Comments: Total QAR 0.00 185,975.00 274,625.95

Special Discount

Grand Total 185,975.00 274,625.95

AWARD 185,975.00

Cost Control Comments: Payment terms: LC 60 Days TBA NO SUPPLY

Total Budget = 18,417,551 Delivery INCOTERM: Site Site


Committed todate =
24,694,710 Delivery Time: TBA As per site schedule

Brand / Origin Doha Precast Factory AUCC-Qatar

Warranty As per Ashghal Requirement As per Ashghal Requirement


Recommendation: Ashghal PVL No. PVL No. PVL

Approval Status To be Submitted To be Submitted


DOHA PRECAST FACTORY: Best Price & Good Terms
Remarks Lined with 2.3mm HDPE Lined with HDPE

Recommended Award Value QAR 185,975.00 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET

Sr. Procurement Cost Control Project Manager Project Director Procurement Manager Operations Support Director Operations Director
Engineer Bassam Kataw

Dima Zareefa Jiss Tom Jehad Al Afrangi Radi Shunnar Tarek Turabieh Khaled Eid

Operations Director Finance Director Executive Director- Managing Director Khaldoun UCC Cost Control Director UCC Holding UCC Holding CEO /
Bassam Kataw Mohammad Kreik Operations Ziad Kamel Jabr Finance Head or PIH MD
OVER BUDGET APPROVAL

02/12/202305:51:21 Page 2 of 4
STANDARD OPERATING PROCEDURE FORM NO
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: RC Jacking Pipes & Short Pipes for SW Network

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 31/Jan/21 Comparison Sheet No. PJ017-DZ-23
Request Date 31-Jan-21 Project Reference.: PJ017 Department: PO Number:
Requisition No. 506 Material Type: RC Jacking Pipes & Short Pipes for SW Network

Cost Control
DOHA PRECAST FACTORY AUCC PRECAST ADVANCED PIPEAS & CASTS
Sr. Cost Code BOQ Ref. Unit Qty. Description BUDGET CO. (APC)

Qty Rate Amount/QR Rate/QR Amount/QR

Supply & Delivery of Reinforced Concrete Jacking Pipes


3m Length Lined with HDPE 2.3 mm including Stainless
Steel Collar.

1 L.m 558 Pipe diameter 1000mm, OD-1280mm 317,717.00 865.00 482,670.00 1,277.33 712,750.14

2 L.m 78 Pipe diameter 2000mm, OD-2400mm 2,434.00 189,852.00 3,291.98 256,774.44


0.00

3 L.m 21 Pipe diameter 2000mm, OD-2400mm with Nozzles 2,473.00 51,933.00 3,563.44 74,832.24
0.00

4 Nos. 9 RCJ Short Pipes ID 1000mm, OD 1280 (L=1200mm) 0.00 2,800.00 25,200.00 1,192.90 10,736.10

Comments: Total QAR 317,717.00 749,655.00 1,055,092.92

Special Discount

Grand Total 749,655.00 1,055,092.92

AWARD 749,655.00

Cost Control Comments: Payment terms: LC 60 Days TBA NO SUPPLY


Budget is given by
considering the already Delivery INCOTERM: Site Site
approved comparison
sheet. Delivery Time: TBA As per site schedule
(147.64x865)- 900mm
HDPE Brand / Origin Doha Precast Factory AUCC-Qatar
(309.46x614)- 1000 RC
gravity Warranty As per Ashghal Requirement As per Ashghal Requirement
Recommendation: Ashghal PVL No. PVL No. PVL

Approval Status To be Submitted To be Submitted


DOHA PRECAST FACTORY: Best Price & Good Terms
Remarks Lined with 2.3mm HDPE Lined with HDPE

Recommended Award Value QAR 749,655.00 OVER BUDGET ….... OVER BUDGET …... OVER BUDGET

Sr. Procurement Cost Control Project Manager Project Director Procurement Director Operations Support Director Operations Director Finance Manager
Engineer Bassam Kataw Mohammad Kreik

Dima Zareefa Jiss Tom Jehad Al Afrangi Radi Shunnar Ramzi Abedrabbo Khaled Eid

02/12/202305:51:21 Page 3 of 4
STANDARD OPERATING PROCEDURE FORM NO
UIV-PRC-SF-002-03
COMPARISON SHEET Currency USD 3.650 EUR 4.100
Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B GBP 4.760
PAGE
Description of Items: RC Jacking Pipes & Short Pipes for SW Network

Requestor Name Rana Torman Project Name: Design & Build Contract for FIFA Readiness Project 3B Surface and Ground Water Network at Al Thumama C851/B Date: 31/Jan/21 Comparison Sheet No. PJ017-DZ-23
Request Date 31-Jan-21 Project Reference.: PJ017 Department: PO Number:
Requisition No. 506 Material Type: RC Jacking Pipes & Short Pipes for SW Network

Cost Control
DOHA PRECAST FACTORY AUCC PRECAST ADVANCED PIPEAS & CASTS
Sr. Cost Code BOQ Ref. Unit Qty. Description BUDGET CO. (APC)

Qty Rate Amount/QR Rate/QR Amount/QR

Supply & Delivery of Reinforced Concrete Jacking Pipes


3m Length Lined with HDPE 2.3 mm including Stainless
Steel Collar.

Operations Director Finance Manager Managing Director Khaldoun UCC Cost Control Director UCC Holding UCC Holding CEO /
Bassam Kataw Mohammad Kreik Jabr Finance Head or PIH MD
OVER BUDGET APPROVAL

02/12/202305:51:21 Page 4 of 4