YES, NO, N/A NOTES OTHER
STEP from RELEVANT
No Dropdown) TENDER STAGE HOW IT'S DONE, WHAT TO CONSIDER WHO IS RESPONSIBLE RELEVANT DATES PROCESSES
1 Find new work Request for Tender Estimator
2 Tender Evaluation Complete Tender Evaluation and Key Details Form Estimator
6 Set up Estimating Spreadsheet Headings must be as per tender schedule document Estimator
7 Save Emails related to tender Save in 1. Client Documents _Current documents Estimator
8 Save any Documents related to tender Save in 1. Client Documents _Current documents Estimator
9 Set up Key Dates in Outlook Calendar Site Visit Meeting Estimator 1/1/2001
1 week Reminder to call contractors (Set for one week before tender due) Estimator 4/27/2020
48 Hour Review - 48 hours before tender due - include supervisor Estimator 5/2/2020
Bill of Quantities
13 Check for addendums Save to 1. Client Tender Documents – RFIs and Addendums Estimator
14 Drawing & Contract Review Review Drawings & Tender Documents Estimator
15 List areas of risk or concern Estimator to meet with supervisor to determine best course of action
17 List Trades Complete the Tender Disciplines and Action List (HERE - 'Tender Disciplines and Action'!A1)
18 Sub Contractor Packages Use the completed Complete the Tender Disciplines and Action List (HERE - 'Tender Disciplines and Action'!A1) Purchasing
22 Prepare and Update Sub-contractor pricing list Use Tender Stage Contact & Status List
23 Check for addendums Save to 1. Client Tender Documents – RFIs and Addendums
Email Sub-contractors
26 Confirm Sub-Contractors are Pricing At least 1 week out from Tender (there should be a reminder) 4/27/2020
Costing
Sub-Contractor Pricing
COMPLETE
(Select
YES, NO, N/A NOTES OTHER
STEP from RELEVANT
No Dropdown) TENDER STAGE HOW IT'S DONE, WHAT TO CONSIDER WHO IS RESPONSIBLE RELEVANT DATES PROCESSES
28 Sub-Contractor quote analysis Use Tender Stage Contact & Status List
Compare quotes
29 Check for addendums Save to 1. Client Tender Documents – RFIs and Addendums
34 Write Tender Letter & Construction Methodology Template in 8. VMG Tender Submission
Include - Programme
Archive
42 End
To be added
£ Set up template tender email and save in tender folder 5.Subcontractors & Suppliers
Project Info
Project Description
Submission Method
Conflicts of Interest
Contract Info
Other info:
Value of Security: Nothing = 1, Retention = 2, 2.5% Bank Guarantees = 4, 5% or greater Bank Guarantees = 5
Special
circumstances to
Risk Rating 0
reconsider rating
Proceed with tender Y/N
er
nd
Te
Re hen
qu
th
First Focus / Urgent Trades Submission Info Enter Y for Yes
W
Wi
1 Documents required for submission
2 Construction Program
6 Insurances
9 Referees
Other
Other
Other
high risk
N
r
ted
es
Re hen
qu
W
Unit of
Trade / Description of Works Notes Subcontractor Quantity
Measure
1
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
10
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
12
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
13
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
14
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
15
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
16
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
17
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
18
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
19
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
20
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
21
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
22
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
23
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
24
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
25
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
26
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
27
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
28
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
29
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
30
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
31
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
32
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
33
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
34
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
35
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
36
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
38
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
39
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
40
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
41
0.0
0.0
0.0
0.0
0.0
VMG labour required for the works:
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Subbies
Total VMG
Combined T
Combined Trade
otal VMG Labour: $0.00 $1.00
Total:
Rate (ex Line item Total (ex Sub Totals
Trade Total (ex GST)
GST) GST) (ex GST)
Subbies & Suppliers
$1.00 $1.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $1.00
$0.00 $0.00
$0.00 $0.00
$1.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subbies & Suppliers
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
VMG Labour
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total Subbies & Suppliers: $1.00
Total VMG Labour: $0.00
Combined Trade Total: $1.00
Note: Modify only the numbers in BLUE TOTAL PRELIMS $4,274.20
Unit of Rate (ex Line item Total (ex
Trade / Description of Works Notes Instructions Quantity Trade Total (ex GST)
Measure GST) GST)
Workers Compensation Insurance (Required for ALL Projects)
Approximate wages from Project Personel Claculation Workers Comp Premium is 4.5% of Total Wages Refer to Project Personel Calculation Below $ 1,360.00 item 4.50% $61.20
$286.20
Refer to Cost Breakdown for estimated VMG worker
Approx wages from Cost Breakdown Workers Comp Premium is 4.5% of Total Wages
wages $ 5,000.00 item 4.50% $225.00
Asbestos Removal Insurance (only required for projects that involve ASBESTOS works)
Enter the approximate value of the Asbestos Works
Approximate Value of Asbestos Removal Works Asbestos Insurance works Premium is 2% of Total Contract Value $ - item 2.00% $0.00
component of the project -------- > $0.00
Professional Indemnity Insurance (Only Required for Projects that require DESING works)
Professional Indemnity Insurance Premium is 5% of Total Contract Enter the approximate value of the design fees or Design
Approximate Value of Design Works and Consultant Works $ - item 5.00% $0.00
Value component of the project -------- > $0.00
Home Building Compensation (Used to be called Home Warranty Insurance). This is only needed for RESIDENTIAL building work valued at over $20,000
https://www.icare.nsw.gov.au/builders-and-homeowners/certificates-of-hbcf-insurance/premium-calculator/#gref
Get an accurate estimate from this $1.00
Get estimated amount from Website---> 1.0 item $ 1.00 $1.00
website. DO NOT ESTIMATE
0.35 % levy on building and construction work costing $25,000 and $195.00
Approximate Contract Value
above (inclusive of GST) in New South Wales
Insert Estimated Total Contract value including GST-> $ 50,000.00 item 0.35% $195.00
GUARANTEE 1
Insert Estimated Total Confirm the % amount of security needed for
Contract value includign each guarantee (typically 2.5% or 5% for Syd
GST -- v Trains)
Guarantee 1: Approximate Value / Funds Required Guarantees are typically 2.5% of total contract value CBA or NAB $ 50,000.00 item 5.0% $150.00
Guarantee 1: Establishment fee One off Bank Fee to establish Guarantee 1.0 item $410.00 $410.00
Guarantee 1: Service fee 1st Year Minimum $160 per annum (if guarantee is under $10,000 or 1.6% of
guarantee amount) $ 150.00 item 1.6% $2.40
Guarantee 1: Service 2nd Year Minimum $160 per annum (if guarantee is under $10,000 or 1.6% of
guarantee amount) $ 150.00 item 1.6% $2.40 $1,132.00
GUARANTEE 2
Guarantee 2: Approximate Value / Funds Required Guarantees are typically 2.5% of total contract value $ 50,000.00 item 5.0% $150.00
Guarantee 2: Establishment fee One off Bank Fee to establish Guarantee 1.0 item $410.00 $410.00
Guarantee 2: Service fee 1st Year Minimum $160 per annum (if guarantee is under $10,000 or 1.6% of $ 150.00 item 1.6% $2.40
guarantee$160
amount)
Guarantee 2: Service 2nd Year Minimum per annum (if guarantee is under $10,000 or 1.6% of $ 150.00 item 1.6% $2.40
guarantee$160
amount)
Guarantee 2: Service 3rd Year Minimum per annum (if guarantee is under $10,000 or 1.6% of $ 150.00 item 1.6% $2.40
guarantee amount)
Project Personnel
Use the allocation % below as a guide only: Actual Allocation
Project Manager 40% allocation to project 20% 16.0 hr $85.00 $1,360.00
Construction Manager 5% allocation to project 0% 0.0 hr $75.00 $0.00
Contracts Administrator 40% allocation to project 0% 0.0 hr $50.00 $0.00
Cadet 40% allocation to project 0% 0.0 hr $35.00 $0.00
Office Administration 5% allocation to project 0% 0.0 hr $35.00 $0.00
VMG Site Support (labourer) 1 60% allocation to project 0% 0.0 hr $40.00 $0.00
VMG Site Support (labourer) 2 pending project requirements 0% 0.0 hr $40.00 $0.00
Hours per full time worker 80 <--Total number of hours needed for 1 worker full time for the entire project duration
Hours per full time worker (inc Saturday) 96
Specialist Supervision
Trains Projects. Rates are for Sydney Metro area.
Protection Officer - Normal Time Standard Rate apply to weekdays, 5 days x 8 hours x 1 week Programmed 0.0 hr $52.80 $0.00
Protection Officer - Electrical Certificate 3 possessions x 2 days Programmed 0.0 day $13.07 $0.00
Protection Officer - Phone allowance Each day worked Programmed 0.0 day $6.55 $0.00
Protection Officer - Disability allowance Each hour worked Programmed 0.0 hr $0.48 $0.00
Next row is only required if you have plant on rails tracks and rates are for Sydney
Hygienist Contact subby for best and current rates 0.0 hr $120.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
Water Authority
Property Sewerage Services Diagram Sydney Water Rate: $12 0.0 $0.00 $0.00
Sewer Location diagram Sydney Water Rate: $35 0.0 $0.00 $0.00
Sewer Junction Connection fees Sydney Water Rate: $180 0.0 $0.00 $0.00
Water Service Connection - up to 25mm Sydney Water Rate: $45 0.0 $0.00 $0.00
Building Plan Approval 0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
Travel and Accommodation
Air Fares (return trips). 0.0 item $0.00 $0.00
Taxi (per trip) 0.0 item $0.00 $0.00
Car Hire (per day) 0.0 item $180.00 $0.00
Excess km's or Travel allowance 0.0 km $0.40 $0.00
Fuel (per tank) 0.0 item $100.00 $0.00
Portaloo (per week with fortnightly pump $56 + GST per week with fortnightly pump out Coats Hire (2015/02/17) 0 week $60.00 $0.00
out)
Portaloo delivery - Sydney Metro Area $75.00 + GST delivery each way to metro area Coats Hire (2015/02/17) 0 item $75.00 $0.00
Only
Next two rows are for Trains Projects and rates are for Sydney
Float of Hi Rail Manitou One Hi Rail Only during all the possessions Hi Range Cranes 0 item $450.00 $0.00 rate correct at 2018.07.03
Hi Rail Manitou One Hi Rail Only during all the possessions Hi Range Cranes 0 hr $350.00 $0.00 rate correct at 2018.07.04
Scaffolding Installation Best to get quote from a company 1 item $0.00 $0.00
Scaffolding Hire Best to get quote from a company 0 m2 $0.00 $0.00
Scaffolding Removal Best to get quote from a company 0 item $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
VMG labour required for the works: (Note: allow for supervision in Preliminaries section - not here) VMG Labour
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
Hoarding and Fencing Subbies & Suppliers
Gantry 1 $5.00 $5.00
Overhead Protection 0 $0.00 $0.00
0 $0.00 $0.00
Permanent Chainwire Fence Galv security fence 2.1m h - $39 per meter Rawlinsons 0 $0.00 $0.00
0 $0.00 $0.00
$5.00
Temporary Fencing hire $1.82 per meter per week Coats 0 lm $1.82 $0.00
Fence Delivery $200 delivery fee each way. Coats 0 item $200.00 $0.00
Labour to erect ot remove fence $75 per man per hour. Coats 0 hr $75.00 $0.00
0 $0.00 $0.00 $5.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
VMG labour required for the works: (Note: allow for supervision in Preliminaries section - not here) VMG Labour
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
Environmental Management Subbies & Suppliers
Silt Fence 860mmh x 50m roll 0 $0.00 $0.00
Geotextile Membrane - 1m Wide x 10m 0 $0.00 $0.00
Hay bales 0 $0.00 $0.00
Silt Sausage / Sediamnt bag 1m long x
250mm diameter 0
$0.00 $0.00
Star Pickets 1.6m high 0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
$0.00
0 $0.00 $0.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
VMG labour required for the works: (Note: allow for supervision in Preliminaries section - not here) VMG Labour
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
Other Subbies & Suppliers
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
$0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
VMG labour required for the works: (Note: allow for supervision in Preliminaries section - not here) VMG Labour
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
<<<<<< Unhide here for additional rows 0 $0.00 $0.00
0 $0.00 $0.00
Total Subbies & Suppliers: $8.00
Total VMG Labour: $0.00
Combined Trade Total: $8.00
Combined Trade
Civil and Tipping Calculator Total Subbies & Suppliers: $0.00 Total VMG Labour: $0.00
Total:
$0.00
$0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
7 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
8 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
9 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
10 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
12 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
$0.00
$0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
30 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
31 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
32 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
33 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
34 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
35 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
36 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
38 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
39 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
40 Subbies & Suppliers
0.0 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00 $0.00
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
VMG labour required for the works: VMG Labour
0.0 $0.00 $0.00
0.0 $0.00 $0.00
$0.00
$0.00
Structural Engineering.
Architectural.
Geotechnical Engineer.
Design Delapidation Report.
and
Council Fees, deposits, DA fees etc, hoarding fees, construction zones.
Planning
BCA Consultant
Access Consultant.
Principal Certifying Authority
Site Establishment.
Site Shed / Container / Office / Stationary / Tables and Chairs.
Establish
ment. Hoarding and Painting.
Waste chute
Site protection.
Access Equipment.
Fixed or mobile scaffold.
Scissor lift, cherry picker etc.
Temporary Fencing, signage and banners.
Traffic Control
Stripout / Demolition.
Labour
Skip bins
Excavation.
Dial before you dig
Underground Services Search
Inspect for HAZMAT
Waste Clasification
Excavation greater than 1.5m? (allow for benching or shoring)
Vibration monotoring
Excavation through rock or rock like material
DewateringSediment Control
Import new material
Compaction in layers
Geotech testing of each layer
Spoil Disposal
Waste Clasification
Strip all top soil (cant be used under slabs or structure)
Tipping Rates - VENM
Tipping Rates - ENM
Tipping Rates - General Solid Waste
Tipping Rates - Restricted Waste
Transport rates
Loading of material (excavator)
Hazmat Remediation.
Air Monitoring.
Lead confirmation testing.
Soil Testing for Lead (before and after works).
Soil testing for Asbestos (before and after works).
Hygenist travel and accomodation.
Electrical Services.
Electrician Labour.
Travel and Accomodation.
Temporary Power & Lighting.
Lighting Supply (Internal, External, Bathroom, Pool, floord lights, mailbox)
GPOs, Switch Gear, Wiring.
Power Supply: (AC, Solar, Water Pump, Oven, Pool Pump)
Switch board enclosure.
Switch Board (Suffieint space for new circuits?)
RCD (New or Existing require an upgrade?)
Upgrade mains supply / Is it overloaded?
Electrial Utility Connections / Fees / Lead times.
External Pits and conduits.
Exit signage.
Emergency Lighting.
Ducted skirtings.
Workstation jumper sockets.
Data Services.
Telstra phone connection / Fees / Lead times / Availability in street?
External pits and conduits.
Data Points (single, double, triple, shuttered, workstation wiring etc)
Phone Points.
Data Cabling (Cat 5, Cat 6, Cat 6a)
Cabinets / Patch panels.
TV aeriel and TV points.
Building Ducted skirting.
Services
Mechanical Services.
Plant supply.
Ducting
Fire rated collars / ducts.
Hydraulic Services.
Fire Services.
Sprinklers.
Relocation of hydrants?
Fire Hose Reels.
Smoke detection.
FIP
EWIS
Monitoring and Phone line.
Concreting:
Formwork
Concrete Supply
Placement and finishing
Pumping
Reinforcement
Concrete Testing
Concrete Trest frequency (each load, check specification?)
Structural Steel.
Hot dipped galvanising.
Lintels
Bolts
On site welding
Carpentry.
Timber frames and trusses (FSC accreditation required? Check the specifications)
External cladding
Eaves and fascias
Re leveling of existing structure (floors etc)
Lay new flooring (FC, particle board, timber)
Install new roof battens
Install new ceiling battens
Install windows
Install architraves, skirtings, trims
Hang doors
Install hardware
Decking
Pergolas
Fit off fixtures and fittings
Consumables, fixings, nails, adhesives
Masonry / Brickwork
Brick or Block supply
Walls
Piers
Patching existing openings b. Detailed excavation
Consumable supply (mortar, ties)
Access (Brickies tressels, HD steel scaffold)
Block reinforcement
Core filling
Acid Cleaning g. Security
Tuck Pointing
Mortar matching
j. Wall cladding
Windows
Window supply m.Plasterboard
Window installation n. Flooring
Accessand lifting o. Doors Hardware
Glazing and glass type (Check BASIX spec for glass type)
Frosting, Tinting or films
Trims, mouldings
Opening restricters
Skylights
Timber pre primed?
Timber painted?
Powedercoating suitable for environment? Close to ocean? Check the specification
Waterproofing:
Specification or brand (check the specification)
Wet areas
Roofs
Balconies
Basement
Flood testing
List All Trades
Joinery:
Kitchen cupboards / benches etc.
Bathroom vanity.
Laundry cupboards / benches etc.
Linen cupboards.
Bedroom Wardrobes.
Utility benches.
Run power into joinery? (door switches or strip lighting)
Roofing:
Tiles
Colourbond (Standard or Colourbond ultra? Check the specification and check the proximity to the ocean)
Glavanic corrosion a problem? (check surrounding metal types)
Lighting Supply:
Internal
External
Wet areas
Garages
Within joinery (ie strip lighting)
Location of switches
Dimmers required?
Does existing wiring need to be re run to suit lights or switching configuration?
Are external fittings corrosion resistant and suitable for local environment?
Painting:
Existing Point contail Lead? Will it need to be tested?
Amount of preparation required
Coverage of paint specification or colour
Safe Access (Scaffold, platform ladders)
Tiling:
Allow for 15% waste or more (depends on tile size)
Allow for additional tiles for client, can be 10% (check contract)
Tile Supply
Tile Delivery (can be expensive)
Tile Laying Allowances
Standard or Epoxy grout
Aluminium or plastic trims (corners, reveals etc)
Laying pattern and tile setout
New bedding required?
Set to fall? New falls required?
Additional Floor wastes may be needed to be compliant and for falls to work?
Skirting tiles (coved etc)
Nosing tiles (stairs, balconies, urinals etc)
Surface sealing
Final clean
Site Works:
Paths, driveways and associated finishes.
Fences, gates.
Washing line.
Shade sails.
Landscaping, trees, plants, turf, woodchip.
Garden beds, edging.
Signage
Waste Removal.
Final Clean.
Vinyl
Tiling
ce
d
d
d
eq
an
ive
ire
ire
Re ope
Re ote
Re ote
tus
tR
ow
qu
qu
ce
o
Qu
Qu
Sc
Sta
Wh
No
All
Item Other Details Notes
GENERAL
Aboriginal Participation
Hazmat - Hygienist
Hazmat - Asbestos
Hazmat - Heavy Metals
Rock
Other
Consolidation
Council
Stormwater/Hydraulic
Statutory - Workers Comp
Statutory - Professional Indemnity
Statutory - Public Liability
DESIGN
BCA
Construction certificate
Occupation Certificate
Access Consultant
Fire Consultant
Civil/Structural Engineer
Design Certificate
Construction Sign Off
Hydraulic Engineer
Design Certificate
Construction Sign Off
Mechanical Engineer
Design Certificate
Construction Sign Off
Landscape Architects
SERVICES
Gas
Power
Power
NBN
NBN
Telstra
Water
Water
Water
Water
Sewer
Sewer
Sewer
Waste
Arborist
Traffic Control
Fire Contractor
DIRECT COST CONTRACTS
Survey
Geotechnical
Demolition
ce
d
d
d
eq
an
ive
ire
ire
Re ope
Re ote
Re ote
tus
tR
ow
qu
qu
ce
o
Qu
Qu
Sc
Sta
Wh
No
All
Item Other Details Notes
Tree and green waste
Topsoil
Spoil/Rock
Earthworks
Excavation
Spoil Storage and disposal
Backfilling
Testing and Compaction
Concrete
Formwork
Reinforcing
Concrete
Concrete Supply
Waterproofing
Termite Protection
Electrical
All approvals and connections where required
Electrical
Communications
Security
Hydraulic
All approvals and connections where required
Potable water
Rainwater (Collection and distribution)
Sewer
Structural Steel
Stud Walls and Linings
Stud Walls
Insulation
Linings
Specialty Linings - BRONZE
Suspended Ceiling
Insulation
Doors(Timber/Steel)
Door Frames
Doors
Fire Doors
Fire Door Certification - Fire Door Provider, Hardware
selection. Sometimes we need to get Fire Gun Store door
Consultant to
approve.
Windows & Doors (Glazed)
Window Frames and Glazing
Door Frames and Glazing
Bricklaying
Bricks
Blocks
Joinery
Cabinetry
Wardrobes
Mirrors and other glazing
Carpentry
Walling
Cladding
Roof Frames
ce
d
d
d
eq
an
ive
ire
ire
Re ope
Re ote
Re ote
tus
tR
ow
qu
qu
ce
o
Qu
Qu
Sc
Sta
Wh
No
All
Item Other Details Notes
Doors
Fixtures and fittings
Render
Cementitious Finishes
Metalwork & Non structural Steel
Structural Steel on top of Roof
Structural Steel in Doorway
Balustrades
Fencing
Handrails
Fixtures and Fittings
Painting
Roof Trusses
Roofing and Gutering
Roof Sheeting
All barges and flashing
All Gutters
Plant Hire
Flooring
Carpets
Tiling
Timber Flooring
Scaffolding
All access and scaffolding requirements
Letterboxes and Clotheslines
Tactiles and access
Stair Nosings
Tactiles
Linemarking
LockSmith
Cleaning
Site Security
Signs and Wayfinding
RISKS
Design and Construct
Rock/Geotechnical
Asbestos in exisitng building
HAZMAT in ground
Setout and cast in of services into Concrete Walls
Concrete Finishes - Consistency
Waterproofing - Top slab expansion/contraction.
Site Management
Travel to and from Sydney
ce
d
d
d
eq
an
ive
ire
ire
Re ope
Re ote
Re ote
tus
tR
ow
qu
qu
ce
o
Qu
Qu
Sc
Sta
Wh
No
All
Item Other Details Notes
Review of Contract
OTHER
PROGRAMME:
After hours works?
Staging of works?
ELECTRICAL:
Upgrade of incoming power supply?
New Circuits Required?
Is the existing switchboard large enough for additional circuits?
Do the existing circuit breakers need to be upgraded to RCD type?
Do new areas require exit signage, emergency lighting, smoke detection?
DATA:
Note the large cost and performance difference between Cat 6 and Cat 6a.
HAZARDOUS MATERIALS:
Has hazmat report been provided?
Has an allowance been made for removal of lead and asbestos?
Has an allowance been made to encapsulate or remove lead paint?
Allowance for air monitoring, soil testing before and after for both lead and asbestos.
Allow for Hygienist travel and accommodation.
EXCAVATION:
Allowance to excavate through rock?
Allowance to re use ans stockpile excavated material on site?
Allowance to remove excavated material from site??
Allowance for work with material other than VENIM?
Allowance to work with or test for contaminated material?
Confirm / Specify thickness of concrete to be removed.
CONCRETE CUTTING:
Confirm / Specify thickness and length allowed for including cross cuts.
PAINTING:
Confirm if existing paint properly adheres to the paint below it. Maybe an oil based primer is required?