1. Review of MTC's for material procured from KNPC STD. 50P1, 50P2, 50A11, KNPC STD. 50P1, 50P2, 50A11,
2 MATERIAL MTCs - H R/A
KNPC approved manufacturers. 50A13 50A13
KNPC STD. 50P1, 50P2, 50A11, KNPC STD. 50P1, 50P2, 50A11, PRJ-QMS-9C-03-5213 REV-2
2. Material Receiving Inspection at site. - H W
50A13 50A13 Shell DEP PRJ-QMS-9I-02-5084 REV-02
3. Review of batch certificate of welding filler Contract Specification / ASME Section Contract Specification / ASME
Batch Certificates - H R/A
wires and electrodes. II Part C / WPS Section II Part C / WPS
PIPING WORKS
PRJ-QMS-9I-02-5078 REV-2
5 TESTING 1. Visual Inspection of Weld joints OG-EPC-002-07-GE-0060 ASME B 31.3 Shell DEP PRJ-QMS-9I-01-5071 REV-1 - H W
4. Thickness survey APPROVED DRAWING P & ID / Approved dwgs KNPC QMS FORMS H W W2
10.Punchlist befor Hydrostatic / Pneumatic test OG-EPC-002-03-GE-0120 Contract specification PRJ-QMS-9C-02-5054 REV-1 - W W
11.Material teacibility check OG-EPC-002-03-GE-0120 KNPC 54C1 / 93C8 Shell DEP KNPC QMS FORMS - W R/A
8 FINAL DOCUMENTATION 1. Final Punchlist clearance P & ID / Approved dwgs P & ID / Approved dwgs PRJ-QMS-9C-02-5054 REV-1 - H H