Presented by:
Factory, Warehouse & Service Blocks
For Hexxa Flexible Packing LLC
Project No: DXB/566-OI
TABLE OF CONTENTS
TENDER OPENING...........................................................................................................................
1.2.1 Introduction........................................................................................................................- 2 -
2.1.1 Summary:...........................................................................................................................- 3 -
3.1 CONCLUSION......................................................................................................................- 46 -
3.2 RECOMMENDATION........................................................................................................- 48 -
Bidders Remarks
1.2.1 Introduction
Number of Invitations sent: 14
Number of Bids Received: 12
1,876.5
1 Asian Building Contracting 11,774,482.43 8 Months + 1 Month 5
2,239.4
2 City Night Contracting 14,051,248.00 8 Months + 1 Month 0
2,290.6
3 RAQ Contracting 14,372,942.00 8 Months + 1 Month 7
2,316.3
4 Oasis Tech Contracting 14,534,046.00 15 Months + 1 Month 5
2,350.7
5 Al Musallas Building Contracting 14,750,000.00 8 Months + 1 Month 7
2,390.6
6 Emirates Heavy Engineering 15,000,000.00 8 Months + 1 Month 1
2,446.9
7 Electron Electromechanical 15,353,530.00 15 Months + 1 Month 5
2.1.1 Summary:
- All other bills reacted with small scale of differences from Quoted prices of each Bill. Rates,
quantities and prices should be affiliated for 2 decimal digits.
- Amended BOQ Pages are not replaced for Bill No .16 and BOQ Page No. 8.7 in Tender quote.
- Amended BOQ Page is not replaced for BOQ Page No. 16B.1 in Tender quote.
The bidder has excluded some items in this Bill. Those are to be included in the bidder’s
scope of Works.
The Bidder excluded item A.15 and G.9 are to be included in Bidder’s price.
2.5.1 GENERAL
3. Material value- 80% of the Contractor’s substantiated value of the Material will be certified,
only items which are stated in Appendix to Tender.
6. Filling & Compaction are to be considered as per the tender documents and Amendments
issued.
7. There is no separate price stated and it’s required to price each items to compare Like to Like
basis and also for billing
8. All external works including compound wall & Chain Link fencing are to be included in the
offer.
9. Interlocking tiles for site access including obtaining RTA permission to be included in
Contractor’s scope of works.
10. Glazing & Doors in the offices area are included in Office Interior Fit-out works listed in
Provisional sum items.
2. Construction duration shall be from Building Permit to Completion as site fencing is already
available.
5. All external works including compound wall are to be included in the offer.
7. Colour of Cladding & External panel to be strictly considered as per elevation / 3D view unless
obtaining the approval from the engineer/ Architect.
8. 1 hour Fire protection for Intumescent paint should be included in the Main Contractor’s scope.
No Duration changes accepted.
1. All external works including compound wall are to be included in the offer.
2. Interlocking tiles for site access including obtaining RTA permission to be included in
Contractor’s scope of works.
4. 1 hour Fire protection for Intumescent paint should be included in the Main Contractor’s
scope. No Duration changes accepted.
6. Offer shall include works shown in Tender documents. Items shall be considered as included
unless clearly excluded in BOQ/offer letter.
2. Materials for Civil & MEP works shall be as per Tender Documents. (Make List).
7. Pump room, Water tank, holding tanks and Acid tanks are to be considered as Tender
Documents.
8. Materials for Civil & MEP works shall be as per Tender Documents. (Make List).
10. Interlocking tiles, thickness, base and area as per Tender Documents.
1. LED Lights
3.1 CONCLUSION
The Tender Analysis Report is highlighting the features as below:
Price of Items
Project Duration
The prices of Bidders are in range of AED 85-107.85 million. The difference between least two
bidders is around AED 7 million whereas the highest AED 1.75 million. We have observed
discrepancies on quantities and rates, which lead to considerable differences in Bills.
The Bidders quoted Lump sum for some Bills particularly Preliminaries and MEP Bills.
The above points developed barrier to analyze the items in Like to Like basis. These discrepancies
may change the positioning of the Bidders in the tender race!! However, this is expected in the
Lump Sum contracts!
There are variations, discrepancies and conditions that need to negotiate with the Bidders as
recommended hereinafter!
Price of Items
1. Quantities
Comment: Huge differences are noticed in quantities in all Bids & those have to be clarified to
bring them in to a common ground.
2. Rates
Comment: Huge differences are noticed in rates in all Bids & those have to be clarified to bring
them in to a common ground.
3. Overall price
Comment: Most of the bidders are in the range whereas the least bidder falls on huge variance
his price.
Project Duration
4. Duration
Tender Duration: 10 Months+ 15 Days mobilization
6. Guarantee
Comment: Bank Guarantees are required for Advance Payment & Performance bond. It’s
recommended to proceed with Bank guarantees.
7. Payment Terms
Comment: Payment Terms are as per Tender documents & FIDIC 1999
Conditions of Contract.
3.2 RECOMMENDATION
Based on the above study and conclusion we recommend to negotiate with each Bidders and bring
them to a common ground that enable us comparing the prices on apple to apple basis and to enter
into a fair and final price & duration..
The following essential steps are to be taken to achieve the above goal:
a. Instruct the Bidders to submit their clarification to the bid by replying to a list of questions
and notes as observed in the tender offer.
d. Conduct final negotiation session with each contractor in the presence of the client.