Professional Documents
Culture Documents
0 PERSONAL DETAILS
Name: Chong Chin Chan, Charlie
Nationality: Malaysian
Date of Birth: 1958-October 9th
Home Base: Shanghai
Academic qualifications.
◼ Diploma in Ferrous Metallurgy awarded by Material Engineering Institute, ASM, OH, USA.
◼ Certificate in Mechanical Engineering awarded by City & Guild, London, UK.
◼ GCE ‘A’ level awarded by Cambridge University LES, UK.
5.0 CERTIFICATIONS
Undersign has been working in the oil and gas industries both onshore and offshore fabrication
works with responsibility for approximately 23 years. Working as yard supervisor, inspector and
NDT technician, providing supervision & inspection and to API5L mill inspection, API6A/16A/6D
wellhead, X’mas tree and valve manufacturing, OCTG API5CT mill inspection, offshore pipeline
installation , derrick fabrications, heat exchanger & pressure vessels inspection to ASME VIII.
For the past few years’ major involvements are inspection and fabrication surveillances of Ultra
Deepsea Derrick for National Oilwell Varco Shanghai and Derrick tools for Aker Solutions. Work
scopes primarily involved, derrick, crown block fabrication, high pressure mudline, cementline and
production line fabrication to ASME B31.3 Normal & High pressures. API6A/16A/6D wellhead,
X’mas tree and valve manufacturing.
Undersign is familiar with following standards and codes requirements, among others:
Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API5L, API RP2A
WSD, API2B, API2H, API Spec 6A Specification for Wellhead and Christmas Tree Equipment, API
Spec. API Spec 6D, Specification for Pipeline and Piping Valves, API Apec 16A Specification for
Drill Through Equipment, API5CT, API Spec 4F, Specification for Drilling and Well Servicing
Structures, API RP49, API RP55, API1104, API620, AWS D1.1, AISC 360, NACE RP001, NACE
MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/VIII/IX, SSPC
specs, NFPA 70, API RP 500B, DNV RP B401, BS7361 and DNV-OS-F101(2000), ANSI/AISC 360
codes. DNV-OS-E101, C401, B401, B101, F101- Submarine Pipeline and other DNV-OS rules.
China National GB Specifications and CNPC SY Specifications.
7.1
Employment period : December 2016 – March 2018
Employer : Technip Geo-Production Malaysia
Position : Subject Matter Expert- NDE/Welding
Client : Seconded to Petronas PIC
Location : Malaysia
Project : PIC- Petronas Integrated Project
Brief description:
PIC is PETRONAS' largest investment in Malaysia, located in Pengerang, Johor and forming part of
Johor state's ambitious Pengerang Integrated Petroleum Complex (PIPC). The PIC project is
designed to produce premium differentiated petrochemicals; meeting domestic demand for
petroleum products and the Malaysian government's future legislative requirements on the
implementation of Euro 5. With total investment of USD27 billion.
Brief description:
Work as a surveyor at DNV Energy Shanghai, PR China, providing inspection and certification
services to ultra-deep water offshore drillship derrick fabrication works. The applicable codes and
standards were;
- API Spec 4F “Spec. for Drilling and Well Servicing Structures” 2nd Edition.
- API 6A “API Spec 6A Specification for Wellhead and Christmas Tree Equipment”.
- AWS D1.1 Welding of Steel Structure 2008.
- AISC Manual of steel construction, 13th editions.
- DNV Offshore Standard DNV-0S-El01 "Drilling Plant", October 2008.
- DNV Offshore Standard DNV-OS-F101 “Submarine pipeline System” 2010.
- DNV Offshore Standard DNV-0S-C101 "Design of Offshore Steel Structures, General (LRFD
method)", April 2008.
- NACE MR0175 -2009 Petroleum and natural gas industries - Materials for use in
H2S-containing environments in oil and gas production
- SSPC codes for painting and surface preparations.
- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation
compliance assessment to API RP49 & API RP55.).
- Consultancy inspection and certification on quality conformity of project construction for Ninh
Binh Urea Fertilizer Plant to GB/T Chinese Code & Standards.
- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation
compliance assessment to API RP49 & API RP55 to COOSO requirements.)
- Nabor Drilling – NDUSA & Nabor International drill rigs fabrication at SJ Yard.
- NDC – National Drilling Company Abu Dhabi UAE land based drill rig at Baoji Yard
BOMCO.
Undersign is familiar with following standards and codes requirements, among others:
AWS D1.1-96, NACE MR01-75, ANSI B31.3, ASME section IX, API Spec 4F “Spec. for
Drilling and Well Servicing Structures” 2nd Edition. AWS D1.1 Welding of Steel Structure 2006.
AISC Manual of steel construction, 13th editions. DNV Offshore Standard DNV-0s-El0 1
"Drilling Plant", October 2006. DNV Offshore Standard DNV-0s-C101 "Design of Offshore
Steel Structures, General (LRFD method)", April 2004, API RP2A WSD, API2B, API2H, AWS
D1.1-96, NACE RP001, NACE MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8,
ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and
DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV
E101, DNV RP-F103, DNV RP-B403, Norsok standard in general.
References:
Mr. YP Tee. DNV Energy Country Manager 86-(0)21-62788086 yak.peik.tee@dnv.com, Mr. Bide
Alford NOV Shanghai Quality Director bide.alford@nov.com. Perstorp Formox AB Mr. Erik
Timander Erik.Timander@perstorp.com, Pan Chien CHIEN.Pan@conocophillips.com
Gazflot-II
Nabors Drilling land based drill rig B&E 5000 series at Loadmaster/SJ Yard.
Brief description:
Work as a Inspector / Surveyor in DNV Shanghai, PR China, providing PQMS inspection for CPC /
Shell JV at Changbei Gas Development Project. The project was a joint venture between China
National Petroleum Corporation (CNPC) and Shell China Exploration & Production Company Ltd.
(SCEPCO) to explore and develop gas resources at Changbei Block which will supply 3.0 bcm/yr of
natural gas during the plateau period.
Involved in PQMS Project Quality Management Services for main pipeline and networks
collecting pipelines and gas stations.
Establishing of coordination / communications with CNPC/SCEPCO and Main Contractors on
QA matters and field inspections.
Supervisory involvements on field inspection performed of Clients’ Inspector of Local
Inspection Agency.
Undersign is familiar with following standards and codes requirements, among others:
Shell DEP, AWS D1.1-96, NACE RP001, NACE MR01-75, API 1104, ANSI B31.2/31.4/31.8,
ASME section II/V/VII/IX, SSPC specs, China National GB specification and CNPC SY
specifications, API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE
MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC
specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE
TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV
RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com. Mr. Tan
Heng Lee, Lead QA Engineer Heng-Lee.Tan@shell.com
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Chunxiao Gas Field Development Project. The field is located in Donghai, 300KM off
Zhou Shan. It consisted of a Central Processing Platform and 2 Well Head Platforms and an Onshore
Collecting Terminal DFTS. The gas produced was collected by the CHX CEP collecting platform
and transferred to the Chunxiao via 300KM API 5LX56 sub-sea gas line.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to DF1-1 Gas Field Development Project. The field is located in Beibu Bay, 110KM off
Hainan Island. It consisted of a Central Processing Platform and 3 Well Head Platforms and an
Onshore Collecting Terminal DFTS. The gas produced was collected by the DF1-1 CEP collecting
platform and transferred to the Hainan Island via 110KM 22” API 5LX56 sub-sea gas line. There
was also a parallel sub-sea cable from the mainland to provide power to offshore consumers.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to QHD 32-6 Field Development Project. The field is located in Bohai Bay off Tangshan
City. It consisted of 6 production platforms and a FPSO. The project was a joint venture between
Arco, Texaco and CNOOC.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 and BS 7361, NACE TPC,DNV RP B401 and BS 7361, DNV B101,
References:
Mr. Huo Jinlin CNOOC, QHD 32-6 Chief Company Representative 086-022-25808664. Mr. YP Tee.
DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Weizhou Oil & Gas Field Development Project. The field is located in Beibu Bay off
Hainan Island. It consisted of 5 production platforms, namely WZ10-3C, WZ10-3A, WZ10-3AP,
WZ10-3B, WZ11-4A and WZ12-1 collecting platform. The gas & oil produced are collected by the
WZ12-1 collecting platform are transfer to the Weizhou Island via 12”/18” sub-sea oil line and 8”
sub-sea gas line which is located approximately 32km away.
References:
Curriculum Vitae of Charlie Chong updated on 2022 October / Page 25 of 40
Mr. Lu YuanFa. WZ12-1, Chief Company Representative, Deputy Project Manager
86-(0)759-3900338. Mr. YP Tee. DNV’s Offshore Services Manager 86-(0)21-62788086.
Weizhou 12-1
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Pinghu Oil & Gas Field Development Project. The field is located in East China Sea
approximately 400km south east of Shanghai. It consists of a single 6-legged self-contained drilling
and production platform with living quarter. Gas and oil produced are piped onshore via a 14” OD
gas line and a 10” OD oil pipeline to a gas processing plant and storage tanks onshore.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 and BS 7361.
Pinghu.
Brief description:
The MPP-KVDT Project consisted of 140km of 14” OD pipeline and a distribution terminal, inter
connected to Petronas refinery and Shell refinery, delivering multi-product to KL City, Klang valley
and the then newly constructed KL International Airport.
Klang Valley Distribution Terminal Start Date: March 1993 Completion Date: June 1998 The
project entailed engineering, procurement, construction and commissioning of a strategic storage and
distribution terminal with a capacity for storing up to 140,000 cubic meetings of hydrocarbon
products. The facility is located on a site of more than 60 acres in the Klang Valley corridor between
Kuala Lumpur and the West Coast of Malaysia. Gasoline and diesel products arrive at the terminal
via a multi-product pipeline from Petronas and Shell refineries at Melaka and Port Dickson. There
are individual storage facilities for leaded gasoline, unleaded gasoline and diesel, and a separate
injection additive facility to cater for the different fuel formulation requirements of Petronas and
Shell. The heart of the facility is the state-of-the-art computer control system, which is integrated
with the multi-product pipeline product control system and monitors and controls the loading of road
tankers. It also provides an accounting base for each of the Joint Venture partners (Petronas and
Shell).
References:
Ir. Chan FungSeng. Project Manager for Petronas / Shell JV (Petronas Dagangan Sdn. Bhd.) Tel:
603-7823700. Dato Wan Kamarrudin – Joint PM, Shell Malaysia Trading Sdn Bhd. Tel:
603-7823700.
Brief description:
Work as a surveyor in DNV Singapore, providing inspection and 3rd party certification services to
major oil & gas companies.
References:
Mr. YP Tee. Head of Facilities, Equipment & QA Department, DNV Singapore. Tel: 65-7796363. Mr.
Tan Kah Seng- Process Engineer Heerema Far East Pte. Ltd. Tel: 65-2251085.
Brief description:
Shell refinery jetty loading facilities, consisted of approximately 4km x 12 products of off-plot
pipelines. Ranging from 36” to 8” NPS, extended into the newly constructed marine
loading/receiving jetty, 2km into the Strait of Malacca.
References:
Mr. JT Goh-Project Quality Manager, Comprimo Malaysia Sdn Bhd. Tel: 65-7435378 Mr. Tan
Cheong Meng-Corrosion Specialist, Shell Refinery Port Dickson. Tel: 606-6471311
Brief description:
Petronas PGUP II consisted of approximately 750km of 36 inches API 5Lx70 transmission pipeline.
Delivering LNG to power station and tap off station for industrial reticulation. The pipeline covered
central and southern regions of Peninsular Malaysia and Singapore.
References:
Mr. Roy B Backeley-Senior Metallurgist, MMC Gas Sdn. Bhd. Tel: 403-2849140. Mr. Ong Nam
Siong-Deputy Quality Manager, MMC Gas Sdn. Bhd. Tel: 603-2547111.
7.14
Employment period : April 1989 to July 1990
Employer : Sabah Shipyard, Malaysia.
Position : General Inspector.
Project : Petronas “Dulang” Off –Shore Production Platforms.
Location : Malaysia
Brief description:
Curriculum Vitae of Charlie Chong updated on 2022 October / Page 35 of 40
Petronas “Dulang-A”, Production Platform and “Dulang-B” Living Quarter is situated in the South
China Sea “Dulang” fields.
References:
Mr. CM Cheyu Quality Control Manager, SASHIP Sdn Bhd. Tel: 087-41228. Mr. Rosli
Shafe-Quality Assurance Engineer, Petronas Carigali Tel: 087-412228.
Brief description:
Esso EPMI “Seligi-A” Project consisted of 5 production platforms and 3 no of dehydration
platform. Situated in the South China Sea off Trengganu, Peninsular Malaysia.
Shell St Joseph De-bottlenecking project consisted of a single platform for St Joseph Field
located in the South China Sea off Sarawak, Malaysia.
References:
Mr. Nordin Mat Yussoft-MSE Quality Control Manager. Tel: 607-2512111. Mr. Ong Nam Hwa-MSE
Quality Control Engineer. Tel: 607-2512111.
Brief description:
The project consisted of 120km of highway and bridges and toll facilities between Air Keroh and
Pagoh Interchanges, in the state of Malacca extended into the state of Johore, Malaysia.
References:
Mr. CG Patrick-Chief Resident Engineer, SSP Sdn Bhd. Tel: 606-982523. Mr. B.Jovanovic-Chief
Structural engineer, EnergoProject. Tel: 606-982520
References:
Ir. Hiam Hoon.-Resident Engineer Tel: 607-3222984
7.18
Employment period : August 1981- August 1983
Employer : Malaysian International Consultant Sdn Bhd.
Position : Inspector of Works.
Project : Western Johore Agricultural Development
Project (Phase I)
Location : Malaysia
References:
Ir. Mutiar Rahman-Resident Engineer Tel: 607-38373451