Chapter 12

SUBSTRUCTURE

Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

12.1 600 Brick masonry work in cement


mortar in substructure complete
excepting pointing and
plastering, as per drawing and
technical specification Clauses
602, 603, 604, 1202 & 1204

I. In 1:3 cement mortar


Unit = cum
a) Material
Bricks Nos. 500.00 3.00 1,500.00
Cement mortar (Rate as cum 0.24 2,933.00 703.92
in item 11.5 I)
b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 129.67
per cent of cost of
c) materials
Overheadsand @ 20%labour
on 544.61
(a+b)
(a+b)
d) Contractor’s profit @ 326.76
10% on (a+b+c)
Rate per cum = a+b+c+d 3,594.40
Say Rs. 3,594.40
Labour Rate 389.44
Morter 1:3 28.56
Scaffolding @ 5% 20.90
Overheads @ 20% 87.78
Contractor’s profit @ 52.67
10%
Rate per cum 579.35
Say Rs. 579.35
II. In 1:4 Cement mortar
Unit = cum
a) Material
Bricks Nos. 500.00 3.00 1,500.00
Cement mortar

470
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

(Rate as in item 11.5 II) cum 0.24 2,296.00 551.04

b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 122.02
per cent of cost of
materials and labour
(a+b)
c) Overheads @ 20% on 512.50
(a+b)
d) Contractor’s profit @ 307.50
10% on (a+b+c)
Rate per cum = a+b+c+d 3,382.51
Say Rs. 3,382.50
Labour Rate 389.44
Morter 1:3 28.56
Scaffolding @ 5% 20.90
Overheads @ 20% 87.78
Contractor’s profit @ 52.67
10%
Rate per cum 579.35
Say Rs. 579.35
III. In 1:5 cement mortar
Unit = cum
a) Material
Bricks 1st class Nos. 500.00 3.00 1,500.00
Cement mortar cum 0.24 2,776.69 666.40
b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 127.79
per cent of cost of
materials and labour
(a+b)
c) Overheads @ 20% on 536.73
(a+b)
d) Contractor’s profit @ 322.04
10% on (a+b+c)

471
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Rate per cum = a+b+c+d 3,542.40


Say Rs. 3,268.40
Labour Rate 389.44
Morter 1:5 28.56
Scaffolding @ 5% 20.90
Overheads @ 20% 87.78
Contractor’s profit @ 52.67
10%
Rate per cum 579.35
Say Rs. 579.35
Sub-analysis
Cement mortar 1:5 (1 cement, 5 sand)

a) Material
Cement t 0.31 4,832.57 1,498.10
Sand cum 1.05 1,025.04 1,076.29
b) Labour
Mate day 0.04 198.33 7.93
Mazdoor (Unskilled) day 0.90 198.33 178.50
Bhisti day 0.08 198.33 15.87
Total material and labour = (a+b) 2,776.69
Say Rs. 2,776.70
Labour Rate 202.30
IV. In cement lime mortar
(1:0.5:4.5)
Unit = cum
a) Material
Brick first class Nos. 500.00 3.00 1,500.00
Cement lime mortar cum 0.24 3,582.84 859.88
(Rate as in item 11.5 III)

b) Labour
Mate day 0.09 116.67 10.50
Mason 1st Class day 0.80 211.17 168.94
Mazdoor (Unskilled) day 1.60 116.67 186.67
Bhisti day 0.20 116.67 23.33
Add for scaffolding @ 5 137.47
per cent of cost of
materials and labour
(a+b)

472
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

c) Overheads @ 20% on 577.36


(a+b)
d) Contractor’s profit @ 346.41
10% on (a+b+c)
Rate per cum = a+b+c+d 3,810.56
Say Rs. 3,810.60
Labour Rate 389.44
Morter 1:0.5:4.5 85.40
Scaffolding @ 5% 23.74
Overheads @ 20% 99.72
Contractor’s profit @ 59.83
10%
Rate per cum 658.13
Say Rs. 658.15
12.2 600 Pointing with cement mortar
(1:3) on brickwork as per
drawing and technical
specification Clauses 613.3 and
1204

Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1.3 (Rate as cum 0.03 2,933.00 87.99
in item 11.5. I)
b) Labour
Mate day 0.04 116.67 4.67
Mason 1st Class day 0.50 211.17 105.59
Mazdoor (Unskilled) day 0.50 116.67 58.34
Bhisti day 0.20 116.67 23.33
c) Overheads @ 20% on (a+b) 55.98

d) Contractor’s profit @ 10% 33.59


on (a+b+c)
Rate per 10 sqm = (a+b+c+d) 369.48
Say Rs. 369.50
Labour Rate 191.93
Morter 1:3 3.57
Overheads @ 20% 39.10
Contractor’s profit @ 10% 23.46
Rate per 10 sqm 258.06
Say Rs. 258.10
Note: Scaffolding is already included in
item 12.1

473
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

12.3 600 Plastering with cement mortar


(1:4), 12 mm thick on brickwork
in substructure as per technical
specification Clauses 613.4 &
1204

Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1:4 (Rate as cum 0.19 2,296.00 436.24
in item 11.5 II )
b) Labour
Mate day 0.06 116.67 7.00
Mason 1st Class day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.30 116.67 35.00
c) Overheads @ 20% on (a+b) 134.99

d) Contractor’s profit @ 10% 80.99


on (a+b+c)
Rate per 10 sqm = a+b+c+d 890.93
Say Rs. 890.95
Labour Rate 238.71
Morter 1:4 22.61
Overheads @ 20% 52.26
Contractor’s profit @ 10% 31.36
Rate per 10 sqm 344.94
Say Rs. 344.95
12.4 600 Plastering with cement mortar
(1:4), 15 mm thick on brickwork
in substructure as per technical
specification Clauses 613.4 &
Unit = 10 sqm
1204
Taking output = 10 sqm
a) Material
Cement mortar 1:4 (Rate as cum 0.24 2,296.00 551.04
in item 11.5 II )
b) Labour
Mate day 0.06 116.67 7.00
Mason 1st Class day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.30 116.67 35.00
c) Overheads @ 20% on (a+b) 157.95

474
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

d) Contractor’s profit @ 10% 94.77


on (a+b+c)
Rate per 10 sqm = a+b+c+d 1,042.46
Say Rs. 1,042.50
Labour Rate 238.71
Morter 1:4 28.56
Overheads @ 20% 53.45
Contractor’s profit @ 10% 32.07
Rate per 10 sqm 352.79
Say Rs. 352.80
12.5 600 Plastering with cement mortar
(1:4), 18 mm thick on brickwork
in substructure as per technical
(ii) specification
Unit = 10 sqm Clauses 613.4 &
1204
Taking output = 10 sqm
a) Material
Cement mortar 1:4 (Rate as cum 0.29 2,296.00 665.84
in item 11.5 II )
b) Labour
Mate day 0.06 116.67 7.00
Mason 1st Class day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.30 116.67 35.00
c) Overheads @ 20% on (a+b) 180.91

d) Contractor’s profit @ 10% 108.55


on (a+b+c)
Rate per 10 sqm = a+b+c+d 1,194.00
Say Rs. 1,194.00
Labour Rate 238.71
Morter 1:4 34.51
Overheads @ 20% 54.64
Contractor’s profit @ 10% 32.79
Rate per 10 sqm 360.64
Say Rs. 360.65
Note: 1 Scaffolding is already
included in item 12.1
2 Though cement mortar of
leaner mix has been included
in item 12.1, for cement
plaster mix of 1:4 has been
proposed for better finishing

475
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Analysis of Rate
12.6 700 Construction of dry rabble masonry
for retaining walls, breast walls,
revetment walls and parapets etc.
for sub structure and super
structure complete as per drawing
and technical specification clauses
704.6 and 1302.5

Unit = cum
Taking output = Cum
a) Material
Stone for R/R masonry cum 1.00 946.31 946.31
Through and bond stone Nos. 7.00 15.00 105.00
b) Labour
Mate day 0.12 175.00 21.00
Mason 1st Class day 1.20 280.00 336.00
Mazdoor (Unskilled) day 1.80 175.00 315.00
Bhisti day 0.08 175.00 14.00
Add for scaffolding @ 5 per cent on (a+b) 86.87
c) Overheads @ 20% on (a+b) 364.84
d) Contractor’s profit @ 10% on (a+b+c) 218.90
Rate per cum = a+b+c+d 2,407.91
Say Rs. 2,407.90
Labour Rate 686.00
Scaffolding @ 5% 34.30
Overheads @ 20% 144.06
Contractor’s profit @ 10% 86.44
Rate per 10 sqm 950.80
Say Rs. 674.65
12.7 700 Stone masonry in cement mortar
for substructure complete as per
drawing & technical
specification Clauses 702, 704,
1202 and 1204

I. Coursed rubble masonry


(1st sort)
(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for CR cum 1.10 500.00 550.00
masonry 1st sort

476
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Through and bond Nos. 7.00 10.00 70.00


stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement mortar cum 0.30 2,933.00 879.90


(Rate as in item
11.5. I)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor day 2.10 116.67 245.01
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 104.37
@ 5 per cent of
cost of material (a)
and labour (b)
(a+b)

c) Overheads @ 20% 438.34


on (a+b)
d) Contractor’s 263.00
profit @ 10% on
(a+b+c)
Rate per cum = 2,893.04
a+b+c+d
Say Rs. 2,893.05
Labour Rate 587.43
Morter 1:3 35.70
Scaffolding @ 5% 31.16
Overheads @ 130.86
20%
Contractor’s profit 78.51
@ 10%
Rate per cum 863.66
Say Rs. 863.70
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for CR cum 1.10 500.00 550.00
masonry 1st sort

477
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Through and bond Nos. 7.00 10.00 70.00


stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement mortar cum 0.30 2,296.00 688.80


(Rate as in item
11.5 II)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor day 2.10 116.67 245.01
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 94.81
@ 5 per cent of
cost of material (a)
and labour (b) 5%
on (a+b)

c) Overheads @ 20% 398.21


on (a+b)
d) Contractor’s 238.93
profit @ 10% on
(a+b+c)
Rate per cum = 2,628.18
a+b+c+d
Say Rs. 2,628.20
Labour Rate 587.43
Morter 1:4 35.70
Scaffolding @ 5% 31.16
Overheads @ 130.86
20%
Contractor’s profit 78.51
@ 10%
Rate per cum 863.66
Say Rs. 863.70
(iii) In cement mortar (1:5)

Unit = cum
a) Material
Stone for CR cum 0.60 500.00 300.00
masonry 1st sort

478
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Through and bond Nos. 7.00 10.00 70.00


stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Spalls/blasted cum 0.50 250.00 125.00


rubbles
Cement mortar cum 0.33 2,776.69 916.31
(Rate same as in
item 12.1 III)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor day 2.00 116.67 233.34
(Unskilled)
Bhisti day 0.08 116.67 9.33
As for scaffolding 97.24
@ 5% on (a+b)
c) Overheads @ 20% 408.42
on (a+b)
d) Contractor’s 245.05
profit @ 10% on
(a+b+c)
Rate per cum = 2,695.54
a+b+c+d
Say Rs. 2,318.80
Labour Rate 533.53
Morter 1:5 39.27
Scaffolding @ 5% 28.64
Overheads @ 120.29
20%
Contractor’s profit 72.17
@ 10%
Rate per cum 793.90
Say Rs. 793.90
Analysis of Rate
Stone masonry in cement mortar
for substructure complete as per
drawing & technical
specification Clauses 702, 704,
1202 and 1204

12.7 I. Coursed rubble masonry


(iv) (1st sort)
In cement morter 1:6

479
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

a) Material
Stone for C.R masonry (1st cum 1.10 1,046.31 1,150.94
sort)
Through and bond stone (7 Nos 7.00 15.00 105.00
Nos.0.24x0.24x0.39=0.16
cum)
Cement morter 1:6 (11.6-III) cum 0.30 2,259.00 677.70
1,933.64
b) Labour
Mate day 0.14 175.00 24.50
Mason 1st Class day 1.50 280.00 420.00
Mazdoor (Unskilled) day 2.10 175.00 367.50
Bhisti day 0.08 175.00 14.00
826.00
Add for scaffolding @ 5 per cent on (a+b) 137.98
c) Overheads @ 20% on (a+b) 579.52
d) Contractor’s profit @ 10% on (a+b+c) 347.71
Rate per cum (a+b+c+d) 3,824.86
Say Rs. 3,824.85
Labour Rate 826.00
Labour in CM 1:6 35.70
Scaffolding @ 5% 43.09
Overheads @ 20% 180.96
Contractor’s profit @ 10% 108.57
Rate per cum 1,194.32
Say Rs. 863.70
(v) In cement morter 1:8
a) Material
Stone for C.R masonry (1st cum 1.10 500.00 550.00
sort)
Through and bond stone (7 Nos 7.00 10.00 70.00
Nos.0.24x0.24x0.39=0.16
cum)
Cement morter 1:8 (11.6-III) cum 0.30 1,365.00 409.50
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor (Unskilled) day 2.10 116.67 245.01
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5 per 80.85
cent on (a+b)

480
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

c) Overheads @ 20% on (a+b) 339.56

d) Contractor’s profit @ 10% 203.73


on (a+b+c)
Rate per cum (a+b+c+d) 2,241.06
Say Rs. 2,241.10
Labour Rate 587.43
Labour in CM 1:6 35.70
Scaffolding @ 5% 31.16
Overheads @ 20% 130.86
Contractor’s profit @ 10% 78.51
Rate per cum 863.66
Say Rs. 863.70
(vi) In cement lime mortar (1:0.5:4.5)

Unit = cum
a) Material
Stone for CR masonry 1st cum 1.10 500.00 550.00
sort
Through and bond stone Nos. 7.00 10.00 70.00
(7 no x 0.24 x 0.24 m x 0.39
m = 0.16 cum)
Cement lime mortar (Rate as cum 0.30 3,582.84 1,074.85
in item 11.5. III)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.50 211.17 316.76
Mazdoor (Unskilled) day 2.10 116.67 245.01
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5% of 114.11
(a) and (b)
c) Overheads @ 20% on (a+b) 479.28

d) Contractor’s profit @ 10% 287.57


on (a+b+c)
Rate per cum = a+b+c+d 3,163.24
Say Rs. 3,163.25
Labour Rate 587.43
Morter 1:0.5:4.5 106.76
Scaffolding @ 5% 34.71
Overheads @ 20% 145.78
Contractor’s profit @ 10% 87.47
Rate per cum 962.15

481
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Say Rs. 962.15


II. Coursed Rubble masonry
(2nd sort)
(i) In cement mortar (1:3)

Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Spalls/blasted cum 0.50 250.00 125.00


rubbles
Cement mortar cum 0.33 2,933.00 967.89
(Rate as in item
11.5 I)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor day 2.00 116.67 233.34
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 99.07
@ 5 per cent of
cost of material (a)
and labour (b)

c) Overheads @ 20% 416.10


on (a+b)
d) Contractor’s 249.66
profit @ 10% on
(a+b+c)
Rate per cum = 2,746.25
a+b+c+d
Say Rs. 2,746.25
Labour Rate 533.53
Morter 1:3 39.27
Scaffolding @ 5% 28.64
Overheads @ 120.29
20%

482
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Contractor’s profit 72.17


@ 10%
Rate per cum 793.90
Say Rs. 793.90
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Spall/blasted cum 0.50 250.00 125.00


rubble
Cement mortar cum 0.33 2,296.00 757.68
(Rate same as in
item 11.5 II)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor day 2.00 116.67 233.34
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 88.56
@ 5 per cent of
cost of material (a)
and labour (b)

c) Overheads @ 20% 371.95


on (a+b)
d) Contractor’s 223.17
profit @ 10% on
(a+b+c)
Rate per cum = 2,454.90
a+b+c+d
Say Rs. 2,454.90
Labour Rate 533.53
Morter 1:4 39.27
Scaffolding @ 5% 28.64
Overheads @ 120.29
20%

483
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Contractor’s profit 72.17


@ 10%
Rate per cum 793.90
Say Rs. 793.90
(iii) In cement mortar (1:5)

Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Spall/blasted cum 0.50 250.00 125.00


rubble
Cement mortar cum 0.33 2,776.69 916.31
(Rate same as in
item 12.1 III)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor day 2.00 116.67 233.34
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 96.49
@ 5 per cent on
(a+b)
c) Overheads @ 20% 405.27
on (a+b)
d) Contractor’s 243.16
profit @ 10% on
(a+b+c)
Rate per cum = 2,674.75
a+b+c+d
Say Rs. 2,298.00
Labour Rate 533.53
Morter 1:5 39.27
Scaffolding @ 5% 28.64
Overheads @ 120.29
20%
Contractor’s profit 72.17
@ 10%

484
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Rate per cum 793.90


Say Rs. 793.90
Analysis of Rate

(iv) In cement morter 1:6


a) Material
Stone for C.R masonry (2nd cum 0.60 475.00 285.00
sort)
Through and bond stone (7 Nos 7.00 10.00 70.00
Nos.0.24x0.24x0.39=0.16
cum)
Spalls/blasted rubbles cum 0.50 250.00 125.00
Cement morter 1:6 (11.6-III) cum 0.33 1,659.00 547.47
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5 per 78.05
cent on (a+b)
c) Overheads @ 20% on (a+b) 327.81

d) Contractor’s profit @ 10% 196.69


on (a+b+c)
Rate per cum (a+b+c+d) 2,163.54
Say Rs. 2,163.55
Labour Rate 533.53
Labour in CM 1:6 39.27
Scaffolding @ 5% 28.64
Overheads @ 20% 120.29
Contractor’s profit @ 10% 72.17
Rate per cum 793.90
Say Rs. 793.90
(v) In cement morter 1:8
a) Material
Stone for C.R masonry (2nd cum 0.60 475.00 285.00
sort)
Through and bond stone (7 Nos 7.00 10.00 70.00
Nos.0.24x0.24x0.39=0.16
cum)
Spalls/blasted rubbles cum 0.50 250.00 125.00
Cement morter 1:8 (11.6-III) cum 0.33 1,365.00 450.45
b) Labour

485
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Mate day 0.14 116.67 16.33


Mason 1st Class day 1.30 211.17 274.52
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5 per 73.20
cent on (a+b)
c) Overheads @ 20% on (a+b) 307.44

d) Contractor’s profit @ 10% 184.46


on (a+b+c)
Rate per cum (a+b+c+d) 2,029.07
Say Rs. 2,029.10
Labour Rate 533.53
Labour in CM 1:6 39.27
Scaffolding @ 5% 28.64
Overheads @ 20% 120.29
Contractor’s profit @ 10% 72.17
Rate per cum 793.90
Say Rs. 793.90
(vi) In cement lime mortar
(1:0.5:4.5)
Unit = cum
a) Material
Stone for CR cum 0.60 475.00 285.00
masonry 2nd sort
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Spalls/blasted cum 0.50 250.00 125.00


rubbles
Cement lime cum 0.33 3,582.84 1,182.34
mortar (Rate as in
item 11.5 III)
b) Labour
Mate day 0.14 116.67 16.33
Mason 1st Class day 1.30 211.17 274.52
Mazdoor day 2.00 116.67 233.34
(Unskilled)
Bhisti day 0.08 116.67 9.33

486
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Add for scaffolding 109.79


@ 5 per cent on
(a+b)
c) Overheads @ 20% 461.13
on (a+b)
d) Contractor’s 276.68
profit @ 10% on
(a+b+c)
Rate per cum = 3,043.47
a+b+c+d
Say Rs. 3,043.50
Labour Rate 533.53
Morter 1:0.5:4.5 117.43
Scaffolding @ 5% 32.55
Overheads @ 136.70
20%
Contractor’s profit 82.02
@ 10%
Rate per cum 902.23
Say Rs. 902.25
III. Random rubble masonry
(i) In cement mortar (1:3)

Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement mortar cum 0.33 2,933.00 967.89


(Rate as in item
11.5 I)
b) Labour
Mate day 0.12 116.67 14.00
Mason 1st Class day 1.20 211.17 253.40
Mazdoor day 1.80 116.67 210.01
(Unskilled)
Bhisti day 0.08 116.67 9.33

487
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Add for scaffolding 96.23


@ 5 per cent of
cost of material (a)
and labour (b)

c) Overheads @ 20% 404.17


on (a+b)
d) Contractor’s 242.50
profit @ 10% on
(a+b+c)
Rate per cum = 2,667.54
a+b+c+d
Say Rs. 2,667.55
Labour Rate 486.74
Morter 1:3 39.27
Scaffolding @ 5% 26.30
Overheads @ 110.46
20%
Contractor’s profit 66.28
@ 10%
Rate per cum 729.06
Say Rs. 729.05
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement mortar cum 0.33 2,296.00 757.68


(Rate same as in
item 11.5 II)
b) Labour
Mate day 0.12 116.67 14.00
Mason 1st Class day 1.20 211.17 253.40
Mazdoor day 1.80 116.67 210.01
(Unskilled)
Bhisti day 0.08 116.67 9.33

488
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Add for scaffolding 85.72


@ 5 per cent of
cost of material (a)
and labour (b) 5%
on (a+b)

c) Overheads @ 20% 360.03


on (a+b)
d) Contractor’s 216.02
profit @ 10% on
(a+b+c)
Rate per cum = 2,376.19
a+b+c+d
Say Rs. 2,376.20
Labour Rate 486.74
Morter 1:4 39.27
Scaffolding @ 5% 26.30
Overheads @ 110.46
20%
Contractor’s profit 66.28
@ 10%
Rate per cum 729.06
Say Rs. 729.05
(iii) In cement mortar (1:5)

Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement mortar cum 0.33 2,776.69 916.31


(Rate same as in
item 12.1 III)
b) Labour
Mate day 0.12 116.67 14.00
Mason 1st Class day 1.20 211.17 253.40
Mazdoor day 1.80 116.67 210.01
(Unskilled)
Bhisti day 0.08 116.67 9.33

489
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Add for scaffolding 93.65


@ 5 per cent on
(a+b)
c) Overheads @ 20% 393.34
on (a+b)
d) Contractor’s 236.00
profit @ 10% on
(a+b+c)
Rate per cum = 2,596.05
a+b+c+d
Say Rs. 2,219.30
Labour Rate 486.74
Morter 1:5 39.27
Scaffolding @ 5% 26.30
Overheads @ 110.46
20%
Contractor’s profit 66.28
@ 10%
Rate per cum 729.06
Say Rs. 729.05
(iv) In cement morter 1:6
Unit=cum
a) Material
Stone for R.R masonry cum 1.00 400.00 400.00
Through and bond stone (7 Nos 7.00 10.00 70.00
Nos.0.24x0.24x0.39=0.16
cum)
Cement morter 1:6 (11.6-III) cum 0.33 1,659.00 547.47
b) Labour
Mate day 0.12 116.67 14.00
Mason 1st Class day 1.20 211.17 253.40
Mazdoor (Unskilled) day 1.80 116.67 210.01
Bhisti day 0.08 116.67 9.33
Add for scaffolding @ 5 per 75.21
cent on (a+b)
c) Overheads @ 20% on (a+b) 315.88

d) Contractor’s profit @ 10% 189.53


on (a+b+c)
Rate per cum (a+b+c+d) 2,084.84
Say Rs. 2,084.90
Labour Rate 486.74
Labour in CM 1:6 39.27

490
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Scaffolding @ 5% 26.30
Overheads @ 20% 110.46
Contractor’s profit @ 10% 66.28
Rate per cum 729.06
Say Rs. 729.05
(v) In cement lime mortar
(1:0.5:4.5)
Unit = cum
a) Material
Stone for RR cum 1.00 400.00 400.00
masonry
Through and bond Nos. 7.00 10.00 70.00
stone
(7 no x 0.24 x 0.24
m x 0.39 m = 0.16
cum)

Cement lime cum 0.33 3,582.84 1,182.34


mortar (Rate as in
item 11.5 III)
b) Labour
Mate day 0.12 116.67 14.00
Mason 1st Class day 1.20 211.17 253.40
Mazdoor day 1.80 116.67 210.01
(Unskilled)
Bhisti day 0.08 116.67 9.33
Add for scaffolding 106.95
@ 5 per cent on
(a+b)
c) Overheads @ 20% 449.21
on (a+b)
d) Contractor’s 269.52
profit @ 10% on
(a+b+c)
Rate per cum = 2,964.76
a+b+c+d
Say Rs. 2,964.80
Labour Rate 486.74
Morter 1:0.5:4.5 117.43
Scaffolding @ 5% 30.21
Overheads @ 126.88
20%
Contractor’s profit 76.13
@ 10%

491
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Rate per cum 837.39


Say Rs. 837.40
12.8 800 Plain/reinforced cement
concrete in sub structure
as per drawings and
technical specification
clauses 802, 804, 805, 806,
807, 1202 and 1204

I P.C.C. grade M 15 (1) upto


5 metre height
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 4,728.60 1,300.37
Coarse sand cum 0.48 1,160.89 557.23
40 mm aggregate cum 0.48 913.68 438.57
20 mm aggregate cum 0.24 963.68 231.28
10 mm aggregate cum 0.08 963.68 38.40
b) Labour
Mate day 0.08 175.00 14.00
Mason (1st Class) day 0.10 280.00 28.00
Mazdoor (Unskilled) day 1.63 175.00 285.25
Bhisti day 0.27 175.00 47.25
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
3,020.34

d) Formwork @ 10% on (a+b+c) 302.03


3,322.38
e) Overheads @ 20% on (a+b+c+d) 664.48
3,986.86
f) Contractor’s profit @ 10% on (a+b+c+d+e) except 268.65
cement
Rate per cum = a+b+c+d+e+f 4,255.51
Say Rs. 4,255.50
Labour Rate 374.50
Farm Work @10% 37.45
Overheads @ 20% 82.39
Contractor’s profit @ 49.43
10%

492
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Rate per cum 543.77


Say Rs. 366.10
II (i) Nominal mix 1:2.5:5 (Hand
mixing) upto 5m height

Unit = cum
a) Material
Cement t 0.275 4,900.00 1,347.50
Coarse sand cum 0.48 300.00 144.00
40 mm aggregate cum 0.48 440.00 211.20
20 mm aggregate cum 0.24 460.00 110.40
10 mm aggregate cum 0.08 480.00 38.40
b) Labour
Mate day 0.09 116.67 10.50
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.27 116.67 31.50
c) Farmwork @ 10% on 214.80
(a+b+c)
d) Overheads @ 20% on 472.55
(a+b+c+d)
e) Contractor’s profit @ 283.53
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,118.84

Say Rs. 3,118.85


Labour Rate 296.46
Farm Work @10% 29.65
Overheads @ 20% 65.22
Contractor’s profit @ 39.13
10%
Rate per cum 430.46
Say Rs. 430.50
III P.C.C. grade M 20
(i) Nominal mix (1:2:4) for
height upto 5m
Unit = cum
a) Material
Cement t 0.330 4,900.00 1,617.00
Coarse sand cum 0.45 300.00 135.00
40 mm aggregate cum 0.36 440.00 158.40
20 mm aggregate cum 0.36 460.00 165.60
10 mm aggregate cum 0.18 480.00 86.40

493
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 1.63 116.67 190.17
Bhisti day 0.27 116.67 31.50
c) Farmwork @ 10% on 241.45
(a+b+c)
d) Overheads @ 20% on 531.20
(a+b+c+d)
e) Contractor’s profit @ 318.72
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,505.89

Say Rs. 3,505.90


Labour Rate 252.12
Farm Work @10% 25.21
Overheads @ 20% 55.47
Contractor’s profit @ 33.28
10%
Rate per cum 366.08
Say Rs. 366.10
(ii) Nominal mix (1:2:4) for
height above 5m upto 10m

Unit = cum
a) Material
Cement t 0.330 4,900.00 1,617.00
Sand cum 0.45 300.00 135.00
40 mm aggregate cum 0.36 440.00 158.40
20 mm aggregate cum 0.36 460.00 165.60
10 mm aggregate cum 0.18 480.00 86.40
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 1.63 116.67 190.17
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hours 0.40 200.00 80.00
cum capacity
d) Add 2 per cent to 49.89
cater for extra lift.

494
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

e) Farmwork @ 12% on 305.33


(a+b+c)
f) Overheads @ 20% on 569.95
(a+b+c+d)
g) Contractor’s profit @ 341.97
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,761.66

Say Rs. 3,761.70


Labour Rate 252.12
Add 2 per cent to cater 5.04
for extra lift.
Farm Work @12% 30.86
Overheads @ 20% 57.61
Contractor’s profit @ 34.56
10%
Rate per cum 380.19
Say Rs. 380.20
IV P.C.C. grade M 20 (1:2:4)
(i) Hand mix upto 5m height
Unit = cum
a) Material
Cement t 0.330 4,900.00 1,617.00
Sand cum 0.45 300.00 135.00
40 mm aggregate cum 0.36 440.00 158.40
20 mm aggregate cum 0.36 460.00 165.60
10 mm aggregate cum 0.18 480.00 86.40
b) Labour
Mate day 0.09 116.67 10.50
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.27 116.67 31.50
c) Farmwork @ 10% on 245.89
(a+b+c)
d) Overheads @ 20% on 540.95
(a+b+c+d)
e) Contractor’s profit @ 324.57
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,570.26

Say Rs. 3,570.30


Labour Rate 296.46
Farm Work @10% 29.65

495
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Overheads @ 20% 65.22


Contractor’s profit @ 39.13
10%
Rate per cum 430.46
Say Rs. 430.50
P.C.C. grade M 20 (1:2:4)
(ii) Hand mix for height
beyond 5m upto 10m
Unit = cum
a) Material
Cement t 0.330 4,900.00 1,617.00
Sand cum 0.45 300.00 135.00
40 mm aggregate cum 0.36 440.00 158.40
20 mm aggregate cum 0.36 460.00 165.60
10 mm aggregate cum 0.18 480.00 86.40
b) Labour
Mate day 0.09 116.67 10.50
Mason (1st Class) day 0.10 211.17 21.12
Mazdoor (Unskilled) day 2.00 116.67 233.34
Bhisti day 0.27 116.67 31.50
c) Add 2 per cent to 49.18
cater for extra lift.
d) Farmwork @ 12% on 300.96
(a+b+c)
e) Overheads @ 20% on 561.80
(a+b+c+d)
f) Contractor’s profit @ 337.08
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,707.88

Say Rs. 3,707.90


Labour Rate 296.46
Add 2 per cent to cater 5.93
for extra lift.
Farm Work @12% 36.29
Overheads @ 20% 67.73
Contractor’s profit @ 40.64
10%
Rate per cum 447.05
Say Rs. 447.05
V R.C.C. grade M 20 (1:2:4)
(i) Nominal mix upto 5m
height

496
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Unit = cum
a) Material
Cement t 0.350 4,900.00 1,715.00
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Farmwork @ 10% on 261.92
(a+b+c)
e) Overheads @ 20% on 576.23
(a+b+c+d)
f) Contractor’s profit @ 345.74
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,803.10

Say Rs. 3,803.10


Labour Rate 268.01
Farm Work @10% 26.80
Overheads @ 20% 58.96
Contractor’s profit @ 35.38
10%
Rate per cum 389.16
Say Rs. 389.15
(ii) Nominal mix for height
beyond 5m upto 10m
Unit = cum
a) Material
Cement t 0.350 4,900.00 1,715.00
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84

497
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Bhisti day 0.27 116.67 31.50


c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Add 2 per cent to 52.38
cater for extra lift.
e) Farmwork @ 12% on 320.59
(a+b+c)
f) Overheads @ 20% on 598.44
(a+b+c+d)
g) Contractor’s profit @ 359.06
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 3,949.69

Say Rs. 3,949.70


Labour Rate 268.01
Add 2 per cent to cater 5.36
for extra lift.
Farm Work @12% 32.80
Overheads @ 20% 61.24
Contractor’s profit @ 36.74
10%
Rate per cum 404.16
Say Rs. 404.15
(iii) Nominal mix for height
upto 10m
Unit = cum
a) Material
Cement t 0.350 4,900.00 1,715.00
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Add 4 per cent to 104.77
cater for extra lift.

498
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

e) Farmwork @ 15% on 408.60


(a+b+c)
f) Overheads @ 20% on 626.52
(a+b+c+d)
g) Contractor’s profit @ 375.91
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 4,135.01

Say Rs. 4,135.00


Labour Rate 268.01
Add 4 per cent to cater 10.72
for extra lift.
Farm Work @15% 41.81
Overheads @ 20% 64.11
Contractor’s profit @ 38.47
10%
Rate per cum 423.12
Say Rs. 423.10
VI R.C.C. grade M 25 (1:1.5:3)
(i) Upto 5m height
Unit = cum
a) Material
Cement t 0.404 4,900.00 1,979.60
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity@ 10% on
d) Farmwork 288.38
(a+b+c)
e) Overheads @ 20% on 634.44
(a+b+c+d)
f) Contractor’s profit @ 380.66
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 4,187.30

Say Rs. 4,187.30

499
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Labour Rate 268.01


Farm Work @10% 26.80
Overheads @ 20% 58.96
Contractor’s profit @ 35.38
10%
Rate per cum 389.16
Say Rs. 389.15
(ii) For height beyond 5m upto
10m
Unit = cum
a) Material
Cement t 0.404 4,900.00 1,979.60
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Add for 2 percent 57.68
extra lift
e) Farmwork @ 12% on 352.98
(a+b+c)
f) Overheads @ 20% on 658.89
(a+b+c+d)
g) Contractor’s profit @ 395.34
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 4,348.70

Say Rs. 4,348.70


Labour Rate 268.01
Add for 2 percent extra 5.36
lift
Farm Work @12% 32.16
Overheads @ 20% 61.11
Contractor’s profit @ 36.66
10%
Rate per cum 403.31

500
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Say Rs. 403.30


(iii) For height above 10m
Unit = cum
a) Material
Cement t 0.404 4,900.00 1,979.60
Coarse Sand cum 0.45 300.00 135.00
20 mm aggregate cum 0.54 460.00 248.40
10 mm aggregate cum 0.36 480.00 172.80
b) Labour
Mate day 0.08 116.67 9.33
Mason (1st Class) day 0.12 211.17 25.34
Mazdoor (Unskilled) day 1.73 116.67 201.84
Bhisti day 0.27 116.67 31.50
c) Machinery
Concrete mixer 0.4/0.28 hour 0.40 200.00 80.00
cum capacity
d) Add for 4 percent 115.35
extra lift
e) Farmwork @ 15% on 449.87
(a+b+c)
f) Overheads @ 20% on 689.81
(a+b+c+d)
g) Contractor’s profit @ 413.88
10% on (a+b+c+d+e)
Rate per cum = a+b+c+d+e+f 4,552.73

Say Rs. 4,552.75


Labour Rate 268.01
Add for 4 percent extra 10.72
lift
Farm Work @15% 41.81
Overheads @ 20% 64.11
Contractor’s profit @ 38.47
10%
Rate per cum 423.12
Say Rs. 423.10
Note: 1 The cost of formwork has
been increased for more
height to account for cost of
side support to formwork.

501
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

2 Extra expenditure on
structures which are more
than 5 m height is to cater for
cost involved for approaching
the work spot by providing
ramp for use by labour.

Analysis of Rate
12.9 1000 Supplying, fitting and placing
HYSD bar reinforcement (Fe 415)
in substructrue complete as per
drawings and technical
specification Clauses 1002,
1005, 1010 & 1202
Unit = t
a) Material
HYSD bars including 5 per t 1.05 50,631.50 53,163.08
cent overlaps and wastage
Binding wire kg 6.00 70.00 420.00
b) Labour for cutting,
bending, shifting to site,
tying, and placing in
position

Mate day 0.34 116.67 39.67


Blacksmith day 2.00 148.17 296.34
Mazdoor (Unskilled) day 6.50 116.67 758.36
c) Overheads @ 20% on (a+b) 10,935.49

d) Contractor’s profit @ 10% 6,561.29


on (a+b+c)
Rate per t = a+b+c+d 72,174.22
Say Rs. 72,174.20
Labour Rate 1,094.36
Overheads @ 20% 218.87
Contractor’s profit @ 10% 131.32
Rate per t 1,444.56
Say Rs. 1,444.60
12.10 1000 Supplying, fitting and placing TMT
bar reinforcement (Fe 415) in
substructrue complete as per
drawings and technical
specification Clauses 1002, 1005,
1010 & 1202

502
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Unit = t
a) Material
TMT bars including 5 per t 1.05 50,639.46 53,171.43
cent overlaps and wastage
Binding wire kg 6.00 70.00 420.00
b) Labour for cutting, bending,
shifting to site, tying, and
placing in position

Mate day 0.34 175.00 59.50


Blacksmith day 2.00 224.00 448.00
Mazdoor (Unskilled) day 6.50 175.00 1,137.50
c) Overheads @ 20% on (a+b) 11,047.29
66,283.72
d) Contractor’s profit @ 10% on (a+b+c) except on steel 1,311.23
Rate per t = a+b+c+d 67,594.95
Say Rs. 67,594.95
Labour Rate 1,645.00
Overheads @ 20% 329.00
Contractor’s profit @ 10% 197.40
Rate per t 2,171.40
Say Rs. 1,444.60
12.11 1000 Supplying, fitting and placing
with MS bar reinforcement (Fe
415) in substructrue complete as
per drawings and technical
Unit = t
specification Clauses 1002,
a)
1005, Material
1010 & 1202
MS bars including 5 per cent t 1.05 43,000.00 45,150.00
overlaps and wastage
Binding wire kg 6.00 50.00 300.00
b) Labour for cutting,
bending, shifting to site,
tying, and placing in
position

Mate day 0.34 116.67 39.67


Blacksmith day 2.00 148.17 296.34
Mazdoor (Unskilled) day 6.50 116.67 758.36
c) Overheads @ 20% on (a+b) 9,308.87
d) Contractor’s profit @ 10% on 5,585.32
(a+b+c)
Rate per t = a+b+c+d 61,438.56

503
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Say Rs. 61,438.60


Labour Rate 1,094.36
Overheads @ 20% 218.87
Contractor’s profit @ 10% 131.32
Rate per t 1,444.56
Say Rs. 1,444.60
12.12 600 Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete
abutment, wing wall, return wall
with 100 mm dia AC pipe
extending through the full width
of the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing and
technical specification Clauses
614, 709, 1204.3.7

Unit = Nos
Taking output = 30 Nos
a) Material
AC pipe 100 mm dia m 31.50 120.00 3,780.00
including wastage @ 5 per
cent. Average length of
weep hole is taken as one
metre for the purpose of
estimating

MS clamps Nos. 30.00 15.00 450.00


Cement mortar 1:3 (For rate cum 0.05 2,933.00 146.65
refer to item 11.5 I)
b) Labour
Mate day 0.03 116.67 3.50
Mason 1st Class day 0.50 211.17 105.59
Mazdoor (Unskilled) day 0.25 116.67 29.17
c) Overheads @ 20% on (a+b) 902.98

d) Contractor’s profit @ 10% 541.79


on (a+b+c)
Cost for 30 Nos = (a+b+c+d) 5,959.67
Rate per No = (a+b+c+d)/30 198.66
Say Rs. 198.70
Labour Rate 138.25
Morter 1:3 5.95

504
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Overheads @ 20% 28.84


Contractor’s profit @ 10% 17.30
Cost for 30 Nos. 190.35
Rate per No. 6.34
Say Rs. 6.35

Analysis of Rate

12.13 600
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment,
wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures
with slop of 1(v):20(H) towards drawing face complete as per drawing and technical
specification clauses 614, 709, 1204.3.7
Unit = Nos.
Taking output = 30 Nos.
a) Material
PVC pipe 100 mm dia unloading m 31.50 250.00 7,875.00
wostofer@ 5percent
Cement morter 1:3 (for rate refer to cum 0.05 4,346.09 217.30
cement 11.5)
b) Labour
Mate day 0.03 210.00 6.30
Mason (1st Class) day 0.50 315.00 157.50
Mazdoor (Unskilled) day 0.25 210.00 52.50
8,308.60
c) Overheads @ 20% on (a+b) 1,661.72
d) Contractor’s profit @ 10% on (a+b+c) 997.03
Cost for 30Nos. = a+b+c+d 10,967.36
Rate for 1 No. 365.58
Add 1% labour cess 3.66
369.23
Say Rs. 264.25

Executive Engineer
Sarkaghat Division
HPPWD Sarkaghat

505
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Labour Rate 216.30


Labour CM 1:3 5.95
Overheads @ 20% 44.45
Contractor’s profit @ 10% 26.67
Cost for 30 Nos. 293.37
Rate per Nos. 9.78
Say Rs. 5.00
Analysis of Rate

12.14 1200 Backfilling behind abutment, wing wall and


return wall complete as per drawings &
technical specification Clause 1204.3.8

Unit = cum
Taking output = 10 cum
I) Granular material
a) Material
Granular material cum 12.00 405.68 4,868.16
b) Labour
Mate day 0.28 210.00 58.80
Mazdoor (Unskilled) day 10.00 210.00 2,100.00

Bhisti day 0.40 210.00 84.00


7,110.96
c) Overheads @ 20% on (a+b) 1,422.19

d) Contractor’s profit @ 10% on (a+b+c) 853.32

Cost for 10 cum of granular backfill = a+b+c+d 9,386.47


Rate per cum = (a+b+c+d)/10 938.65

506
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Add 1% labour cess 9.39


948.03
Say Rs. 948.05

Executive Engineer
Sarkaghat Division
HPPWD Sarkaghat

Labour Rate 2,242.80


Overheads @ 20% 448.56
Contractor’s profit @ 269.14
10%
Cost for 10 cum of granular 2,960.50
backfill
Rate per cum 296.05
Say Rs. 164.50
II) Sandy material
Unit = cum
Taking output = 10 cum
a) Material
Sand cum 12.00 300.00 3,600.00
b) Labour
Mate day 0.40 116.67 46.67
Mazdoor (Unskilled) day 10.00 116.67 1,166.70
Bhisti day 0.40 116.67 46.67
c) Overheads @ 20% on 972.01
(a+b)
d) Contractor’s profit @ 583.20
10% on (a+b+c)
Cost for 10 cum of sand 6,415.25
backfill = a+b+c+d
Rate per cum = (a+b+c+d)/10 641.52

Say Rs. 641.50


Labour Rate 1,260.04
Overheads @ 20% 252.01

507
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Contractor’s profit @ 151.20


10%
Cost for 10 cum of sand 1,663.25
backfill
Rate per cum 166.32
Say Rs. 166.30
12.15 1200 Providing and laying filter media
with granular crushed
aggregates as per specification
to a thickness of not less than
600 mm with smaller size
towards the soil and bigger size
towards the wall and providing
over the entire surface behind
abutment, wing wall, return wall
to the full height, compacted to
firm condition complete as per
drawing and technical
specification Clause 1204.3.8

Unit = cum
Taking output = 10 cum
a) Material
Filter media as per cum 12.00 250.00 3,000.00
specification
b) Labour
Mate day 0.40 116.67 46.67
Mazdoor (Unskilled) day 9.00 116.67 1,050.03
Mazdoor (Skilled) day 1.00 116.67 116.67
Bhisti day 0.50 116.67 58.34
c) Overheads @ 20% on (a+b) 854.34

d) Contractor’s profit @ 10% 512.60


on (a+b+c)
Cost for 10 cum of filter media = 5,638.65
a+b+c+d
Rate per cum = (a+b+c+d)/10 563.86
Say Rs. 563.90
Labour Rate 1,271.70
Overheads @ 20% 254.34
Contractor’s profit @ 10% 152.60
Cost for 10 cum of sand backfill 1,678.65

508
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Rate per cum 167.86


Say Rs. 167.90
12.16 1200 Supplying, fitting and fixing in
position true to line and level
elastomeric bearing conforming
to IRC:83 (Part-II) Section IX
complete, including all
accessories as per drawings and
technical specification Clause
1207.1

Unit = cubic centimetre


Considering an elastomeric
bearing of size 500 x 400 x 96 mm
for this analysis,
Overall volume = 19200 cu.cm
Volume of 6 Nos 488x388x4 mm
size reinforcing steel plates = 4545
cu.cm.
Hence volume of elastomer =
14655 cu. cm.
a) Labour
Mate day 0.06 116.67 7.00
Mazdoor (Unskilled) day 1.00 116.67 116.67
Mazdoor Skilled day 0.50 116.67 58.34
b) Material
Elastomeric bearing Nos. 1.00 50,000.00 50,000.00
assembly consisting of 7
internal layers of elastomer
bonded to 6 nos. internal
reinforcing steel laminates by
the process of vulcanisation,
complete with all components
as per drawing and technical
specification

Add for anchorage bolts if 501.82


required and consumables @
1 per cent on (a+b)
c) Overheads @ 30% on (a+b) 15,205.15

d) Contractor’s profit @ 10% 6,588.90


on (a+b+c)

509
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Cost for 19200 cu.cm. of 72,477.87


elastomeric bearing = a+b+c+d
Rate per cu.cm of elastomeric 3.77
bearing = (a+b+c+d)/19200
Say Rs. 3.80
Labour Rate 182.01
Overheads @ 30% 54.60
Contractor’s profit @ 10% 23.66
Cost for 19200 cu. Cm, of 260.27
elastomeric bearing
Rate per cu. cm 0.01
Say Rs. 0.01
Note: For such type of manufactured
item, the overhead cost is taken as
30 per cent instead of 20 per cent

12.17 600 Providing PCC M-20


architectural coping on the top
of wing wall, return wall etc.
complete as per drawing and
technical specification Clauses
615, 710 and 1204.3.11

Unit = Running m
Taking output = 1 m
Assume wall thickness = 345 mm
Projection of the coping will be
25 mm wide on both side of the
wall = 345 + 50 = 395 mm
Quantity = 1 x 0.395 x 0.150 =
0.059
PCC M-20 Grade (1:2:4) Nominal
Mix
As per item No. 12.8 (III)(i) cum 0.059 3,436.20 202.74
Add 10 per cent extra of cost of (a) 20.27
being architectural coping
Cost of 1 m = a 223.01
Say Rs. 223.00
Labour Rate cum 0.059 366.10 21.60
Add 10 per cent extra 2.16
Cost of 1 m 23.76
Say Rs. 23.80

510
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

12.18 1200 Providing pressure relief pipes


100 mm dia in bottom slab of
box cell on a filter media base of
500 mm x 500 mm as per
drawing and technical
specification Clause 1205.5.7

Unit = Nos
a) Material
AC pipe 100 mm dia i/c m 0.63 120.00 75.60
wastage of 5 per cent 600
mm long upto the bottom of
levelling course
Filter media base with stone cum 0.25 250.00 62.50
aggregate 0.5 m x 0.5 m area
1 m deep
b) Labour
Mate day 0.031 116.67 3.62
Mason 1st Class day 0.016 211.17 3.38
Mazdoor (Unskilled) day 0.80 116.67 93.34
c) Overheads @ 20% on (a+b) 47.69

d) Contractor’s profit @ 10% 28.61


on (a+b+c)
Rate per No = (a+b+c+d) 314.73
Say Rs. 314.75
Labour Rate 100.33
Overheads @ 20% 20.07
Contractor’s profit @ 10% 12.04
Rate per No 132.44
Say Rs. 132.45
12.19 600 Pointing with cement morter 1:3
on random rabble masonry as
per drawing and technical
specification clauses 613.3 and
1204

Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement morter 1:3 (for rate cum 0.03 2,933.00 87.99
refer to cement 11.5)
b) Labour
Mate day 0.04 116.67 4.67
Mason (1st Class) day 0.70 211.17 147.82

511
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Mazdoor (Unskilled) day 0.70 116.67 81.67


Bhisti day 0.20 116.67 23.33
c) Overheads @ 20% on (a+b) 69.10

d) Contractor’s profit @ 10% 41.46


on (a+b+c)
Cost for 10 sqm. 456.03
Say Rs. 456.05
Labour Rate 257.49
Labour CM 1:3 3.57
Overheads @ 20% 52.21
Contractor’s profit @ 10% 31.33
Cost for 10 sqm 344.60
Say Rs. 344.60
12.20 600 Pointing with cement morter 1:3
as coursed rubble masonry as
per drawing and technical
specification clauses 613.3 and
1204

Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement morter 1:3 (for rate cum 0.03 2,933.00 87.99
refer to cement 11.5)
b) Labour
Mate day 0.04 116.67 4.67
Mason (1st Class) day 0.60 211.17 126.70
Mazdoor (Unskilled) day 0.60 116.67 70.00
Bhisti day 0.20 116.67 23.33
c) Overheads @ 20% on (a+b) 62.54

d) Contractor’s profit @ 10% 37.52


on (a+b+c)
Cost for 10 sqm. 412.76
Say Rs. 412.80
Labour Rate 224.70
Labour CM 1:3 3.57
Overheads @ 20% 45.65
Contractor’s profit @ 10% 27.39
Cost for 10 sqm 301.32
Say Rs. 301.30

512
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

12.2 Add extra over items of


Reinforcement cement concrete
(beams /columns /slabs/tanks)
for supply and application of
synthetic fibre (polyester 12 mm
Recrorn 3 S or equivalent)
properly mixed with sand
/cement/aggregates including
casting of slabs (with dose of
125 gms per 50 kg of cement i.e.
0.25 per cent by weight of
cement or in a ratio as specified
by manufacturer's specification
or as directed by the Engineer-
in-Charge

Detail of cost for 1 cum


Material
Synthetic Polyester Fiber kg 0.90 308.00 277.20
Labour LS 1.00
Add for water charges @ 1.5% 4.17
Overhead @ 20% 56.47
Contractor's profit @ 10% 33.88
Cost per cum 372.73
Say Rs. 372.75
12.2 Add extra over items of cement
plaster for supply and
application of synthetic fibre
(polyester 6 mm Recron 3 S or
equivalent) properly mixed with
sand /cement mortar
manually /machine and finished
on plaster (with dose of 125 gms
per 50 kg of cement i.e. 0.25 per
cent by weight of cement or in a
ratio as specified by
manufacturer's specification or
as directed by the Engineer-in-
Charge)

Detail of cost for 10 sqm


Taking output = 10 sqm
Material
Synthetic Polyester Fiber kg 0.14 308.00 43.12
Labour LS 1.00
Add for water charges @ 1.5% 0.66

513
Reference to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specificatio (Rs.) (Rs.)
ns

Overhead @ 20% 8.96


Contractor's profit @ 10% 5.37
Cost per cum 59.11
Say Rs. 59.10

514