SUBSTRUCTURE
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
470
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 122.02
per cent of cost of
materials and labour
(a+b)
c) Overheads @ 20% on 512.50
(a+b)
d) Contractor’s profit @ 307.50
10% on (a+b+c)
Rate per cum = a+b+c+d 3,382.51
Say Rs. 3,382.50
Labour Rate 389.44
Morter 1:3 28.56
Scaffolding @ 5% 20.90
Overheads @ 20% 87.78
Contractor’s profit @ 52.67
10%
Rate per cum 579.35
Say Rs. 579.35
III. In 1:5 cement mortar
Unit = cum
a) Material
Bricks 1st class Nos. 500.00 3.00 1,500.00
Cement mortar cum 0.24 2,776.69 666.40
b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 127.79
per cent of cost of
materials and labour
(a+b)
c) Overheads @ 20% on 536.73
(a+b)
d) Contractor’s profit @ 322.04
10% on (a+b+c)
471
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
a) Material
Cement t 0.31 4,832.57 1,498.10
Sand cum 1.05 1,025.04 1,076.29
b) Labour
Mate day 0.04 198.33 7.93
Mazdoor (Unskilled) day 0.90 198.33 178.50
Bhisti day 0.08 198.33 15.87
Total material and labour = (a+b) 2,776.69
Say Rs. 2,776.70
Labour Rate 202.30
IV. In cement lime mortar
(1:0.5:4.5)
Unit = cum
a) Material
Brick first class Nos. 500.00 3.00 1,500.00
Cement lime mortar cum 0.24 3,582.84 859.88
(Rate as in item 11.5 III)
b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 137.47
per cent of cost of
materials and labour
(a+b)
472
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1.3 (Rate as cum 0.03 2,933.00 87.99
in item 11.5. I)
b) Labour
Mate day 0.04 116.67 4.67
Mason 1st Class day 0.50 211.17 105.59
Mazdoor (Unskilled) day 0.50 116.67 58.34
Bhisti day 0.20 116.67 23.33
c) Overheads @ 20% on (a+b) 55.98
473
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1:4 (Rate as cum 0.19 2,296.00 436.24
in item 11.5 II )
b) Labour
Mate day 0.06 116.67 7.00
Mason 1st Class day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.30 116.67 35.00
c) Overheads @ 20% on (a+b) 134.99
474
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
475
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Analysis of Rate
12.6 700 Construction of dry rabble masonry
for retaining walls, breast walls,
revetment walls and parapets etc.
for sub structure and super
structure complete as per drawing
and technical specification clauses
704.6 and 1302.5
Unit = cum
Taking output = Cum
a) Material
Stone for R/R masonry cum 1.00 946.31 946.31
Through and bond stone Nos. 7.00 15.00 105.00
b) Labour
Mate day 0.12 175.00 21.00
Mason 1st Class day 1.20 280.00 336.00
Mazdoor (Unskilled) day 1.80 175.00 315.00
Bhisti day 0.08 175.00 14.00
Add for scaffolding @ 5 per cent on (a+b) 86.87
c) Overheads @ 20% on (a+b) 364.84
d) Contractor’s profit @ 10% on (a+b+c) 218.90
Rate per cum = a+b+c+d 2,407.91
Say Rs. 2,407.90
Labour Rate 686.00
Scaffolding @ 5% 34.30
Overheads @ 20% 144.06
Contractor’s profit @ 10% 86.44
Rate per 10 sqm 950.80
Say Rs. 674.65
12.7 700 Stone masonry in cement mortar
for substructure complete as per
drawing & technical
specification Clauses 702, 704,
1202 and 1204
476
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
477
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for CR cum 0.60 500.00 300.00
masonry 1st sort
478
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
479
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
a) Material
Stone for C.R masonry (1st cum 1.10 1,046.31 1,150.94
sort)
Through and bond stone (7 Nos 7.00 15.00 105.00
Nos.0.24x0.24x0.39=0.16
cum)
Cement morter 1:6 (11.6-III) cum 0.30 2,259.00 677.70
1,933.64
b) Labour
Mate day 0.14 175.00 24.50
Mason 1st Class day 1.50 280.00 420.00
Mazdoor (Unskilled) day 2.10 175.00 367.50
Bhisti day 0.08 175.00 14.00
826.00
Add for scaffolding @ 5 per cent on (a+b) 137.98
c) Overheads @ 20% on (a+b) 579.52
d) Contractor’s profit @ 10% on (a+b+c) 347.71
Rate per cum (a+b+c+d) 3,824.86
Say Rs. 3,824.85
Labour Rate 826.00
Labour in CM 1:6 35.70
Scaffolding @ 5% 43.09
Overheads @ 20% 180.96
Contractor’s profit @ 10% 108.57
Rate per cum 1,194.32
Say Rs. 863.70
(v) In cement morter 1:8
a) Material
Stone for C.R masonry (1st cum 1.10 500.00 550.00
sort)
Through and bond stone (7 Nos 7.00 10.00 70.00
Nos.0.24x0.24x0.39=0.16
cum)
Cement morter 1:8 (11.6-III) cum 0.30 1,365.00 409.50
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor (Unskilled) day 2.10 116.67 245.01
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5 per 80.85
cent on (a+b)
480
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for CR masonry 1st cum 1.10 500.00 550.00
sort
Through and bond stone Nos. 7.00 10.00 70.00
(7 no x 0.24 x 0.24 m x 0.39
m = 0.16 cum)
Cement lime mortar (Rate as cum 0.30 3,582.84 1,074.85
in item 11.5. III)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor (Unskilled) day 2.10 116.67 245.01
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5% of 114.11
(a) and (b)
c) Overheads @ 20% on (a+b) 479.28
481
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)
482
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
483
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)
484
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
485
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
486
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)
487
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
488
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)
489
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
490
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Scaffolding @ 5% 26.30
Overheads @ 20% 110.46
Contractor’s profit @ 10% 66.28
Rate per cum 729.06
Say Rs. 729.05
(v) In cement lime mortar
(1:0.5:4.5)
Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)
491
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
492
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Cement t 0.275 4,900.00 1,347.50
Coarse sand cum 0.48 300.00 144.00
40 mm aggregate cum 0.48 440.00 211.20
20 mm aggregate cum 0.24 460.00 110.40
10 mm aggregate cum 0.08 480.00 38.40
b) Labour
Mate day 0.09 116.67 10.50
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.27 116.67 31.50
c) Farmwork @ 10% on 214.80
(a+b+c)
d) Overheads @ 20% on 472.55
(a+b+c+d)
e) Contractor’s profit @ 283.53
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,118.84
493
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 1.63 116.67 190.17
Bhisti day 0.27 116.67 31.50
c) Farmwork @ 10% on 241.45
(a+b+c)
d) Overheads @ 20% on 531.20
(a+b+c+d)
e) Contractor’s profit @ 318.72
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,505.89
Unit = cum
a) Material
Cement t 0.330 4,900.00 1,617.00
Sand cum 0.45 300.00 135.00
40 mm aggregate cum 0.36 440.00 158.40
20 mm aggregate cum 0.36 460.00 165.60
10 mm aggregate cum 0.18 480.00 86.40
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 1.63 116.67 190.17
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hours 0.40 200.00 80.00
cum capacity
d) Add 2 per cent to 49.89
cater for extra lift.
494
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
495
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
496
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
a) Material
Cement t 0.350 4,900.00 1,715.00
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Farmwork @ 10% on 261.92
(a+b+c)
e) Overheads @ 20% on 576.23
(a+b+c+d)
f) Contractor’s profit @ 345.74
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,803.10
497
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
498
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
499
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
500
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
501
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
2 Extra expenditure on
structures which are more
than 5 m height is to cater for
cost involved for approaching
the work spot by providing
ramp for use by labour.
Analysis of Rate
12.9 1000 Supplying, fitting and placing
HYSD bar reinforcement (Fe 415)
in substructrue complete as per
drawings and technical
specification Clauses 1002,
1005, 1010 & 1202
Unit = t
a) Material
HYSD bars including 5 per t 1.05 50,631.50 53,163.08
cent overlaps and wastage
Binding wire kg 6.00 70.00 420.00
b) Labour for cutting,
bending, shifting to site,
tying, and placing in
position
502
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = t
a) Material
TMT bars including 5 per t 1.05 50,639.46 53,171.43
cent overlaps and wastage
Binding wire kg 6.00 70.00 420.00
b) Labour for cutting, bending,
shifting to site, tying, and
placing in position
503
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = Nos
Taking output = 30 Nos
a) Material
AC pipe 100 mm dia m 31.50 120.00 3,780.00
including wastage @ 5 per
cent. Average length of
weep hole is taken as one
metre for the purpose of
estimating
504
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Analysis of Rate
12.13 600
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment,
wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures
with slop of 1(v):20(H) towards drawing face complete as per drawing and technical
specification clauses 614, 709, 1204.3.7
Unit = Nos.
Taking output = 30 Nos.
a) Material
PVC pipe 100 mm dia unloading m 31.50 250.00 7,875.00
wostofer@ 5percent
Cement morter 1:3 (for rate refer to cum 0.05 4,346.09 217.30
cement 11.5)
b) Labour
Mate day 0.03 210.00 6.30
Mason (1st Class) day 0.50 315.00 157.50
Mazdoor (Unskilled) day 0.25 210.00 52.50
8,308.60
c) Overheads @ 20% on (a+b) 1,661.72
d) Contractor’s profit @ 10% on (a+b+c) 997.03
Cost for 30Nos. = a+b+c+d 10,967.36
Rate for 1 No. 365.58
Add 1% labour cess 3.66
369.23
Say Rs. 264.25
Executive Engineer
Sarkaghat Division
HPPWD Sarkaghat
505
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
Taking output = 10 cum
I) Granular material
a) Material
Granular material cum 12.00 405.68 4,868.16
b) Labour
Mate day 0.28 210.00 58.80
Mazdoor (Unskilled) day 10.00 210.00 2,100.00
506
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Executive Engineer
Sarkaghat Division
HPPWD Sarkaghat
507
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = cum
Taking output = 10 cum
a) Material
Filter media as per cum 12.00 250.00 3,000.00
specification
b) Labour
Mate day 0.40 116.67 46.67
Mazdoor (Unskilled) day 9.00 116.67 1,050.03
Mazdoor (Skilled) day 1.00 116.67 116.67
Bhisti day 0.50 116.67 58.34
c) Overheads @ 20% on (a+b) 854.34
508
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
509
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = Running m
Taking output = 1 m
Assume wall thickness = 345 mm
Projection of the coping will be
25 mm wide on both side of the
wall = 345 + 50 = 395 mm
Quantity = 1 x 0.395 x 0.150 =
0.059
PCC M-20 Grade (1:2:4) Nominal
Mix
As per item No. 12.8 (III)(i) cum 0.059 3,436.20 202.74
Add 10 per cent extra of cost of (a) 20.27
being architectural coping
Cost of 1 m = a 223.01
Say Rs. 223.00
Labour Rate cum 0.059 366.10 21.60
Add 10 per cent extra 2.16
Cost of 1 m 23.76
Say Rs. 23.80
510
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = Nos
a) Material
AC pipe 100 mm dia i/c m 0.63 120.00 75.60
wastage of 5 per cent 600
mm long upto the bottom of
levelling course
Filter media base with stone cum 0.25 250.00 62.50
aggregate 0.5 m x 0.5 m area
1 m deep
b) Labour
Mate day 0.031 116.67 3.62
Mason 1st Class day 0.016 211.17 3.38
Mazdoor (Unskilled) day 0.80 116.67 93.34
c) Overheads @ 20% on (a+b) 47.69
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement morter 1:3 (for rate cum 0.03 2,933.00 87.99
refer to cement 11.5)
b) Labour
Mate day 0.04 116.67 4.67
Mason (1st Class) day 0.70 211.17 147.82
511
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement morter 1:3 (for rate cum 0.03 2,933.00 87.99
refer to cement 11.5)
b) Labour
Mate day 0.04 116.67 4.67
Mason (1st Class) day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.20 116.67 23.33
c) Overheads @ 20% on (a+b) 62.54
512
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
513
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns
514