Attention: ########
#######
#######
#######
#######
Dear #######,
My team and I would like to commence by thanking you for the opportunity to tender on the proposed works at
##############.
We are pleased to present our proposal for the works and believe we are in a very good position to successfully deliver your
project. We have gained invaluable experience over the past 10 years managing similar projects for large organisations such as
NSW Police, Transport for NSW, Sydney Trains, Sydney Water and various Councils throughout NSW ##(List organisations that
are similar to the client organisation)##
• Demolition:
a. Allowance for Demolition works as per the RFT documents provided.
i. The following items have been excluded from our offer:
• Waste Removal:
a. Allowance to remove, transport and dispose of building and demolition waste associated with the contract works, pre
classified as (GSW) General Solid Waste (non-putrescible)
j. No allowance for the transportation or disposal of the following:
i. Special waste
ii. Liquid waste
iii. Hazardous waste
iv. Restricted solid waste
v. General solid waste (putrescible)
• Excavation:
a. Allowance for Excavation works as per the RFT documents provided.
k. The following items have been excluded from our offer:
l. Excavation through rock, shale or rock like material
m. Modify or divert underground services
n. Additional works associated with soft, waterlogged or unsuitable subgrade
i. Special waste
ii. Liquid waste
iii. Hazardous waste
iv. Restricted solid waste
• Electrical Services:
a. Allowance for Electrical works as per the RFT documents provided.
o. The following items have been excluded from our offer:
p. Upgrade of switchboards, existing circuits, incoming power supply, wiring etc
q. It is assumed that all incoming power infrastructure, mains supply, transformers, switchboards and circuits have
sufficient capacity to meet proposed new electrical loads and phase requirements and are fit for purpose
Project Programme
We confirm our ability to meet the specified programme as detailed in the RFT documents.
a. Works are expected to take ## weeks
r. Project duration is based from ##site possession or from contract award##
s. Programme is subject to the following:
i. Continuous site access
ii. Favourable weather conditions: inclement weather has not been considered in the programme
iii. Favourable site conditions: latent site conditions have not been considered in the programme
iv. No allowance for staging of works other than detailed in the attached programme
Construction Methodology
Construction methodology is to be read in conjunction with the attached gantt chart programme (if provided)
1. Site Establishment:
a. Erect fencing and site signage
b. Establish site amenities (delete if using client amenities)
c.
10. #Add detailed description of key phases of works#
11. #Add detailed description of key phases of works#
12. #Add detailed description of key phases of works#
13. #Add detailed description of key phases of works#
14. Handover:
a. Inspect completed works with Client
b. Thoroughly photograph completed works
c. Issue keys, warranties and O&M manuals
• Environmental Management:
• Site specific Environmental management plan and Environmental Aspects and Impacts Register
• Stockpile and recycle recyclable materials
• Emergency response Spill kit kept on site
• Designated storage area for chemicals
• Quality Management:
• Project specific Quality Management Plan
• Inspection Test Plans for key trades or as per contractual conditions
• Site audits and quality management inspections to proactively prevent and manage defects
• Assumptions:
a. Client will provide all designs, drawings, specifications
b. Clients project concept / design is compliant to all current Australian Standards , BCA, NCC, DDA, Council requirements
and is fit for purpose
c. Client will provide and seek all necessary Council, Authority, Stakeholder and Utility approvals
t. The Site has sufficient capacity to meet future load requirements (ie Hydraulic, Fire, Electrical, Mechanical,
Telecommunications etc)
Insurances
• Contract Works & Public Liability: Policy No: CTA110124838
/conversion/tmp/activity_task_scratch/553994189.docx Uncontrolled When Printed Template Rev: F Page 6 of 7
Status: Approved Last Updated 24/1/2018
Van Mal Group Construction Pty Ltd.
PO Box 925, Surry Hills 2010, Sydney, NSW
1300 723 767 www.vanmalgroup.com.au
Commercial Terms
• Commercial Works: 20% deposit, Invoices / progress claims issued fortnightly, 14 calendar day payment terms
• Residential Works: 10% Deposit, Invoices / progress claims issued fortnightly, 7 calendar day payment terms
• Ownership of works and materials does not pass until full payment has been received
• Interest charged at 12% on overdue accounts plus administration and recovery fees
• Residential works will be covered by a statutory warranty for 6 years for major defects and 2 years for all other
defects, commencing from the date when the work are completed or in use by the client.
Thank you for the opportunity to participate in this tender. If you have any questions, please don’t hesitate to get in contact with
me directly.
Regards,
Name
Position
Mobile number
Email address