You are on page 1of 20

SCHEDULE “C”

ATTACHMENT I

CONTRACT PRICE BREAKDOWN

Item Description Amount (SR)


The Contract Price specified in Paragraph 1.1 of Schedule “C” is composed of the
following:
A. Design Price (Maximum 4% of total lump sum) 0.00
B. Materials Price 0.00
C. Construction Price 0.00
Total lump sum Contract Price 0.00
1 DESIGN PRICE BREAKDOWN
Amount (SR)
1.1 Mobilization/Demobilization
1.2 Deliverables
1.3 As-Built’s, Project record Books, Manuals
Total Design Price 0.00
2 MATERIALS PRICE BREAKDOWN
No. Materials Description Amount (SR)
2.1 Engineered Equipment
2.1.1 Switch Rack & Transformers
2.1.2 All Gear Operated and Manual Valves
2.1.3 All Motor Operated Valves
Engineered Equipment Total Price 0.00
2.2 Non-Engineered Equipment
2.2.1 Foundations
2.2.2 Backfill
2.2.3 Concrete
2.2.4 Fencing
2.2.5 Reinforcement
2.2.6 Structural Steel
2.2.17 Other Materials
Non-Engineered Materials Price 0.00
Total Major Materials Price 0.00
3 CONSTRUCTION PRICE BREAKDOWN
For purposes of progress measurement the Construction Price is broken down as
follows:
Amount (SR)
3.1 Mobilization/Demobilization (All Areas, maximum 2% of Construction Price)
3.2 Surveying, right of way, Earthwork Excavation and Construction of Temporary
Ponds for Hydrotesting, Purging and cleaning.
3.2.1 Survey and Layout
3.2.2 Construction of R.O.W. which includes:
3.2.2.1 Grading ROW
3.2.2.2 Sandl Fill
3.2.2.3 Marl Stockpile
3.2.2.4 Marl Fill
3.2.2.5 Spreading & Compacting
3.2.2.6 Testing and FDT
3.2.3 Excavation / Trenching which includes:
3.2.3.1 Ordinary Earth
3.2.3.2 Rock Excavation
3.2.4 Sand Bedding
3.2.5 Sand Padding / Backfill
3.2.6 Level / Shape Berm
3.2.7 Stabilization
3.2.8 Temporary Pond Hydro testing
3.8 Civil / Structural Construction & Erection
3.11 Open cut for Road crossings
3.12 Thrust Boring for Road crossings
3.15 All Demolition Work
3.16 Complete field mark-up of As-Built drawings and all exception items (Min. 5% of the
sub-total construction lump-sum price)
Total Construction Price -
COMPENSATION FOR CHANGES
WORK UNIT RATES
ABBREVIATIONS
UR Unit Rate
LM Linear Meter
CM Cubic Meter
SM Square Meter
EA Each
DIA Pipe Outside Diameter (inch)
DIA-LM Pipe Outside Diameter (inch) – Linear Meter
1000
1000 Gallons per Kilometer
GAL/KM
LM/WK Linear Meter per Week
MT Metric Ton
MT/KM Metric Ton per Kilometer
EA ASSY Each Assembly
SMYS Specified Minimum Yield Strength (psi)
WT Wall Thickness
ROW Right of Way

1 CIVIL/STRUCTURAL
1.1 Soil Excavation
Excavation including, but not limited, to shoring, dewatering, hauling and disposal of
unsuitable or unneeded materials at a dump site.
1.1.1 Non-Rock, by hand
1.1.2 Non-Rock, by machine.
1.1.3 Rock, by machine or blasting.
1.2 Backfilling & Compaction

Provide back-filling material from a Saudi Aramco approved source, including cost of
material if any, loading & transporting irrespective of distance from jobsite, handling, placing,
compaction in layers 15 to 30 cm as required regardless of the method used, and testing.

1.2.1 Sand bedding


1.2.2 Marl Fill
1.2.3 Select Marl Fill
1.7 Excavation and removal of existing concrete & asphalt:
Excavation and removal of existing concrete foundations, slabs, asphalt paving or
underground duct banks including transportation to Saudi Aramco approved dump site
within 50 Km of the work site.
1.7.1 Remove by hand: Plain concrete slab
1.7.2 Remove by hand: reinforced concrete slab
1.7.3 Remove by machine: Plain concrete slab
1.7.4 Remove by machine: reinforced concrete slab
1.7.5 Remove by hand 50 mm thick asphalt paving
1.7.6 Remove by hand 100 mm thick asphalt paving
1.7.7 Remove by machine 50 mm thick asphalt paving
1.7.8 Remove by machine 100 mm thick asphalt paving
1.8 Stabilization of Pipeline Berm
This work shall include, but is not limited to, furnishing all materials (except crude oil),
loading, hauling and installation, grading as per SAUDI ARAMCO specifications.
1.8.1 Stabilize with crude oil.
1.8.2 Stabilize with 0.15 meters thick marl
1.12 Scaffolding
Provide, erect and dismantle scaffolding in accordance with Saudi Aramco Construction
Safety Manual
1.12.1 Up to 5 meters high
1.12.2 5.01 meters to 10 meters high
1.13 Camel Crossing
Install Camel Crossings over All Pipe sizes

This work shall include, but is not limited to, complete installation of vehicle or camel
crossings over pipelines in accordance with Standard Drawing AC-36660, Sheet 4. Including
installation as pipe protection, anode installation for casing. Crossing shall be 5m wide with
1m covers over the pipe and capped with 150mm layer of compacted marl.

Note: External FBE coating of the casing pipe is included.


1.14
Underground Pipeline, utilities pipe or electrical/ communication cable crossing.

This work shall include, but is not limited to, complete installation of road crossings including
installation of detour roads, installation of warning signs, excavation, installation of pipe and
protection (FBE coated steel casing or reinforced concrete slab), anode installation, backfill
and compaction, hydrostatic testing and re-paving the road.

Open Cut
1.14.8 4”-6”
1.14.9 8"-10"
1.14.10 12"-16"
1.14.11 18"-20"
1.14.12 20"-24"
1.14.13 26"-30"
1.14.14 32"-48"
2 PIPING
2.2 Underground Piping

Provide & install underground carbon steel piping including, but not limited to survey, ditch
excavation including rock, sand or subkha padding, bending, welding, lowering-in,
backfilling, tie-in where applicable, pre-heating & post weld heating if required, cleaning,
coating, painting and hydro testing. . Different Wall Thickness

Normal Soil
2.2.1 2”
2.2.2 4”
2.2.3 6”
2.2.4 8”
2.2.5 10”
2.2.6 12”
2.2.7 20”
2.2.8 24”
2.2.9 32”
2.2.10 40"
2.2.11 42”
2.2.12 48”
Rock
2.2.13 2”
2.2.14 4”
2.2.15 6”
2.2.16 8”
2.2.17 10”
2.2.18 12”
2.2.19 20”
2.2.20 24”
2.2.21 32”
2.2.22 40"
2.2.23 42”
2.2.24 48”
Subkha
2.2.25 2”
2.2.26 4”
2.2.27 6”
2.2.28 8”
2.2.29 10”
2.2.30 12”
2.2.31 20”
2.2.32 24”
2.2.33 32”
2.2.34 40"
2.2.35 42"
2.2.36 48"

COMPENSATION FOR CHANGES

TIME UNIT RATES

1 LABOR RATES
1.1    Construction Manager
1.2    Construction Superintendent
1.3    General Foreman
1.4    Craft Foreman – Civil
1.8    Sheet Metal Fabricator
1.9    Fabricator Steel
1.12       Certified Structural Welder
1.13       Welder Helper
1.22       Ironworker
1.23       Carpenter
1.26       Rigger
1.28       Mason
1.29       Rebarman
1.30       Scaffolder
1.31       Survey Party Chief
1.32       Material Man
1.33       Labor, Skilled
1.34       Laborer, Non-skilled
1.36       Light Equipment Operator
1.37       Heavy Equipment Operator
1.38       Crane Operator
1.39       QA/QC Inspector
1.40       QA/QC Engineer
1.41       Project Engineer
1.42       Discipline Engineer
1.45       Safety Engineer
1.49       CADD Operator complete with work station *
1.50       Draftsman
1.51       Work Permit Receiver
1.52       Scaffolding Supervisor
1.53       Certified Scaffolder
1.54       Technician
* Rate to include complete CADD Systems inclusive of all required equipment and
consumables.

3 EQUIPMENT RATES
3.1 LIGHT VEHICLE
3.1.1 Pick-Up Truck - ¾ Ton 4 x 2
3.1.2 Carry All – ¾ ton 4 x 2
3.2 LIGHT TRUCKS
3.2.1 Flatbed Truck - 5 Tons
3.2.2 Flatbed Truck - 10 Tons
3.2.3 Flatbed Truck C/W Crane - 3 Tons
3.3 HEAVY DUTY TRUCK
3.3.1 Dump Truck - 5 C.M.
3.3.2 Dump Truck - 15 C.M.
3.3.3 Dump Truck - 20 C.M.
3.3.4 Tractor Unit - 4 x 2
3.3.5 Tractor Unit - 6 x 4
3.4 TANKERS
3.4.1 Water - 22,700 Liters with Pump (6,000 GAL)
3.4.2 Water - 37,800 Liters with Pump (10,000 GAL)
3.4.3 Vacuum - 22,700 Liters (6,000 GAL)
3.5 TRAILERS
3.5.1 Flatbed - 50 Tons with Tractor
3.5.2 Lowboy - 100 Tons with Tractor
3.5.3 Lowboy - 200 Tons with Tractor
3.6 FRONT END LOADERS
3.6.1 Bobcat
3.6.2 Backhoe/Excavator
3.6.3 Cat D8 or Equivalent
3.6.4 Cat D9 or Equivalent
3.6.5 Cat 950 or Equivalent
3.6.6 Cat 966 or Equivalent
3.6.7 Cat 980 or Equivalent
3.6.8 Cat with Rock Drill
3.7 COMPACTORS
3.7.1 Vibratory Plate
3.7.2 Jumping Jack
3.7.3 Trench Roller - Self Propelled - 2 Tons
3.7.4 Vibratory Roller - 10 Tons
3.7.5 Vibratory Roller - 20 Tons
3.9 CRANES
(Including minimum of two (2) sets of rigging for each crane comprising a total of
eight (8) slings and eight (8) shackles per crane, lengths and strengths compatible
with crane capacity and reach)
3.9.1 18 Tons – Grove or Equivalent
3.9.2 35 Tons – Grove or Equivalent
3.9.3 55 Tons –Grove or Equivalent
3.9.4 80 Tons – Grove or Equivalent
3.9.5 140 Tons – Grove or Equivalent
3.9.6 300 Tons – Grove or Equivalent
3.1 COMPRESSORS AND TOOLS
3.10.3 Diesel-750 CFM w/Filter and Oiler ACC w/100 ft hose
3.10.5 Jackhammer - 65 lbs min with breaking tools and 100 ft. length hose including
coupling
3.10.8 Portable Fan Blower/Exhauster, 11,000 CFM and 100 ft. of hose
3.10.9 Additional 100 ft length hose for items 10.3
3.10.10 Additional 100 ft length hose for items 10.5, and 10.8
3.11.7 Wellpoint Dewatering System, 3” header and 6 wellpoints at 10 ft on center x 22 ft
deep, complete with vacuum pump to deliver 5 psi absolute pressure
3.12 WELDING/CUTTING EQUIPMENT
3.12.1 Diesel - 300 AMPS w/200 ft of Leads
3.12.2 Diesel - 400 AMPS w/200 ft of Leads
3.12.3 Tig Welding Set complete with accessories including, but not limited to, gas
3.12.4 Air Arc Cutting Equipment Set
3.12.5 Oxy/Acetylene Cutting Set complete with accessories including, but not limited to,
gauges, gases, bottle rack, cutting torch
3.12.6 Stress Relief, Heat Blankets and Power Supply
3.12.7 Grinder, pedestal – 6 in.
3.12.8 Grinder, pedestal – 12 in.
3.12.9 Grinder, electric – 6 in.
3.13 FLOODLIGHTS/LTG EQUIPMENT
3.13.1 Portable Diesel Light Tower, 5 to 9 kW
3.13.2 Portable Diesel Light Tower, 10 to 25 kW
3.13.3 Portable Diesel Light Tower, 26 to 50 kW
3.14 PILE DRIVING EQUIPMENT
3.14.1 Pile Driving Hammer, Steam or Air, 4150 ft-lb @225 BPM
3.14.2 Pile Driving Hammer, Steam or Air, 15,000 ft-lb @ 60 BPM
3.14.3 Pile Driving Hammer, Steam or Air, 24,450 ft-lb @ 111 BPM
3.14.4 Diesel Type Hammer, 22,400 ft-lb
3.14.5 Diesel Type Hammer, 41,300 ft-lb
3.15 CONCRETE EQUIPMENT
3.15.1 Concrete Pump, Truck Mounted, 4” Line, 80’ Boom
3.15.2 Concrete Mixer, 6 cu ft
3.15.3 Ready Mix Truck
3.15.4 Concrete Vibrator
3.15.5 Concrete Finisher
3.15.6 Curbing Machine
3.17 GENERATOR SETS COMPLETE WITH CONTROL PANEL, TANKS
3.17.1 10 kW
3.17.2 60 kW
3.17.3 100 - 150 kW
3.17.4 400 - 600 kW
3.18 TOOLS/EQUIPMENT MISC.
3.18.1 Rebar Bender
3.18.2 Rebar Shear
3.18.3 Torque Wrenches 8000 PSI with Full Rangee Sockets 3/4" Drive
3.18.4 Impact Wrenches 1/2" Drive with Full range of Sockets (Imperial 1-3/8" to 4-3/4"
Metric 41 mm - 135mm)
3.18.7 Chain Hoist (up to 1-1/2 tons)
3.18.8 Come-A-Long (up to 1-1/2 tons)
 3.18.18 Scaffolding (Bay 6'X6'X6-1/2')
5 The Labor Rates for the design, procurement and support personnel and Software
are:
5.1 DESIGN PERSONNEL
5.1.1 Project Manager
5.1.2 Senior / Lead Engineer
5.1.3 Discipline Engineer
5.1.4 Specialist Engineer
5.1.5 Senior Designer
5.1.6 Designer
5.1.7 Senior Draftsman
5.1.8 Draftsman
5.1.9 CADD Operator w/complete work station*
5.2 PROCUREMENT PERSONNEL
5.2.1 Buyer
5.2.2 QA/QC Engineer
5.2.3 Senior Inspector
5.2.4 Expediter
5.2.5 Traffic Coordinator
5.2.6 Senior Materials Engineer
5.2.7 Materials Engineer
5.2.8 Materials Control/Coordinator
5.2.9 Spare Parts Coordinator
5.3 SUPPORT PERSONNEL
5.3.1 Senior Secretary
5.3.2 Secretary
5.3.3 Document Control Clerk
5.3.4 Clerk
5.3.5 IT Specialist

END OF ATTACHMENT I TO SCHEDULE “C”


PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE :AUM

DISCIPLINE:

PAY ITEM NO. DESCRIPTION OF ITEM UOM Estimated Quantity Unit Rate Total Amount REMARKS

2.2 FOUNDATION
2.2.1 Full Thrust Anchor ( 4-units )

2.2.1.1 Backfill m3 1,294.31 27.15 35,142.37 using excavated


material
2.2.1.2 Concrete m3 549.45 510.39 280,436.46
2.2.1.3 Rebars and others ton 43.96 4,718.12 207,391.21
---- Nothing Follows ----
Sub-Total - - - 522,970
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount REMARKS
Quantity

2.2 BACKFILL
2.2.2 Structural Supports,Platforms,Pipe Supports & others

2.2.2.1 Backfill m3 18,673.11 27.15 507,000.37 using excavated


material
---- Nothing Follows ----
Sub-Total - - - 507,000
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

PAY ITEM NO. DESCRIPTION OF ITEM UOM Estimated Quantity Unit Rate Total Amount

2.2 CONCRETE WORKS


2.2.3 Structural Supports,Platforms,Pipe Supports & others
2.2.3.1 Concrete works m3 3,505.69 510.39 1,789,273.39
---- Nothing Follows ----
Sub-Total - - - 1,789,273
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount
Quantity

2.2.4 CIVIL WORKS

2.2.4.1 Scraper facilities


Fence and Gate
2.2.4.1.1 SD Fence Type 3 671.11 LM. 353.05 236,933.25
2.2.4.1.2 Drive Gate ( 7.3m x 2.45m ) 177.70 EA. 13,400.10 2,381,197.29
2.2.4.1.3 Walkway Gate ( 1.20m x 2.45m ) 5.00 EA. 2,388.78 11,943.89

2.2.4.7 Valve Stations


2.2.4.7.1 SD FenceSEC@ Class 4 2,859.13 LM. 687.58 1,965,886.39
2.2.4.7.2 Drive Gate ( 7.3m x 2.45m ) 39.00 EA. 13,400.10 522,603.80
2.2.4.7.3 Walkway Gate ( 1.20m x 2.45m ) 39.00 EA. 2,388.78 93,162.35

2.2.4.2 Drain Pit


2.2.4.2.1 SD Fence Type 3 97.38 LM. 353.05 34,378.11
2.2.4.2.2 Drive Gate ( 7.3m x 2.45m ) 1.00 EA. 13,400.10 13,400.10
2.2.4.2.3 Walkway Gate ( 1.20m x 2.45m ) 1.00 EA. 2,388.78 2,388.78
---- Nothing Follows ----
Sub-Total 5,261,894
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimate
Unit
PAY ITEM NO. DESCRIPTION OF ITEM UOM d Total Amount
Rate
Quantity

2.2 REINFORCEMENT
2.2.5 Structural Supports,Platforms,Pipe Supports & others
2.2.5.1 Reinforcement works tons 279.91 4718.12 1,320,639.83
---- Nothing Follows ----
Sub-Total - - - 1,320,640
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount
Quantity

2.2 STRUCTURAL WORKS


2.2.6 Structural Supports,Platforms,Pipe Supports & others
2.2.6.1 Structural Steel works tons 109.76 18,486.70 2,029,008.20
---- Nothing Follows ----
Sub-Total - - - 2,029,008
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount
Quantity

3.2 CIVIL WORKS

3.2.1 Survey and Layout 249.75 KM 2,189.63 546,865.80

3.2.2 Construction of R.O.W.


3.2.2.1 Grading ROW 207,766.35 Lm 43.03 8,939,388.51
3.2.2.2 Sandl Fill 344,915.55 M³ 12.51 4,315,635.66
3.2.2.3 Marl Stockpile 421,953.81 M³ 14.60 6,159,475.10
3.2.2.4 Marl Fill 492,272.40 M³ 21.32 10,496,621.86
3.2.2.5 Spreading & Compacting 766,869.36 M³ 15.33 11,754,102.53
3.2.2.6 Testing and FDT 1,406.51 Each 78.20 109,990.63
3.2.3 Pipeline Excavation / Trenching
3.2.3.1 Ordinary Earth 244,707.09 M³ 12.77 3,125,599.92
3.2.3.2 Rock Excavation 117,883.35 M³ 126.30 14,889,046.19
3.2.4 Sand Bedding 50,229.66 M³ 27.37 1,374,802.51
3.2.5 Sand Padding / Backfill 250,454.82 M³ 30.32 7,593,265.66
3.2.6 Level / Shape Berm 640,583.28 M³ 35.80 22,932,020.56
3.2.7 Stabilization 207,726.40 Lm 23.40 4,859,783.40
3.2.8 Temporary Pond 5.00 Each 103,186.15 515,930.75
---- Nothing Follows ----
Sub-Total - - - 97,612,529

NOTE: ROW price does not include Maintenance & Repair of the ROW during the construction period
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount REMARKS
Quantity

3.5 CIVIL WORKS

3.5.1 Scraper Lancher @ABJF MANifold RH 13A


3.5.1.1 demolition of existing structures 1.00 lot no bid
3.5.1.2 Clearing/GradingWorks 12,728.75 CM 5.36 68,284.46

3.5.1.3 Backfill Regular 15,274.50 CM 18.33 279,906.57 using excavated


material
3.5.1.4 Compacted Marl 4,851.90 CM 47.34 229,677.50
3.5.1.5 Concrete Pad 871.00 EA. 45,225.85 39,391,715.17
3.5.1.6 150mm Steel Pipe Guard rails 85.50 LM 991.17 84,745.12
3.5.1.6 Windsock pole 1.00 EA. 1,213.68 1,213.68
-
3.5.2 Drain Pit @ABJF MANifold RH 13A -
3.5.2.1 demolition of existing structures 1.00 lot no bid
3.5.2.2 Excavation/GradingWorks 235.00 CM 12.77 3,001.61

3.5.2.3 Backfill Regular 280.00 CM 18.33 5,131.02 using excavated


material
3.5.2.4 Compacted Marl 35.00 CM 47.34 1,656.82
---- Nothing Follows ----
Sub-Total - 40,065,332
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

PAY ITEM NO. DESCRIPTION OF ITEM Estimated Quantity UOM Unit Rate Total Amount REMARKS

3.6 CIVIL WORKS

3.6 Valve Stations


3.6.1 Clearing/GradingWorks 16,343.75 CM 5.36 87,677.45

using
3.6.2 Backfill Regular 19,612.50 CM 18.33 359,400.87 excavated
material
3.6.3 Compacted Marl 5,883.75 CM 47.34 278,522.90
3.6.4 Guardrail /Crash Barrier 207.00 lm 1,067.60 220,993.06
---- Nothing Follows ----
Sub-Total - - - 946,594
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

PAY ITEM NO. DESCRIPTION OF ITEM Estimated Quantity UOM Unit Rate Total Amount REMARKS

3.7 CIVIL WORKS


Corrosion Inhibitor Skid @ ABJF 12", ABJF 18" , MZLJ -1 ;
3.7.1 16 ' KHTG 1 & 26" KHT-1 ( Upsteam end and Downsteam
of Sat GOSP)
3.7.1.1 Clearing/GradingWorks 135.00 CM 5.36 724.22

3.7.1.2 Backfill Regular 162.00 CM 18.33 2,968.66 using excavated


material
3.7.1.3 Compacted Marl 81.00 CM 47.34 3,834.35
3.7.1.4 Concrete Footing and Pedestal 32.40 m3 1,967.74 63,754.85
3.7.1.5 Structural Support and Platforms 2.25 tons 18,486.70 41,595.08

Biocide Injection Skid @ ABJF 12", ABJF 18" , MZLJ -1 ;


3.7.2
16 ' KHTG 1 & 26" KHT-1
3.7.2.1 Clearing/GradingWorks 162.00 CM 5.36 869.06

3.7.2.2 Backfill Regular 194.40 CM 18.33 3,562.40 using excavated


material
3.7.2.3 Compacted Marl 97.20 CM 47.34 4,601.22
3.7.2.4 Concrete Footing and Pedestal 38.88 m3 1,967.74 76,505.82
3.7.2.5 Structural Support and Platforms 2.70 tons 18,486.70 49,914.10
---- Nothing Follows ----
Sub-Total - - - 248,330
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount REMARKS
Quantity

3.8 Civil/Structural Construction and Eerection

3.8.1 Foundation 549.45 m3


12.772821452 7,018.07 considered as excavation

3.8.2 Backfill 18,673.11 m3


18.325088737 342,186.31 using excavated material
3.8.3 Concrete 3,505.69 m3 510.39151845 1,789,273.39
3.8.4 Reinforcement 279.91 tons 4718.1238426 1,320,639.83
3.8.5 Structural Steel works 109.76 tons 16042.663744 1,760,762.56
---- Nothing Follows ----
Sub-Total - - - 5,219,880
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

Estimated
PAY ITEM NO. DESCRIPTION OF ITEM UOM Unit Rate Total Amount REMARKS
Quantity

3.11 Crossing
3.11.1 Camel Crossing 132.00 Each 53,109.39 7,010,439.69
3.11.2 Marl Road Crossing 109.00 Each 37,163.73 4,050,846.95 open cut only
3.11.3 Pipeline crossing 134.00 Each 47,640.02 6,383,762.32 open cut only
---- Nothing Follows ----
Sub-Total - 17,445,049
PROJECT : Mazalij Pipelines 3000548992 BIDDER :
SUBJECT : SCHEDULE OF QUANTITIES AND PRICES DATE :
OWNER : SAUDI ARAMCO SIGNATURE : AUM
DISCIPLINE:

EST. Unit Total


PAY ITEM NO. DESCRIPTION OF ITEM UOM
QTY Rate Amount

3.15 CIVIL WORKS


3.15.1 Demolition TL 14 receiver @KHCPF
3.15.1.1 Demolition works Piping and related works 1.00 lot no bid
3.15.1.2 Demolition works Civil 1.00 lot no bid
3.15.1.3 Demolition related utilities 1.00 lot no bid

3.15.1 Demolition TL 14 launcher @RH 14


3.15.1.1 Demolition works Piping and related works 1.00 lot no bid
3.15.1.2 Demolition works Civil 1.00 lot no bid
3.15.1.3 Demolition related utilities 1.00 lot no bid

3.15.1 Demolition TL 13 receiver @KHCPF


3.15.1.1 Demolition works Piping and related works 1.00 lot no bid
3.15.1.2 Demolition works Civil 1.00 lot no bid
3.15.1.3 Demolition related utilities 1.00 lot no bid

3.15.1 Demolition TL 13 launcher @ RH 13


3.15.1.1 Demolition works Piping and related works 1.00 lot no bid
3.15.1.2 Demolition works Civil 1.00 lot no bid
3.15.1.3 Demolition related utilities 1.00 lot no bid

3.15.1 Demolished Plants


3.15.1.1 Hauling to prewcribed location by SA 1.00 lot no bid
3.15.1.2 Levelling and rstoration works at demolished site 1,080.00 m3 no bid
---- Nothing Follows ----