You are on page 1of 26

TAX INVOICE

Invoice No:-33 GSTIN 29ADCFS6127R1ZB


Date :17-09-2019 PAN ADCFS6127R
State : KARNATAKA Code 29 Work Order No: 12

Details of Receiver (Billed to) Details of Consignee


Name: KNK CONSTRUCTION PVT LTD Name: SHREE VENKATESHWARA INFRASTRUCTURES
Address : Address:
KNK CONSTRUCTION PVT LTD, #428/7, Ground Floor,
NO.359,7th Cross, K Madavan park, 'A' Sector Yelahanka New Town
opp to indian oil petrol Bunk, Banglore-560064
jayanagar 1st Block , Bengaluru-560011

GSTIN: 29AACCK8057G1Z9 GSTIN: 29ADCFS6127R1ZB


State: KARNATAKA Code 29 State: KARNATAKA Code 29
RA BILL-3
CGST SGST
s.no Service Description Amount TOTAL
Rate Amount Rate Amount
1 Construction of office Building (BOQ as per 848,313 9% 76,348 9% 76,348 1,001,009
Annexture-1

TOTAL 848,313 76,348 76,348 1,001,009


Total Invoice Amount in Words : Total Amount before Tax 848,313
Add : CGST 76,348
Add : SGST 76,348
Ten Lakhs one thousand Nine Rupees only Total Tax Amount 152,696
Total Amount after Tax : 1,001,009.00
GST on Reverse Charge NA
Certified that the particulars given above are true and correct
Terms and Conditions : Certified that the For SHREE VENKATESHWARA INFRASTRUCTURES
Particulars given above are true and correct
and the amount indicate
Authorised signatory
Project : FANUC INDIA PVT LTD-ANNEXTURE-1
RABILL-03
Contractor: Shree Venkateshwara Infrastructures w/o no:12
Si No Description UOM BOQ QTY Rate Amount
1.0 Reinforced Cement Concrete: -

Note: Unless otherwise specified, the following will apply for all items of Plain and
reinforced cement concrete. Rate quoted shall be inclusive of the following but will
exclude cost of reinforcement and inserts like bolts, plates, sleeves, and pipes etc.,
Minimum grade of concrete to be used for any structure member shall be M-20 as per
code IS-456. Mix design shall be as per guidelines in IS: 10262 – 1982 reaffirmed in
2009 subject to minimum cement content as per IS 456-2000.
a) All form of work moulds, centering and shuttering. Shuttering material shall be steel, -
timber or plywood as directed.
b) Adequate protection to edges and corners for damage during construction.
c) Work straight, curved, plain or tapered.
d) Keeping the work well watered for at least 14 days after casting.
e) Roughening concrete to surface where required after removal of centering or
shuttering to receive plaster.

f) Work on all floors at all levels.


g) Building and placing in position any insert suplied.
h) Weigh batching and machine mixing Consolidation using: vibrators of Approved type.
i) Course sand shall be used for all Concrete work
-
j) Course aggregate shall be of Hard broken Granite, basalt or Trap of size specified
k) The contractors are particularly advised to study relevant drawings before quoting
l) A qualified mechanic shall be available during concreting for maintenance of mixers
and vibrators.
Providing and laying cement concrete conforming to specified grade (IS 456-1976) with
20mm and down size graded aggregate of granite as per specifications,excluding to
cost of reinforcement, and including compacting with vibrators, curing etc., hacking the
exposed surface to receive plaster wherever necessary etc.,complete as per drawings
and specifications for the following items of work :
-
Note : M.sand can be used for all grade of concrete.
The maximum allowed replacement of OPC in concrete by fly ash shall be
restricted to 20% or
The maximum allowed replacement of OPC in concrete by Ground
granulated blast furnace slag shall be restricted to 30%.

2 Item same as 2.0, RMC shall be supplied by client -


i In Plinth beam-M30 -
a Concrete basic cost (Includes loading, transportation and excludes GST) Cum 15.00 -
Labour charges includes unloading, pumping, shifting, all tools & takels and labour
b Cum 15.00 1,805.00 27,075.00
charges till completion with curing works.
- -
ii or Self compaction concrete for column M40 grade - -
a Concrete basic cost (Includes loading, transportation and excludes GST) Cum 400.00 -
Labour charges includes unloading, pumping, shifting, all tools & takels and labour
b Cum 400.00 2,200.00 880,000.00
charges till completion with curing works.
- -
iii In Beams-M30 - -
a Concrete basic cost (Includes loading, transportation and excludes GST) Cum 283.68
Labour charges includes unloading, pumping, shifting, all tools & takels and labour
b Cum 283.68 1,805.00 512,035.18
charges till completion with curing works.
- -
iv In Slabs-M30 - -
a Concrete basic cost (Includes loading, transportation and excludes GST) Cum 649.28 -
Labour charges includes unloading, pumping, shifting, all tools & takels and labour
b Cum 649.28 1,805.00 1,171,950.40
charges till completion with curing works.
- -
v In Stair case-M30 - -
a Concrete basic cost (Includes loading, transportation and excludes GST) Cum 5.00 -
Labour charges includes unloading, pumping, shifting, all tools & takels and labour
b Cum 5.00 1,805.00 9,025.00
charges till completion with curing works.
- -
vi In OHT-M30 - -
a Concrete basic cost (Includes loading, transportation and excludes GST & Cum
27.40 -
Waterproofing compound)
b Labour charges includes waterproof chemical, unloading, pumping, shifting, all tools & Cum
27.40 3,439.00 94,213.30
takels and labour charges till completion with curing works.
- -
4.0 Form Work: - -
a. Scheme of Formwork including casting slabs to gentle slope, special staging for
casting floors of different heights, roof projections at various levels and profiled
formwork.
b. Contractors shall submit drawings showing the scheme of formwork including back
proping and proper sequence of removal of formwork and back propping so that the
structural slab will not be overloaded due to construction loads.
c. Formwork shall be designed for close jointed rigid, durable and shall have adequate
strength, water tightness and ensure easy removal etc.,
d.Props, shorings and bracings shall be all in steel or Aluminium.
e. Formwork designed with proposed materials
( to be approved prior to making) shall be able to retain its shape,line,dimension,level
within the allowable limits of variations.
f. Formwork shall facilitate for making holes / recess for leaving
dowells embedments etc.at no additional cost and shall be submitted for approval.
g. Necessary arrangement shall be envisaged to provide camber in beams or slabs as - -
per design.
h. Formwork shall have adequate openings for cleaning.
i. Providing, fabricating and erecting form work,
special staging for casting floors of different heights, roof projections at various levels
and profiled formwork as per drawing at all levels and places wherever needed/
specified as per drawing including striking with 12mm Plastic coated, marine
resistant waterproof ply with adjustable steel props of acceptable Staging system and
with sufficient bracing as approved by consultant.
Cost to include designing of proper form work and staging system to suit the
requirements,Submission of design calculations and shop drawings for approval,sealing
the joints with heavy duty brown self adhesive tape, aligning to line and levels
including M.S.Ties, PVC Spacer, Providing openings/ cutouts/ pockets, applying
deshuttering chemical, Deshuttering as approved by the consultant etc., complete at all
levels, double/tripple heights and profiles for Note : Only plan area shall be
considered.No extra shall be paid for Side shuttering of Drop panel/column capitals.
j. Formwork for construction joints
shall be submitted for approval, sealing the joints with heavy duty brown self adhesive - -
tape, applying mould releasing agents( Rebol from Fosroc or equivalent),
aligning to line and levels including M.S Ties, PVC spacer, Providing openings/cut outs/
pockets , All slabs shall be progressively deshuttered and backpropped as per
instructions by structural engineer, complete at all levels , double/tripple height
and profiles.
Only plan area shall be considered for payment. Sides of drop panels/
column capitals shall not be considered for payment. Shuttering below the shrinkage
strip at every level shall be retained in place without disturbing for a time as specified by
the structural engineer, Contractors shall submit drawings showing the scheme of
formwork including back proping and proper sequence of removal of formwork and back
propping so that the structural slab will not be overloaded due to construction
loads. Any honey coombs not affecting structural stability shall be smootly finished with - -
CM 1:4. Any undulations, bulging etc shall be chipped and finished by the
contractor without any extra cost. Any leakage of slurry, concrete etc should not be
payed exrta.

Providing, fabricating and erecting form work at all levels and places wherever needed /
specified as per drawing including 12mm thk shuttering plywood suitably framed with
silver oak sections and supported by adjustable steel props of acceptable Staging
system and with sufficient bracing as approved by consultant. Cost to include designing
of proper form work and staging system to suit the requirements, sealing the joints with
heavy duty brown self adhesive tape,aligning to line and levels including M.S. Ties,PVC - -
Spacer, Providing openings/ cutouts/ pockets,Deshuttering as approved by the
consultant etc., complete at all levels.

i.b In Plinth beam Sqm 60.00 257.00 15,420.00


iv In Column - -
a 5.0 height (COLUMN) Sqm 800.00 248.00 198,400.00
- -
v In Beams - -
a 5.0 height (beam) Sqm 2,511.00 248.00 622,728.00
- -
vi In Slabs - -
a 5.0 height (slab) Sqm 2,500.00 239.00 597,500.00
- -
vii In Stair case Sqm 50.00 374.00 18,700.00
xiii In OHT Sqm 185.00 374.00 69,190.00
3.0 Reinforcement Steel: - -
Note :- Preparing Bar Bending schedule, obtaining consultant's approval, supplying,
fabricating,delivering at site, hoisting and fixing in position and making all steel work in - -
accordance with the design drawings prepared by the consultants.

Providing and fixing reinforcement for RCC work with TMT or equivalent HYSD bar of M.T.
various diameters and grade of steel and percentage elongation, minimum 14.5% as
per IS:1786 including decoiling, straightening, cutting, bending,and placing in position at
all levels according to drawings and binding the reinforcement with 18 gauge galvanised
annealed binding wire of double fold and providing precast cement concrete cover
blocks for placing the reinforcements in position and for maintaining the cover specified
as per drawing or according to relevant IS codes.
Note:Unless noted otherwise the measurements in accordance with IS 1200. However
reinforcement shall be measured only in lengths of bars as actually placed in position on
standard weight basis, no allowance being made in the weight for rolling margin and
wastage. splices ,Chairs of any shape & profile, Spacer bar of any shape & profile, -
cover block, wastage, binding wire and proper protection of reinforcement shall not be
measured and shall be included in the quoted rates. Quoted rate shall be deemed to
have considered the above stipulation. Quoted rate to include lead, lift, placing at all
levels and as directed. Authorised laps only payable.
Grade of reinforced steel - Fe 500 -TMT bars (Basic Rate-50000/Tonne)

4.a Steel basic cost (Includes loading, transportation and excludes GST) M.T. 60.00 -
4.a Labour charges includes unloading, shifting, cutting, bending & Fabrication, all tools & M.T.
takels and labour charges till completion with respects. 60.00 8,645.00 518,700.00
EXTURE-1

Actual Quantity Amount


BOQ Amount
Previous Present Cumulative Previous Present Cumulative
- - - -
4.93 4.93 27,075.00 8,898.65 - 8,898.65

` - - - -
- - - - -
- - - -
29.25 22.60 51.85 880,000.00 64,350.00 49,711.83 114,061.83

- - - -
- - - - -
- - - -
60.65 64.04 124.69 512,035.18 109,473.25 115,590.00 225,063.25

- - - - -
- - - - -
- - - -
133.75 88.38 222.13 1,171,950.40 241,418.75 159,529.77 400,948.52

- - - - -
- - - - -
- - - - -
- 9,025.00 - - -

- - - - -
- - - - -
- - - - -

- 94,213.30 - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -

42.84 42.84 15,420.00 11,009.88 - 11,009.88


- - - - -
276.44 219.80 496.24 198,400.00 68,557.12 54,509.22 123,066.34
- - - - -
- - - - -
509.18 419.61 928.79 622,728.00 126,276.64 104,062.61 230,339.25
- - - - -
- - - - -
739.25 463.01 1,202.26 597,500.00 176,680.75 110,660.04 287,340.79
- - - - -
- 18,700.00 - - -
- 69,190.00 - - -
- - - - -
- - - - -

- - - - -

- - - - -
21.26 29.41 50.67 518,700.00 183,792.70 254,249.45 438,042.15

848,312.91

Toatal 848,312.91
Location - canteen building & office buiding Name of sheet: Quantity calculation

S.no Description uom No L B H Total (m)


Reinforced Cement Concrete:
In Floor beam(M30
1 1B28A(600X750) 5 to 4-F cum 1 1 13.300 0.600 0.750 5.985
cum -3 1 0.600 0.400 0.750 -0.540
2 1B28(600X750) 5 to 4-E cum 1 1 13.300 0.600 0.750 5.985
cum -3 1 0.600 0.400 0.750 -0.540
3 1B28(600X750) 5 to 4-D cum 1 1 13.300 0.600 0.750 5.985
cum -3 1 0.600 0.400 0.750 -0.540
4 1B28(600X750) 5 to 4-C cum 1 1 13.300 0.600 0.750 5.985
cum -3 1 0.600 0.400 0.750 -0.540
5 1B26( 230X 600) cum 1 1 1.650 0.230 0.600 0.228
6 1B26(230X750) cum 1 1 8.299 0.230 0.750 1.432
7 1B48(200X750) cum 1 1 5.300 0.200 0.750 0.795
8 1B47(200X750) cum 1 1 5.780 0.200 0.750 0.867
9 1B21(230X750) cum 1 1 10.640 0.230 0.750 1.835
10 1B3A(230 X 750) cum 1 1 4.300 0.230 0.750 0.742
11 1B3A(200 X 750) cum 1 1 5.400 0.200 0.750 0.810
12 1B3(200 X 1.1) cum 1 1 18.800 0.200 1.100 4.136
13 1B8(300 X750) cum 1 1 21.640 0.300 0.750 4.869
14 1B8(300 X750) cum 1 1 21.640 0.300 0.750 4.869
15 1B10(230 X750) cum 1 1 28.300 0.230 0.750 4.882
16 1b2(200 x750) cum 1 1 4.390 0.200 0.750 0.659
17 1b2a(200 x 750) cum 1 1 6.570 0.200 0.750 0.986
18 1B1(200 x 750) cum 1 1 6.410 0.230 0.750 1.106
19 1b2b cum 1 1 2.570 0.200 0.750 0.386
1b2b cum 1 1 0.780 0.200 0.750 0.117
20 1B42 230X750 cum 1 2 1.460 0.230 0.750 0.504
cum 1 2 0.770 0.150 0.750 0.173
21 corader cum 1 1 27.720 0.200 0.750 4.158

Total 55.331
slab(M30)
1 F-G(5 to 4) cum 1 1 3.750 4.600 0.225 3.881
F-G(5 to 4) cum 1 1 3.500 4.600 0.225 3.623
F-G(5 to 4) cum 1 1 3.820 4.600 0.225 3.954
F-G(5 to 4) cum 1 1 1.000 4.600 0.225 1.035
2 E-F(5-4) cum 1 1 3.750 5.400 0.225 4.556
E-F(5-4) cum 1 1 3.500 5.400 0.225 4.253
E-F(5-4) cum 1 1 3.750 5.400 0.225 4.556
E-F(5-4) cum 1 1 1.000 5.400 0.225 1.215
3 D-E(5-4) cum 1 1 3.750 3.400 0.225 2.869
D-E(5-4) cum 1 1 3.500 3.400 0.225 2.678
D-E(5-4) cum 1 1 3.750 3.400 0.225 2.869
D-E(5-4) cum 1 1 1.000 3.400 0.225 0.765
4 C-D(5-4) cum 1 1 3.750 5.400 0.225 4.556
C-D(5-4) cum 1 1 3.500 5.400 0.225 4.253
C-D(5-4) cum 1 1 3.750 5.400 0.225 4.556
C-D(5-4) cum 1 1 1.000 5.400 0.225 1.215
5 B'-C(5-4) cum 1 1 3.750 2.840 0.225 2.396
B'-C(5-4) cum 1 1 3.500 2.840 0.225 2.237
B'-C(5-4) cum 1 1 3.750 2.840 0.225 2.396
B'-C(5-4) cum 1 1 1.000 2.840 0.225 0.639
6 B'-B(5-4) cum 1 1 1.650 2.330 0.225 0.865
B'-B(5-4) cum 1 1 2.499 2.330 0.225 1.310
B'-B(5-4) cum 1 1 1.270 2.300 0.225 0.657
B'-B(5-4) cum 1 1 1.000 2.330 0.225 0.524
7 A-A'(5-4) cum 1 1 1.480 2.100 0.225 0.699
A-A'(5-4) cum 1 1 1.270 2.100 0.225 0.600
A-A'(5-4) cum 1 1 1.370 2.100 0.225 0.647
8 A-A'(5-4) cum 1 1 2.570 3.170 0.150 1.222
A-A'(5-4) cum 1 1 4.300 1.000 0.225 0.968
9 corrider(A-G) cum 1 1 27.720 0.800 0.150 3.326
9 landing cum 1 1 2.730 5.250 0.225 3.225
Total 72.544
M40 column
1 G-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
2 G-C16-4(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
3 F-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
4 F-C16-4(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
5 E-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
6 E-C16-4(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
7 D-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
8 D-C16-4(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
9 C-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
10 C-C16-4(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
11 B'-C21-5'(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
12 B'-C9A-4'(canteen building)-FF cum 1 1 0.230 0.750 0.870 0.150
13 B'-C15-4'(canteen building)-FF cum 1 1 0.600 0.400 0.870 0.209
14 B-C21-4'(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
15 B-C15A-4(canteen building)-FF cum 1 1 0.400 0.600 0.870 0.209
16 A-C21-4(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
17 A-C15A-4(canteen building)-FF cum 1 1 0.400 0.600 0.870 0.209
18 B-C21-5'(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
19 B-C21-4(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
20 A'-C21-5'(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
21 A'-C21-4(canteen building)-FF cum 1 1 0.230 0.600 0.870 0.120
22 B-c16-4(canteen building)-FF cum 1 1 0.400 0.600 3.770 0.905
23 G-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
24 F-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
25 E-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
26 D-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
27 C-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
28 B-C15-5(canteen building)-FF cum 1 1 0.400 0.600 1.350 0.324
29 B'-C17-1'(office buiding)-FF cum 1 1 0.230 0.450 0.900 0.093
30 C-17-D-1''(office buiding)-FF cum 1 1 0.230 0.450 3.900 0.404
31 C-17-C'-1''(office building)-FF cum 1 1 0.230 0.450 0.900 0.093
32 B'-C17-1''(officce building)-FF cum 1 1 0.230 0.450 0.900 0.093
33 c-c22-2'(office building)-FF cum 1 1 0.230 0.750 0.900 0.155
34 B'-c24-2c''(office building)-FF cum 1 1 0.230 0.600 0.900 0.124
35 B'--C24-2(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
36 A'--C22-2(office building)-FF cum 1 1 0.230 0.750 3.900 0.673
37 D-c24-2'(office buiding)-FF cum 1 1 0.230 0.600 3.900 0.538
38 C-c24-2'(office Building)-FF cum 1 1 0.230 0.600 3.900 0.538
39 A-c24-2'(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
40 D-c24-2''(office buiding)-FF cum 1 1 0.230 0.600 3.900 0.538
41 C-c24-2''(office Building)-FF cum 1 1 0.230 0.600 3.900 0.538
42 A-c24-2''(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
43 B'-c24-2''(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
44 D-c24-3(office buiding)-FF cum 1 1 0.230 0.600 3.900 0.538
45 C-c24-3(office Building)-FF cum 1 1 0.230 0.750 3.900 0.673
46 A-c24-3(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
47 B'-c24-3(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
48 B-c24-3(office building)-FF cum 1 1 0.230 0.600 3.900 0.538
49 A-c23-1"(office building)-FF cum 1 1 0.158 1.000 5.340 0.844
50 A-c23-1"(office building)-FF cum 1 1 0.158 1.000 5.340 0.844
51 C-15 H-4''(canteen building)-GF cum 1 1 0.600 0.400 2.800 0.672
52 C-16 H-4(canteen building)-GF cum 1 1 0.600 0.400 2.800 0.672
53 C-15 J-4''(canteen building)-GF cum 1 1 0.600 0.400 2.800 0.672
54 C-16 J-4(canteen building)-GF cum 1 1 0.600 0.400 2.800 0.672
55 C-21 J''-4(canteen building)-GF cum 1 1 0.230 0.600 2.800 0.386
56 C-21 J''-4''(canteen building)-GF cum 1 1 0.230 0.600 2.800 0.386
57 C-21 k''-4(canteen building)-GF cum 1 1 0.230 0.600 2.800 0.386
58 C-21 k''-4''(canteen building)-GF cum 1 1 0.230 0.600 2.800 0.386
59 C-19-L(canteen building)-GF cum 1 0 0.230 0.750 2.800 0.000
60 C-15A(canteen building)-GF cum 1 1 0.600 0.400 2.800 0.672
Total 21.913
Formwork
1 G-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
2 G-C16-4(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
3 F-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
4 F-C16-4(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
5 E-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
6 E-C16-4(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
7 D-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
8 D-C16-4(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
9 C-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
10 C-C16-4(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
11 B'-C21-5'(canteen building)-FF sqm 1 1 1.660 1.000 0.870 1.444
12 B'-C9A-4'(canteen building)-FF sqm 1 1 1.960 1.000 0.870 1.705
13 B'-C15-4'(canteen building)-FF sqm 1 1 2.000 1.000 0.870 1.740
14 B-C21-4'(canteen building)-FF sqm 1 1 0.230 1.000 0.870 0.200
15 B-C15A-4(canteen building)-FF sqm 1 1 0.400 1.000 0.870 0.348
16 A-C21-4(canteen building)-FF sqm 1 1 0.230 1.000 0.870 0.200
17 A-C15A-4(canteen building)-FF sqm 1 1 0.400 1.000 0.870 0.348
18 B-C21-5'(canteen building)-FF sqm 1 1 1.660 1.000 0.870 1.444
19 B-C21-4(canteen building)-FF sqm 1 1 1.660 1.000 0.870 1.444
20 A'-C21-5'(canteen building)-FF sqm 1 1 1.660 1.000 0.870 1.444
21 A'-C21-4(canteen building)-FF sqm 1 1 1.660 1.000 0.870 1.444
22 B-c16-4(canteen building)-FF sqm 1 1 2.000 1.000 3.770 7.540
23 G-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
24 F-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
25 E-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
26 D-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
27 C-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
28 B-C15-5(canteen building)-FF sqm 1 1 2.000 1.000 1.350 2.700
29 B'-C17-1'(office buiding)-FF sqm 1 1 1.360 1.000 0.900 1.224
30 C-17-D-1''(office buiding)-FF sqm 1 1 1.360 1.000 3.900 5.304
31 C-17-C'-1''(office building)-FF sqm 1 1 1.360 1.000 0.900 1.224
32 B'-C17-1''(officce building)-FF sqm 1 1 1.360 1.000 0.900 1.224
33 c-c22-2'(office building)-FF sqm 1 1 1.960 1.000 0.900 1.764
34 B'-c24-2c''(office building)-FF sqm 1 1 1.660 1.000 0.900 1.494
35 B'--C24-2(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
36 A'--C22-2(office building)-FF sqm 1 1 1.960 1.000 3.900 7.644
37 D-c24-2'(office buiding)-FF sqm 1 1 1.660 1.000 3.900 6.474
38 C-c24-2'(office Building)-FF sqm 1 1 1.660 1.000 3.900 6.474
39 A-c24-2'(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
40 D-c24-2''(office buiding)-FF sqm 1 1 1.660 1.000 3.900 6.474
41 C-c24-2''(office Building)-FF sqm 1 1 1.660 1.000 3.900 6.474
42 A-c24-2''(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
43 B'-c24-2''(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
44 D-c24-3(office buiding)-FF sqm 1 1 1.660 1.000 3.900 6.474
45 C-c24-3(office Building)-FF sqm 1 1 1.960 1.000 3.900 7.644
46 A-c24-3(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
47 B'-c24-3(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
48 B-c24-3(office building)-FF sqm 1 1 1.660 1.000 3.900 6.474
49 A-c23-1"(office building)-FF sqm 1 1 1.413 1.000 5.340 7.545
50 A-c23-1"(office building)-FF sqm 1 1 1.413 1.000 5.340 7.545
51 C-15 H-4''(canteen building)-GF sqm 1 1 2.000 1.000 2.800 5.600
52 C-16 H-4(canteen building)-GF sqm 1 1 2.000 1.000 2.800 5.600
53 C-15 J-4''(canteen building)-GF sqm 1 1 2.000 1.000 2.800 5.600
54 C-16 J-4(canteen building)-GF sqm 1 1 2.000 1.000 2.800 5.600
55 C-21 J''-4(canteen building)-GF sqm 1 1 1.660 1.000 2.800 4.648
56 C-21 J''-4''(canteen building)-GF sqm 1 1 1.660 1.000 2.800 4.648
57 C-21 k''-4(canteen building)-GF sqm 1 1 1.660 1.000 2.800 4.648
58 C-21 k''-4''(canteen building)-GF sqm 1 1 1.660 1.000 2.800 4.648
59 C-19-L(canteen building)-GF sqm 1 0 1.660 1.000 2.800 0.000
60 C-15A(canteen building)-GF sqm 1 1 2.000 1.000 2.800 5.600
Total 219.795
slab(M30)
1 F-G(5 to 4) sqm 1 1 3.750 4.600 1.000 17.250
F-G(5 to 4) sqm 1 1 3.500 4.600 1.000 16.100
F-G(5 to 4) sqm 1 1 3.750 4.600 1.000 17.250
F-G(5 to 4) sqm 1 1 1.000 4.600 1.000 4.600
2 E-F(5-4) sqm 1 1 3.750 5.400 1.000 20.250
E-F(5-4) sqm 1 1 3.500 5.400 1.000 18.900
E-F(5-4) sqm 1 1 3.750 5.400 1.000 20.250
E-F(5-4) sqm 1 1 1.000 5.400 1.000 5.400
3 D-E(5-4) sqm 1 1 3.750 3.400 1.000 12.750
D-E(5-4) sqm 1 1 3.500 3.400 1.000 11.900
D-E(5-4) sqm 1 1 3.750 3.400 1.000 12.750
D-E(5-4) sqm 1 1 1.000 3.400 1.000 3.400
4 C-D(5-4) sqm 1 1 3.750 5.400 1.000 20.250
C-D(5-4) sqm 1 1 3.500 5.400 1.000 18.900
C-D(5-4) sqm 1 1 3.750 5.400 1.000 20.250
C-D(5-4) sqm 1 1 1.000 5.400 1.000 5.400
5 B'-C(5-4) sqm 1 1 3.750 2.840 1.000 10.650
B'-C(5-4) sqm 1 1 3.500 2.840 1.000 9.940
B'-C(5-4) sqm 1 1 3.750 2.840 1.000 10.650
B'-C(5-4) sqm 1 1 1.000 2.840 1.000 2.840
6 B'-B(5-4) sqm 1 1 1.680 2.330 1.000 3.914
B'-B(5-4) sqm 1 1 1.770 2.330 1.000 4.124
B'-B(5-4) sqm 1 1 1.270 2.330 1.000 2.959
B'-B(5-4) sqm 1 1 1.000 2.330 1.000 2.330
7 A-A'(5-4) sqm 1 1 1.480 2.100 1.000 3.108
A-A'(5-4) sqm 1 1 1.270 2.100 1.000 2.667
A-A'(5-4) sqm 1 1 1.370 2.100 1.000 2.877
8 A-A'(5-4) sqm 1 1 2.570 3.170 1.000 8.147
A-A'(5-4) sqm 1 1 4.300 1.000 1.000 4.300
9 corrider(A-G) sqm 1 1 27.720 0.800 1.000 22.176
9 landing sqm 1 1 2.730 5.250 0.225 3.225
Total 319.507
Reinforced Cement Concrete:
In Floor beam(M30
1 1B28A(600X750) 5 to 4-F sqm 1 2 13.300 1.000 0.525 13.965
1B28A(600X750) 5 to 4-F(bottom) sqm 1 1 13.300 1.000 0.600 7.980
column(Dection) sqm -3 1 2.000 1.000 0.750 -4.500
2 1B28(600X750) 5 to 4-E sqm 1 2 13.300 1.000 0.525 13.965
1B28A(600X750) 5 to 4-F(bottom) sqm 1 1 13.300 1.000 0.600 7.980
column(Dection) sqm -3 1 2.000 1.000 0.750 -4.500
3 1B28(600X750) 5 to 4-D sqm 1 2 13.300 1.000 0.525 13.965
1B28(600X750) 5 to 4-D(bottom) sqm 1 1 13.300 1.000 0.600 7.980
column(Dection) sqm -3 1 2.000 1.000 0.750 -4.500
4 1B28(600X750) 5 to 4-C sqm 1 2 13.300 1.000 0.525 13.965
1B28(600X750) 5 to 4-C(bottom) sqm 1 1 13.300 1.000 0.600 7.980
sqm -3 1 2.000 1.000 0.750 -4.500
5 1B26(230X600) sqm 1 2 1.650 1.000 0.375 1.238
bottom sqm 1 1 1.650 1.000 0.230 0.380
6 1B26(230X750) sqm 1 2 8.299 1.000 0.525 8.714
bottom sqm 1 1 8.299 1.000 0.230 1.909
7 1B48(200X750) sqm 1 2 5.300 1.000 0.525 5.565
bottom sqm 1 1 5.300 1.000 0.200 1.060
8 1B47(200X750) sqm 1 2 5.780 1.000 0.525 6.069
bottom sqm 1 1 5.780 1.000 0.200 1.156
9 1B21(230X750) sqm 1 2 7.470 1.000 0.750 11.205
bottom sqm 1 1 7.470 1.000 0.230 1.718
10 1B21(230X750) sqm 1 1 3.170 1.000 0.750 2.378
side(sunken) sqm 1 1 3.170 1.000 0.375 1.189
bottom sqm 1 1 3.170 1.000 0.230 0.729
11 1B3A(230 X 750) sqm 1 1 2.200 1.000 0.225 0.495
1B3A(230 X 750)side sqm 1 1 2.200 1.000 0.525 1.155
bottom sqm 1 1 2.200 1.000 0.230 0.506
1B3A(200 X 750) sqm 1 1 2.100 1.000 0.525 1.103
1B3A(200 X 750)inner side sqm 1 1 1.900 1.000 0.525 0.998
bottom sqm 1 1 2.100 1.000 0.200 0.420
12 1B3(200 X 1.1) sqm 1 2 18.800 1.000 0.875 32.900
1B3A(200 X 1.1)bottom sqm 1 1 18.800 1.000 0.200 3.760
12 1B8(300 X750) sqm 1 2 21.640 1.000 0.525 22.722
1B8(300 X750)bottom sqm 1 1 21.640 1.000 0.300 6.492
13 1B8(300 X750) sqm 1 2 21.640 1.000 0.525 22.722
1B8(300 X750)bottom sqm 1 1 21.640 1.000 0.300 6.492
14 1B10(230 X750) sqm 1 1 28.300 1.000 0.525 14.858
1B10(230 X750)side sqm 1 1 28.300 1.000 0.600 16.980
1B10(230 X750)bottom sqm 1 1 28.300 1.000 0.230 6.509
15 1b2(200 x750) sqm 1 1 2.090 1.000 0.525 1.097
1b2(200 x750) sqm 1 1 2.090 1.000 0.750 1.568
1b2(200 x750)bottom sqm 1 1 2.090 1.000 0.200 0.418
1b2(200 x750) sqm 1 2 2.315 1.000 0.525 2.431
1b2(200 x750)bottom sqm 1 1 2.315 1.000 0.200 0.463
16 1b2a(200 x 750) sqm 1 2 4.270 1.000 0.750 6.405
1b2a(200 x 750)(bottom) sqm 1 1 4.270 1.000 0.200 0.854
1b2a(200 x 750) sqm 1 2 2.300 1.000 0.525 2.415
1b2a(200 x 750)(bottom) sqm 1 1 2.300 1.000 0.200 0.460
17 1B1(200 x 750) sqm 1 2 4.100 1.000 0.750 6.150
1B1(200 x 750)(bottom) sqm 1 1 4.100 1.000 0.230 0.943
1B1(200 x 750) sqm 1 2 2.253 1.000 0.525 2.366
1B1(200 x 750)(bottom) sqm 1 1 2.253 1.000 0.230 0.518
18 1b2b(200 x750) sqm 1 1 2.570 1.000 0.750 1.928
1b2b(200 x750)inner sqm 1 1 2.570 1.000 0.375 0.964
1b2b(200 x750)bottom sqm 1 1 2.570 1.000 0.200 0.514
19 1b2b(200 x750) sqm 1 2 0.780 1.000 0.750 1.170
1b2b(200 x750)bottom sqm 1 1 0.780 1.000 0.200 0.156
19 1B42 230X750 sqm 1 4 1.540 0.230 0.750 1.063
sqm 1 4 1.000 0.150 0.750 0.450
20 corder sqm 1 1 27.720 1.000 0.200 5.544
21 corder sqm 1 1 27.720 1.000 0.750 20.790
corder sqm 1 1 27.720 1.000 0.600 16.632
Total 326.496
Office building security block
In Floor beam(M30
1 1B10A(230 x600) cum 1 1 13.500 0.230 0.600 1.863
colum cum 1 -4 0.230 0.230 0.600 -0.127
2 1B10(230 x 600) cum 1 1 5.000 0.230 0.600 0.690
colum cum 1 -2 0.230 0.230 0.600 -0.063
3 1B18A(230 x 600) cum 1 1 2.170 0.230 0.600 0.299
4 1bA(230 x 600) cum 1 1 11.492 0.230 0.600 1.586
column cum 1 -2 0.230 0.450 0.600 -0.124
5 1B9(230 x600) cum 1 1 4.100 0.230 0.600 0.566
colum cum 1 -1 0.230 0.450 0.600 -0.062
cum 1 1 3.970 0.230 0.600 0.548
6 1B15(230 x600) cum 1 1 5.800 0.230 0.600 0.800
7 1B22(230 X600) cum 1 1 5.813 0.230 0.600 0.802
8 1B18(230 x 600) cum 1 1 3.900 0.230 0.600 0.538
9 1B18(230 x 600) cum 1 1 3.900 0.230 0.600 0.538
10 1B22(230 X600) cum. 1 1 6.182 0.230 0.600 0.853
Total 8.707
Slab (M30)
1 Grid no( A-B) cum 1 1 4.320 4.770 0.150 3.091
2 Grid no( b-c) cum 1 1 15.200 1.000 0.150 2.280
3 Grid no( b-c) cum 1 1 26.000 1.000 0.150 3.900
4 Grid no( C-c') cum 1 1 16.458 1.000 0.150 2.469
5 Grid no( C-D) cum 1 1 10.000 1.000 0.150 1.500
6 Grid no( C-D) cum 1 1 3.820 1.000 0.150 0.573
7 corider cum 1 1 13.500 1.000 0.150 2.025
` Total 15.838
column(M40)
1 column cum 1 11 0.230 0.450 0.600 0.683
Total
form work
1 1B10A(230 x600) sqm 1 1 13.500 1.000 0.600 8.100
1B10A(230 x600) sqm 1 1 13.500 1.000 0.450 6.075
1B10A(230 x600) bottom sqm 1 1 13.500 1.000 0.230 3.105
colum sqm 1 -4 0.920 1.000 0.600 -2.208
2 1B10(230 x 600) sqm 1 2 5.000 1.000 0.450 4.500
1B10(230 x 600) sqm 1 1 5.000 1.000 0.230 1.150
colum sqm 1 -3 0.920 1.000 0.600 -1.656
3 1B18A(230 x 600) sqm 1 2 2.170 1.000 0.450 1.953
1B18A(230 x 600) sqm 1 1 2.170 1.000 0.230 0.499
colum sqm 1 -2 1.360 1.000 0.600 -1.632
4 1bA(230 x 600) sqm 1 1 11.492 1.000 0.600 6.895
sqm 1 1 11.492 1.000 0.450 5.171
1bA(230 x 600)bottom sqm 1 1 11.190 1.000 0.230 2.574
column sqm 1 -2 1.360 1.000 0.600 -1.632
5 1B9(230 x600) sqm 1 2 4.164 1.000 0.450 3.748
1B8(230 x600) sqm 1 1 4.164 1.000 0.230 0.958
colum sqm 1 -1 1.360 1.000 0.600 -0.816
sqm 1 2 3.970 1.000 0.450 3.573
bottom sqm 1 1 3.970 1.000 0.230 0.913
6 1B15(230 x600) sqm 1 1 5.800 1.000 0.450 2.610
1B15(230 x600) sqm 1 1 5.800 1.000 0.600 3.480
1B15(230 x600)bottom sqm 1 1 5.800 1.000 0.230 1.334
7 1B22(230 X600) sqm 1 1 5.813 1.000 0.600 3.488
1B22(230 X600) sqm 1 1 5.813 1.000 0.450 2.616
1B22(230 X600)bottom sqm 1 1 5.813 1.000 0.230 1.337
8 1B18(230 x 600) sqm 1 2 3.900 1.000 0.450 3.510
1B18(230 x 600)bottom sqm 1 1 3.900 1.000 0.230 0.897
9 1B18(230 x 600) sqm 1 2 3.900 1.000 0.450 3.510
1B18(230 x 600)bottom sqm 1 1 3.900 1.000 0.230 0.897
10 1B22(230 X600) sqm 1 1 6.182 1.000 0.600 3.709
1B22(230 X600) sqm 1 1 6.182 1.000 0.450 2.782
1B22(230 X600)bottom sqm 1 1 6.182 1.000 0.230 1.422
11 corrider(A-D sqm 1 2 13.500 1.000 0.450 12.150
corrider(A-D sqm 1 1 13.500 1.000 0.600 8.100
total 93.111
Slab (M30)
1 Grid no( A-B) sqm 1 1 4.320 4.770 1.000 20.606
2 Grid no( b-c) sqm 1 1 15.200 3.500 1.000 53.200
3 Grid no( C-c') sqm 1 1 25.973 1.000 1.000 25.973
4 Grid no( C-D) sqm 1 1 16.458 1.000 1.000 16.458
5 Grid no( C-D) sqm 1 1 9.948 1.000 1.000 9.948
6 Grid no( A-B) sqm 1 1 3.820 1.000 1.000 3.820
7 corider sqm 1 1 13.500 1.000 1.000 13.500
total 143.505
Security Building Grid no(A to x-y)
form work
1 1B10A(230 x600) sqm 1 1 13.500 1.000 0.600 8.100
1B10A(230 x600) sqm 1 1 13.500 1.000 0.450 6.075
1B10A(230 x600) bottom sqm 1 1 13.500 1.000 0.230 3.105
colum sqm 1 -4 0.920 1.000 0.600 -2.208
2 1B10(230 x 600) sqm 1 2 5.000 1.000 0.450 4.500
1B10(230 x 600) sqm 1 1 5.000 1.000 0.230 1.150
colum sqm 1 -3 0.920 1.000 0.600 -1.656
3 1B18A(230 x 600) sqm 1 2 2.170 1.000 0.450 1.953
1B18A(230 x 600) sqm 1 1 2.170 1.000 0.230 0.499
colum sqm 1 -2 1.360 1.000 0.600 -1.632
4 1bA(230 x 600) sqm 1 1 11.492 1.000 0.600 6.895
sqm 1 1 11.492 1.000 0.450 5.171
1bA(230 x 600)bottom sqm 1 1 11.190 1.000 0.230 2.574
column sqm 1 -2 1.360 1.000 0.600 -1.632
5 1B9(230 x600) sqm 1 2 4.164 1.000 0.450 3.748
1B8(230 x600) sqm 1 1 4.164 1.000 0.230 0.958
colum sqm 1 -1 1.360 1.000 0.600 -0.816
sqm 1 2 3.970 1.000 0.450 3.573
bottom sqm 1 1 3.970 1.000 0.230 0.913
6 1B15(230 x600) sqm 1 1 5.800 1.000 0.450 2.610
1B15(230 x600) sqm 1 1 5.800 1.000 0.600 3.480
1B15(230 x600)bottom sqm 1 1 5.800 1.000 0.230 1.334
7 1B22(230 X600) sqm 1 1 5.813 1.000 0.600 3.488
1B22(230 X600) sqm 1 1 5.813 1.000 0.450 2.616
1B22(230 X600)bottom sqm 1 1 5.813 1.000 0.230 1.337
8 1B18(230 x 600) sqm 1 2 3.900 1.000 0.450 3.510
1B18(230 x 600)bottom sqm 1 1 3.900 1.000 0.230 0.897
9 1B18(230 x 600) sqm 1 2 3.900 1.000 0.450 3.510
1B18(230 x 600)bottom sqm 1 1 3.900 1.000 0.230 0.897
10 1B22(230 X600) sqm 1 1 6.182 1.000 0.600 3.709
1B22(230 X600) sqm 1 1 6.182 1.000 0.450 2.782
1B22(230 X600)bottom sqm 1 1 6.182 1.000 0.230 1.422
11 corrider(A-D sqm 1 2 13.500 1.000 0.450 12.150
corrider(A-D sqm 1 1 13.500 1.000 0.600 8.100
total 93.111
office building (Grid no A to D & Y to 1"
1 1B7(300 x450)side sqm 1 2 6.025 1.000 0.150 1.808
Bottom sqm 1 1 6.025 1.000 0.300 1.808
column deduction sqm -1 2 1.660 1.000 0.600 -1.992
2 1B7(300 x600)side sqm 1 1 6.025 1.000 0.450 2.711
inner sqm 1 1 6.025 1.000 0.600 3.615
Bottom sqm 1 1 6.025 1.000 0.300 1.808
column deduction sqm -1 1 1.360 1.000 0.600 -0.816
3 1B7(300 x600)side sqm 1 1 6.025 1.000 0.600 3.615
inner sqm 1 1 6.025 1.000 0.600 3.615
Bottom sqm 1 1 6.025 1.000 0.300 1.808
column deduction sqm -1 1 1.360 1.000 0.600 -0.816
4 1B23(230 x600)side sqm 1 1 10.050 1.000 0.600 6.030
inner sqm 1 1 10.050 1.000 0.450 4.523
Bottom sqm 1 1 10.050 1.000 0.230 2.312
5 1B8(230 x600) sqm 1 1 6.025 1.000 0.300 1.808
inner sqm 1 1 6.025 1.000 0.600 3.615
Bottom sqm 1 1 6.025 1.000 0.230 1.386
column deduction sqm -1 1 1.360 1.000 0.600 -0.816
6 1B20(600 x750)side sqm 1 1 10.050 1.000 0.600 6.030
outer sqm 1 1 10.050 1.000 0.450 4.523
Bottom sqm 1 1 10.050 1.000 0.750 7.538
7 1B7(300 x600)side sqm 1 1 2.660 1.000 0.450 1.197
inner sqm 1 1 2.660 1.000 0.600 1.596
Bottom sqm 1 1 2.660 1.000 0.300 0.798
column deduction sqm -1 1 1.360 1.000 0.600 -0.816
8 1B7(300 x600)side sqm 1 1 2.660 1.000 0.600 1.596
inner sqm 1 1 2.660 1.000 0.600 1.596
Bottom sqm 1 1 2.660 1.000 0.300 0.798
total 60.874