RATE OF MATERIALS USED IN MAKING P.C.C

Rate Analysis of PCC : (Plain Cement Concrete)

Rate Analysis of PCC


(Plain Cement Concrete)
     This is used at below any foundation to make a clean and level
surface for easy to work, away from sand, dust, mud, etc. This is the
temporary structure created to ease your work. PCC is not a
Structural Member which can bear any load or pressure. But this
plays a very important role when foundation work is going on. PCC
will help to keep it as per measurement and as per design.

Sometimes the natural ground has too much uneven surface, in those
situations, there is doing Plum concrete. That means 60% of Natural
Hard Stone and 40% of Plain Cement concrete will fill with doing
some shuttering work to control Size. This will help to create a plain
Surface to ease the work.

General Use of Plain Cement Concrete (PCC)


1. Below Footing
2. Below Raft
3. Below Concrete Road
4. Below Grade Slab
5. Below Box type Waterproofing
6. At Labour Camp
7. Work Station of Labour Like Steelyard, Cutting yard, etc.
8. In Godown or Store Room.
9. In Site office.
10. In Plum Concrete at uneven Surface.

In above location, PCC can be done at Normally to work easily.


but What about Plum Concrete Work. Plum Concrete is used at Uneven
surfaces to Fill it by Plum Concrete of 60% of Rubble and 40% of Plain
Cement Concrete.
Here we have given some example of Rate analysis of Plum Concrete and
Plain Cement concrete (PCC).

Rate Considered: (All Rate is Basic Rate Taxes and Transportation to


consider extra)
Cement: Rs. 265.00/Bag
Crush Sand: Rs. 1095.00/cum i.e. Rs. 3100/Brass
Course Aggregate 10mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Course Aggregate 20mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Fly Ash: Rs. 2.00/Kg
Admixture: Rs. 48/Liter up to M25 or Rs. 66/Liter above M30
Labour: Rs. 805/Cum
Extra Overheads: Rs.950/Cum (This cost considered Including
Transportation, Shifting, Water Electricity, Housekeeping, PF/ESIC.Etc.)

 In General Condition Lot of builders and Subcontractors are sublating this
work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang
Who can do it on PCC Rs. 6.00/ Sqft and Plum Concrete in 8.50 to 9.00
Rs. Per Cuft that is 300 Per Cum

PLUM CONCRETE (60:40)Ratio


Quantity : 1.00 Cum

Material Labour

Material Un Const Rate Amoun Total Labour Un Quan Rate Amoun Total
it ant t Amo it tity t Amount
unt
Cement Ba 1.15        2      1311. Labour Cu 1.00 450.          
gs 65 305.70 50 work m 00 450.00 981.60 
for
RCC

Crush Cu 0.20     1,0      Materia 0.5%       6.56


Sand m 95  216.68 l
handlin
g
charge
s

Course Cu 0.10        9       Overhe Cu 1.00  525. 525.00 


Aggregat m 53 99.08 ads m  00 
e 10- 12
mm

Course Cu 0.25        9    


Aggregat m 53 236.12
e 20 -25
mm

Fly ash Kg 33.60                   


 2 50.40 

Rubble  Cu 0.60        403.54


m 673

TOTAL RATE: Rs. 2293.10/Cum Say Rs.2294.00/Cum


(Shuttering Cost is Extra)

Rate And Material Analysis of PCC: Plain Cement


Concrete

 PCC 05 (1:4:8)
Quantity: 1.00 Cum

Material Labour

Materi Un Const Rate Amount Total Labour Un Quan Rate Amoun Total
al it ant Amo it tity t Amount
unt

Cemen Ba 2.06                 545 2208. Labour Cu 1.00 805.0         80          1,7
t gs 265 .90 51 work for m 847 5.08 66.1
RCC

Crush Cu 0.67     1,         729 Material 0.5%           1


Sand m 095 .82 handlin 1.04
g
charges

Course Cu 0.31                 297  Overhe Cu 1.00  950.0 950.00 


Aggreg m 953 .74 ads m  0 
ate 10-
12 mm

Aggreg Cu 0.47                 451


ate 20 m 953 .44
-25
mm

Fly ash Kg 84.00                   126


  2 .00 

Admixt Kg 1.20                     57


ure up 48 .60
to M30

Cost is Extra)

 PCC M10 (1:3:6)


Quantity: 1.00 Cum

Material Labour

Materia Uni Consta Rate Amount Total Labour Uni Quanti Rate Amount Total
l t nt Amou t ty Amoun
nt

Cement Ba 2.88        2         764. 2327. Labour Cu 1.00 805.08         805.          1,
gs 65 26 54 work for m 47 08 6.7
RCC

Crush Cu 0.49     1,0         541. Material 0.5%           11.


Sand m 95 70 handling 64
charges

Course Cu 0.26        9         247.  Overhea Cu 1.00  950.00  950.00 


Aggreg m 53 69 ds m 
ate 10-
12 mm

Course Cu 0.62        9         590.


Aggreg m 53 29
ate 20
-25 mm

Fly ash Kg 84.00                     126.


2 00

Admixtu Kg 1.20                     57.


re up to
M30 48 60

TOTAL RATE: 4094.30 Say Rs. 4095.00/Cum


 (Shuttering Cost is Extra)
PCC M15 (1:2:4)
Quantity : 1.00Cum

Material Labour

Material Uni Consta Rate Amount Total Labour Uni Quanti Rate Amount Total
t nt Amou t ty Amoun
nt

Cement Bag 4.94        2      1,310. 2967.2 Labour Cu 1.00 805.08         805.          1
s 65 16  4 work for m 47 08 9.9
RCC

Crush Cu 0.58     1,0         631. Material 0.5%           14.


Sand m 95 73 handling 84
charges

Course Cu 0.34        9         325. Overhea Cu 1.00  950.00  950.00 


Aggrega m 53 98 ds m 
te 10-
12 mm

Course Cu 0.56        9         531.


Aggrega m 53 52
te 20
-25 mm

Fly ash Kg 73.50                     110.


2 25

Admixtu Kg 1.20                     57.


re up to 48 60
M30

TOTAL RATE: 4737.20 Say Rs. 4740.00/Cum


(Shuttering Cost is Extra)

In above analysis, We have Considered the Material Density as Follows.


1. Cruah Sand : 1600 Kg/Cum
2. 10mm Metal : 1560Kg/Cum
3. 20mm Metal: 1550kg/Cum

All the Details are given in mix design report which is prepared for your site
and the mix design depends on quarry material. Material Density can be
changed as per Quarry location and Material quality, as well as Cement
content, can be changed as per quarry Material quality.

Generally A lot of Builders, contractors are using thumb rule when doing
PCC work.
 General The market rate of PCC work.
PCC with Material: Rs. 3500-4000/Cum
PCC only Labour: Rs.400/Cum
100 to 150mm thick PCC only Labour: Rs.6.00/Sqft
Plum Concrete Only Labour: Rs.8.50-9.00/Cuft That is 300/Cum
Cement Bag: Rs.50- 60/Bag.
Shuttering With Material: Rs.450-550/ Sqm 

All above Rates is current market rate and analysis are considered as per
Mix design report. Which is Change as per the location and Mix Design
Report, 
you can refer the format and can try preparing your site analysis as per
your site mix design