You are on page 1of 384

BILL OF QUANTITIES

LA PORTO MIXED USE DEVELOPMENT PROJECT


GENERAL BASEMENT
JEDDAH, SAUDI ARABIA
MARCH 2024

Buruoj Engineering Consultant


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT JEDDAH, KSA


OWNER : AL AKARIA
BUILDING : GENERAL BASEMENT

GENERAL SUMMARY

A. MAIN BUILDINGS SR. 97,334,914.00


B. SCHEDULE OF BOQ ADJUSTMENT SR. ….......................................
C. OTHERS SR. ….......................................

TOTAL BID AMOUNT SR. 97,334,914.00

AMOUNT IN WORDS:

Contract Duration Months

Important Notes:
Bid as per the Tender BOQ. Discrepancies in the BOQ or Scope of Works shall be listed
1 separately in the attached sheet "BOQ Adjustment" (not to be inserted anywhere in the
BOQ, unless otherwise instructed).

Addendum / Amendments issued during the bidding period shall be considered as


2 separate item and shall be listed on separate BOQ format sheet, unless otherwise
instructed.

3 List all Exclusion / Inclusion on separate BOQ format sheet.

4 Attach the list of all Proposed Material / Supplier / Sub Contractor, (if any).

5 Mention the material budget prices along with the BOQ description only.

Submit the priced BOQ in hard and soft copy. The hard copy should be fully binded
6
properly and duly signed and signature.

Change Order is appllicable either for the modifications in the design drawings or change
7
of material/specifications by the Owner/Engineer only.

Contractor
Date:
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA BOQ SUMMARY

SUMMARY - GENERAL BASEMENT

Division Description Amount (SR)

Div-1 General Requirments -

Div-2 Existing Conditions 742,700.00

Div-3 Concrete Works 51,929,100.00

Div-4 Masonary Works 237,900.00

Div-5 Metal Works 50,400.00

Div-7 Thermal & Moisture Protection Works 2,731,135.00

Div-8 Doors & Windows Works 658,410.00

Div-9 Finishes Works 7,437,351.00

Div-10 Specialties 366,000.00

Div-14 Conveying Systems

Div-21 Fire Fighting Systems 5,063,175.00

Div-22 Plumbing Works 6,078,955.00

Div-23 Mechanical Works (HVAC) 5,771,548.00

Div-26 Electrical Works 3,509,890.00

Div-27 Communication 1,712,500.00

Div-28 Electronic Safety & Security 1,494,230.00

Div-31 Earthworks 8,829,620.00

Div-32 Exterior Improvements 722,000.00

746413405.xlsx/SUMMARY All/Page3
CARRIED TO GENERAL SUMMARY 97,334,914.00

746413405.xlsx/SUMMARY All/Page4
BUILDING : GENERAL GROUND FLOOR GENARAL BASEMENT BUILDING : OFFICE

20,793,720.00 16,684,730.00

159,695.00 2,943,980.00

1,267,580.00 1,013,924.50

162,150.00 14,089,398.65

1,011,990.00 7,437,351.00 1,142,355.00

433,410.00 366,000.00 359,700.00

500,000.00 1,200,000.00

351,940.00 5,771,548.00 13,453,630.00

41,406,120.00 722,000.00

746413405.xlsx/SUMMARY All/Page5
BUILDING : HOTEL CINEMA BUILDING : RETAIL BUILDING : RETAIL

4,865,590.00 4,941,580.00 4,534,850.00 4,501,450.00

4,178,295.00 940,430.00 600,500.00 563,215.00

2,115,901.00 1,030,000.00 538,946.00 372,298.00

12,917,087.53 1,041,436.50 1,396,177.70 1,318,217.80

821,475.00 193,595.00 265,420.00 250,050.00

209,480.00 666,200.00 1,237,940.00 1,216,890.00

1,440,000.00 450,000.00 1,080,000.00 1,160,000.00

4,761,310.00 5,382,855.00 4,752,960.00

746413405.xlsx/SUMMARY All/Page6
BUILDING : LEISU Total Amount

4,858,080.00 113,109,100.00

406,115.00 10,030,130.00

1,066,850.00 7,455,899.50

1,026,222.00 32,609,100.18

68,880.00 11,191,116.00

705,680.00 5,195,300.00

480,000.00 6,310,000.00

5,038,450.00 39,512,693.00

42,128,120.00

746413405.xlsx/SUMMARY All/Page7
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

01 00 00 - GENERAL REQUIREMENTS

01-1 GENERAL PREAMBLES

This Tender and the related Scope of


Works shall be in accordance with the
Tender Documents constitutes the
Excavation Package and all associated
01-1-1 Item 1 -
Works which entails the Construction of
La-Porto Mixed Use Devlopment Project,
King Abdul-Aziz Road, Al-Nahadah
District, Jeddah, KSA

The Tenderer is advised that the intent of


the Employer is that the project will be an
exemplary in every respect in particular
characterized by the very highest
design, construction and project
delivery standards in the industry. It is
therefore incumbent upon the construction
teams engaged to deliver this project to
01-1-2 Item 1 -
undertake their various duties in a
controlled, professional and innovative
manner exhibiting the highest level of team
integration, professionalism and
collaboration. The Employer visualises that
the successful Tenderer will be a prominent
team member expected to work in a team
spirited manner.

The Tenderer's attention is to drawn to the


Employer's requirement to provide
sufficient resources to complete the Works
as set down in the indicative programme
provided with his tender (for illustrative
purposes only but in line, or improved, with
the required execution requirements
detailed in these Tender Documents).
Tenderers will be assessed on both cost
01-1-3 and programme and the Tenderer is Item 1 -
therefore required to submit its own
installation programme together with a
schedule of plant and labour resources to
be supplied by it upon which the
programme and tender price has been
based. These submissions, if approved
by the Engineer, will be deemed to form
the basis upon which the works are to be
constructed.

TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page8
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

The Tenderer shall provide detailed method


statements for the construction of all
aspects of the tendered Works and indicate
the time required to complete and submit
01-1-4 Item 1 -
design drawings for the Contractor Design
works to the Engineer and for the required
Municipality approvals, following
acceptance of the Tender.

Allow for all provisions for all Contractual


01-1-5 Item 1 -
requirements.

The Tenderer is advised that the Employer


is receptive to any innovation in
01-1-6 Item 1 -
construction methodology that will reduce
construction times and save cost.

The Tenderer is advised to inspect the


condition of the site and the position of
all services to be diverted and those to
be retained and protected from and
during the progress of the Works and
01-1-7 make due provision thereof. The Item 1 -
Tenderer is to make particular enquiries
with regard to access and egress from
the site during construction and for any
temporary arrangements required in
connection with such access or egress.

The intent will be for the site to work


standards hours as prescribed or
permitted by the Labour Law of KSA
although the Tenderer should undertake its
own enquiries with regard to any
01-1-8 Item 1 -
restrictions likely to be imposed by the
Local Authorities and make due allowance
in the tender. The Tenderer is responsible
for complying with all legislation concerning
the permitted hours for workmen.

TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page9
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

The Employer emhasizes great concern


regarding the quality management,
organisation and safety on the project
and the Tenderer will be expected to
provide a suitable and approved
management structure able to manage,
01-1-9 Item 1 -
plan,communicate, and report to the
Project Manager and Engineer in a
professional and comprehensive
manner.The Tenderer should make due
allowance in the tender for meeting these
requirements.

The Bills of Quantities herein, including all


notes and instructions, form an integral part
of the Tender Documents. However, the
descriptions contained in the Bills of
Quantities for each item are not
necessarily complete. The Tenderer is
01-1-10 referred to the Conditions of Contract and Item 1 -
Appendices, Tender Specifications and
Tender Drawings as well as relevant
Standards and Codes of Practice for further
information, as no claim or variation will be
considered on account of the Tenderers
failure to do so.

The Tenderer is cautioned to familiarise


himself with all documents comprising the
Tender including the Tender Drawings and
Tender Specifications (or any other
information that can be reasonably inferred
01-1-11 Item 1 -
from any of them) and all obligations
contained in the Tender shall be included in
the Tender price, even if specific items
relating to them are not listed in these
Bills of Quantities.

746413405.xlsx/Div-1/Page10
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

GENERAL REQUIREMENT (CONT'D)

The Tenderers unit rates are to be the fully


inclusive value of the work described and
must include all related work, accessory or
consumable materials, incidental
labour,supervision, administration, tools,
construction equipment,overhead and profit
and all costs and expenses which may be
required in and for the completion of the
work described,together with all costs and
expenses in complying with all general
01-1-12 Item 1 -
risks, liabilities and obligations set forth or
implied in the Tender. The unit rates are
also to include for workinging on existing
ground conditions . No claim for
additional costs will be entertained
resulting from the conditions of the
existing ground and site and any
difficulty that may be encountered by
the Tenderer in executing his works as a
result of the around/site conditions.

Tender Drawings, Tender Specifications


and Bills of Quantities and all other Tender
01-1-13 Documents are complementary and if any Item 1 -
item is included in any of them, it shall be
deemed included in all.

The provisions of the Tender and


accompanying appendices shall prevail
over those of any other documents forming
part of the Tender Documents. Subject to
the foregoing, should an item be included
01-1-14 Item 1 -
or implied in any ofthe Tender Documents,
then it shall be considered as necessary for
the proper execution of the Tender Works
and deemed to be included in the Tender
sum.

The Tenderers bid for the entire Tender


works shall provide for supervision of any
or all trades not intended to be performed
01-1-15 Item 1 -
with his own forces. No extra
compensation for services as a General
Contractor will be paid.

746413405.xlsx/Div-1/Page11
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page12
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

The Works shall be remeasured, and will


be subject to adjustment as a result of
01-1-16 measured quantities in the scope of Work Item 1 -
in Contract Drawings and/or Contract
Specifications.

The Tenderer is required to check the


numbers of the pages of the Bills of
Quantities and should any be found
missing or in duplicate or the figures or
writing indistinct, the Tenderer must notify
Engineer at once and have the matter
01-1-17 Item 1 -
rectified before the Tender is submitted. No
liability whatsoever will be entertained
in respect of any claim for error in the
Tenderers Tender submission resulting
from failures to comply with the
foregoing.

The Tenderer should allow against the


items or in the prices for everything
01-1-18 Item 1 -
contained in these Bills of Quantities which
has a monetary value.

Comply with all requirements of Local


Authorities with regard to height and
01-1-19 Item 1 -
lighting requirementsof the works, either
temporary or permanent.

Comply with all requirements of Local Civil


01-1-20 Defence Authorities with regard to provision Item 1 -
of fire detection and suppression systems.

Liaise with Civil Defence Authorities


Personnel and obtain Civil Defence
01-1-21 Item 1 -
Approval certification at the completion of
the works.

Allow for examination of completed works


01-1-22 Item 1 -
by others.

Allow for complying with all regulatory


01-1-23 Item 1 -
requirements as per Specifications.

746413405.xlsx/Div-1/Page13
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

GENERAL REQUIREMENT (CONT'D)

Allow for all costs associated with the


01-1-24 requirements of Specification Codes and Item 1 -
Reference Standards

A price or rate shall be entered by the


Tenderer against each item in these Bills of
Quantities whether quantities are stated or
01-1-25 not. Items against which no price or rate is Item 1 -
entered will be considered as covered by
other prices or rates in the Bills of
Quantities.

Items in the Preambles Section of these


Bills of Quantities are deemed to qualify
01-1-26 and to form part of every description of Item 1 -
measured work to which they refer
including composite descriptions.

Amendments shall not be made to these


Bills of Quantities. Any such amendments
found, either before or after acceptance of
the Tender shall have no contractual
01-1-27 Item 1 -
bearing whatsoever and the original texts
shall prevail always. The Tenderer if
noticed any missing items shall insert in the
stipulated location.

Unit rates may be used reciprocally in the


settlement of accounts unless conflict
between them occurs. TheTenderer is,
01-1-28 therefore, to ensure that identical item Item 1 -
occurring in separate Bills are not priced at
different ratesunless this is his deliberate
intention.

These Bills of Quantities have been


measured generally inaccordance with the
Rules of POM(l) (as here below defined). In
01-1-29 any case in the Bill of Quantities where the Item 1 -
methods differ, then the method expressed
must be accepted and measured in
accordance therewith.

746413405.xlsx/Div-1/Page14
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page15
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

The Tenderer shall not use these Bills of


Quantities as a construction programme
nor for the purpose of ordering materials or
01-1-30 arranging sub-contracts. The references for Item 1 -
these activities shall be the Tender
Drawings, Tender Specifications and
instructions issued by Engineer.

Any error in description or in quantity or


in omission of items from the Bills of
Quantities shall not vitiate thisTender
nor release the Tenderer from the
execution of the whole or any part of the
Tender Works comprised there
01-1-31 Item 1 -
inaccording to the Tender Drawings and
TenderSpecifications or from any of his
obligations or liabilities disabled under the
Tender. Any error in or omissions from the
Bills of Quantities shall not be corrected by
a Variation issued by Engineer.

Format of Description

In addition to common abbreviations, the


following have been adopted.

POMl - PRINCIPLES OF
MEASUREMENTS(INTERNATIONAL)
FOR WORKS OF CONSTRUCTION dated
June 1979 and published by the Royal
Institution of Chartered Surveyors, London.

Item - Item
M - Metre
M2 - Square metre
M3 - Cubic metre
No - Number
LS - Lump Sum
kg - Kilogram

746413405.xlsx/Div-1/Page16
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

GENERAL REQUIREMENT (CONT'D)

01-2 DEFINITION

Prices also to include

Rates shall be comprehensive and


include for, but not be limited to, the
following matters:

01-2-1 All obligations imposed by the Tender. Item 1 -

All costs in connection with Supervision,


01-2-2 Co-ordination,Quality Assurance and Item 1 -
Quality Control of the WORKS.

Complying in every respect with the


01-2-3 Item 1 -
requirements of the Tender.

01-2-4 Labour for fixing and all associated costs. Item 1 -

All safety measures in association with the


01-2-5 Item 1 -
Tender Works

Materials and goods and all associated


01-2-6 Item 1 -
costs.

01-2-7 Warranties (if not given as separate item). Item 1 -

Fitting and/or fixing materials and goods in


01-2-8 Item 1 -
position hoisting to any height.

Use of scaffolding, plant, equipment and


01-2-9 Item 1 -
tools.

Any additional Iabours usually associated


01-2-10 Item 1 -
with measured items.

All costs associated with Government


Agencies for consumption of water, energy
01-2-11 Item 1 -
etc. including charges relatedto testing and
commissioning.

All obligations of the tender documents


01-2-12 forming part of this tender, whether Item 1 -
measured in these Bills of Quantities.

746413405.xlsx/Div-1/Page17
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION -

GENERAL REQUIREMENT (CONT'D)

Preparation and submission of shop


01-2-13 drawings as required by the Tender Item 1 -
Specification and Scope of Works.

Preparation and submission of AS-BUILT


01-2-14 drawings as required by the Specification Item 1 -
and Scope of Works.

Pricing Preambles and Tender


Specifications shall apply reciprocally
01-2-15 Item 1 -
between sections of the Works unless
otherwise described.

Materials shall be of the quality specified


01-2-16 Item 1 -
unless otherwise directed by the Engineer.

All materials shall be transported, handled,


stored and fixed in accordance with the
01-2-17 Item 1 -
printed instructions or recommendations of
their manufacturers, or suppliers.

Protection of completed work, all casings


and temporary coverings and making good,
01-2-18 Item 1 -
clearing and polishing andclearing away
upon completion.

Where the word “allow" is used, the cost of


01-2-19 theitems shall be the responsibility of the Item 1 -
Tenderer.

The amounts set against any items of profit


shall indude for all costs in connection with
01-2-20 letters of credit,bank charges, interest Item 1 -
charges and insurance after thematerials
come under the control of the Tenderer.

01-3 CONDITIONS OF CONTRACT

01-3-1 Allow for Contractual provisions Item 1 -

746413405.xlsx/Div-1/Page18
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page19
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

NON-RECURRING PRILIMINARY COSTS


01-4
(MOBILISATION)

Incurred at the Commencement of the


Tender Works

Allow for costs associated with for obtaining


all required NOCs, (No Objection
01-4-1 Certificates), and approvals for the design Item 1 -
drawings from the applicable government
departments.

Allow for establishment of site office (pre-


engineered portacabin) and fascilities
01-4-2 including but not limited to office furniture, Item 1 -
computers and software and other office
equipments

Provision of storage sheds and other such


01-4-3 facilities required by the Contractor during Item 1 -
the execution of the works

Provision of security room as per drawing


01-4-4 Item 1 -
and specification.

Provision of Project Signboard with secure


01-4-5 bollard system as per specifications and Item 1 -
Drawings.

Provision of all safety requirements for


01-4-6 Item 1 -
the works, to the approval of Engineer

Provision of a Performance Bank


01-4-7 Guarantee in accordancewith the Tender Item 1 -
Documents

Provision of all necessary Insurances and


01-4-8 Third Party Liabilities in accordance with Item 1 -
the Tender Documents

Allow for provision of Enginner's


01-4-9 Item 1 -
Professional indemnity insurance.

746413405.xlsx/Div-1/Page20
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

GENERAL REQUIREMENT (CONT'D)

Allow for all connections to utilities (if


required) for the above temporary services
01-4-10 Item 1 -
including payment of all associated fees as
per specifications .

Connection and provision of all necessary


01-4-11 Item 1 -
site power as per specification .

Connection and provision of all necessary


01-4-12 Temporary Water Supplies as per Item 1 -
specification.

Connection and provision of all necessary


Temporary Sanitary Facilities and
01-4-13 Item 1 -
associated drainage/disposal as per
specification.

Establishment of fire protection strategy as


required by Local Authorities, and to ensure
01-4-14 that the project is safeguarded during Item 1 -
construction to approval of Engineerand as
per specifications .

Allow for all connections to utilities (if


required) for the above temporary services
01-4-15 Item 1 -
including payment of allassociated fees as
per specification .

Access roads and walkways as per


01-4-16 Item 1 -
specification.

The Tenderer shall allow for all other


obligations in accordance with the Tender
not included under this section of non-
recurring Preliminary Costs at the
01-4-17 commencement of the Tender works. The Item 1 -
Tenderer shall detail below any such
obligations together with the Tender,
volume, sectionand clause reference as
applicable.

RECURRING PRILIMINARY COSTS


01-5 INCURRED DURING THE EXECUTION
OF THE TENDER WORKS
The Contractor's running cost of the site
01-5-1 in accordance with the terms of the Month 1 -
Contract.
01-5-2 Running cost of Site offcies Month 1 -

746413405.xlsx/Div-1/Page21
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

746413405.xlsx/Div-1/Page22
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)

GENERAL REQUIREMENT (CONT'D)

NON-RECURRING PRILIMINARY COSTS


01-6 (DEMOBILISATION) INCURRED AT THE
COMPLETION OF THE TENDER WORKS

Demobilisation and removal of all


temporary site offices, security room,
Item 1 -
sheds and equipment as per
specifications.

Demobilisation and removal of all plant and


01-6-1 equipment, removal of temporary site Item 1 -
power as per specifications.

Removal of temporary site lighting as per


01-6-2 Item 1 -
specifications.

Removal of temporary Water Supplies as


01-6-3 Item 1 -
per specifications.

Removal of temporary Sanitary Facilities


01-6-4 and associated drainage/disposal as per Item 1 -
specifications.

Removal of temporary fire protection


01-6-5 Item 1 -
installations as per specifications.

Allow for the provision of all project record


01-6-6 Item 1 -
drawings as detailed in specifications.

01-7 ANY OTHER ITEMS

The Tenderer shall include here any


addition items with quantities, enumerated
or itemized and rates which are not
previously included to complete the build
up of lump sum price.

Should the Tenderer fail to inset any items


here, it will be deemed that his lump sum
price for the Tenders includes all items,
whether or not specifically shown on the
Drawings and described in the
Specification to represent theentire cost of
the Works and no subsequent claim for any
additional item will be entertained.
a.

b.

c.

746413405.xlsx/Div-1/Page23
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION -

COLLECTIONS:

DIVISION 01 : 1 / 12 -

DIVISION 01 : 2 / 12 -

DIVISION 01 : 3 / 12 -

DIVISION 01 : 4 / 12 -

DIVISION 01 : 5 / 12 -

DIVISION 01 : 6 / 12 -

DIVISION 01 : 7 / 12 -

DIVISION 01 : 8 / 12 -

DIVISION 01 : 9 / 12 -

DIVISION 01 : 10 / 12 -

DIVISION 01 : 11 / 12 -

DIVISION 01 : 12 / 12 -

746413405.xlsx/Div-1/Page24
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA GENERAL REQUIREMENT
BUILDING : GENERAL BASEMENT DIVISION 01

No. Description Unit Qty Price Amount (SR)


TOTAL TO SUMMARY -

746413405.xlsx/Div-1/Page25
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXISTING CONDITIONS
BUILDING : GENERAL BASEMENT DIVISION 02

No. Description Unit Qty Price Amount (SR)

SECTION 02 41 00 - DEMOLITION

02-1 DEMOLITION OF EXISTING BUILDING

Demoilsh & Dispose the demoilshed materials 476,000.00


02-1 of the existing Building from the site M² 1,360 350.00

02-2 DEMOLITION OF EXISTING FENCE

Demoilsh & Dispose the demoilshed materials 266,700.00


02-2-1 of the existing Fence from the site LM 889 300.00

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 2/Page26
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXISTING CONDITIONS
BUILDING : GENERAL BASEMENT DIVISION 02

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 742,700.00

COLLECTIONS:

DIVISION 02 : 1 / 1 742,700.00

746413405.xlsx/Div- 2/Page27
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXISTING CONDITIONS
BUILDING : GENERAL BASEMENT DIVISION 02

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 742,700.00

746413405.xlsx/Div- 2/Page28
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUBSTRUCTURE

Plain cast in-situ-concrete 75mm thick plain


concrete under foundation with cement
type according to the recommendation of 2021 = completed
Geotechnical report, minimum 28 days Projec class20/20
cylinder compressive strength Fc' = 20 Concrete Unit rate /m3"
03-1-1 M³ 4,000 600.00 2,400,000.00
Mpa.The work shall include soil 450 & allow 33% as
compaction,concrete casting and curing for increase in unit rate :
concrete and all required equipment and 450+ .33*450 = 600/m3
material for finish the work according to
drawings and specifications.

TOTAL CARRIED TO COLLECTION 2,400,000.00

CONCRETE WORKS (CONT'D)

Screed Works

Cast-In-Place Screed as per drawings &


specifications.

2021 = completed
Project Screed Unit rate
Slopped Screed to Mat foundation
03-1-2 M² 50,565 60.00 3,033,900.00 /m2 45 & allow 33% as
excluding water tanks thickness 50/80 mm.
increase in unit rate :
45+ .33*45 = 60/m3

746413405.xlsx/Div- 3-Concrte works/Page29


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

03-1-3 Slopped Screed to water tanks floor. M² 1,435 60.00 86,100.00 Ditto

Protection Layer Screed 50mm thickness


03-1-4 M² 54,400 60.00 3,264,000.00 Ditto
as per drawings & specifications

03-2 INFRASTRUCTURE CONCRETE

Cast-In-Place Reinforced Concrete type of


cement ASTM Type-V as per drawings &
specifications and recommendation of
Geotechnical report.

Mat Foundation variable


thickness ,Reinforced concrete Fc’=40
MPa, with cement type according to the
recommendation of Geotechnical report.
03-2-1 M³ 30,550 1,200.00 36,660,000.00 Ditto
The price shall include formworks, steel
reinforcement bars, mixing, conveying,
placing, curing and testing according to
specifications.

Drop Foundation variable thickness.


Reinforced concrete Fc’=40 MPa for all
concrete , with cement type according to
the recommendation of of Geotechnical
03-2-2 M³ 950 1,200.00 1,140,000.00 Ditto
report. The price shall include formworks,
steel reinforcement bars, mixing,
conveying, placing, curing and testing
according to specifications.

Reinforced concrete Retaing wall as per


03-2-3 speccification. (f'c=35 Mpa) Cost shall M³ 1,070 1,250.00 1,337,500.00 Ditto
include the formwork, reinforcement.

2021 = completed
Reinforced concrete Grade Slab for the
Project Screed Unit rate
floor on elevator pit thk=200 mm .(f'c=20
03-2-4 M² 330 60.00 19,800.00 /m2 45 & allow 33% as
Mpa), As per speccification. Cost shall
increase in unit rate :
include the formwork, reinforcement.
45+ .33*45 = 60/m3

TOTAL CARRIED TO COLLECTION 45,541,300.00

CONCRETE WORKS (CONT'D)

03-3 SUPERSTRUCTURE

Cast-in-place Reinforced Concrete in


ordinary cement as per drawings &
specifications.

Refer to 2021
Completed Project in
RC Columns as per specification. (f'c=50
03-3-1 M³ 1,250 1,400.00 1,750,000.00 UAE : Concrtete +
Mpa)
Labour including Plant
as 1400/m3

RC Shear Wall (elevator and stair core) as


03-3-2 M³ 675 1,400.00 945,000.00 Ditto
per specification. (f'c=50 Mpa)

03-3-3 RC Walls as per specification. (f'c=35 Mpa) M³ 205 1,400.00 287,000.00 Ditto

Reinforced Concrete Stair.as per


03-3-4 M³ 60 1,400.00 84,000.00 Ditto
specification. (f'c=35 Mpa)

746413405.xlsx/Div- 3-Concrte works/Page30


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


Reinforced Concrete Ramp.as per
03-3-5 M³ 180 1,400.00 252,000.00 Ditto
specification. (f'c=35 Mpa)

03-4 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-4-1 M³ 23 600.00 13,800.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

03-5 BASEMENT LEVEL TANKS

Cast-in-place Reinforced Concrete type of


cement ASTM Type-I with blended micro
silica. (f'c=35 Mpa) as per drawings &
specifications.

Concrete Material,
Construction of tanks of size (As per
Plant and Labour =
03-5-1 drawings) with epoxy layer on floor and M³ 410 1,600.00 656,000.00
650+750+200 (Epoxy
internal face of walls.
lininh/m2) = 1600

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 3,987,800.00

COLLECTIONS:

DIVISION 03 : 1 / 3 2,400,000.00

DIVISION 03 : 2 / 3 45,541,300.00

DIVISION 03 : 3 / 3 3,987,800.00

746413405.xlsx/Div- 3-Concrte works/Page31


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 51,929,100.00 -


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL GROUND FLOOR DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

746413405.xlsx/Div- 3-Concrte works/Page32


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specifications
including formwork, reinforcement etc.
as complete job.

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-1 M³ 240 1,400.00 336,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Transfer walls at


03-1-2 M³ 420 1,400.00 588,000.00 Ditto
Ground floor (f'c=35 Mpa)

Reinforced Concrete walls for water feature


03-1-3 M³ 50 1,400.00 70,000.00 Ditto
at Ground floor (f'c=35 Mpa)

TOTAL CARRIED TO COLLECTION 994,000.00

CONCRETE WORKS (CONT'D)

03-2 POST TENSION WORK

For PT Slab with


Reinforced Concrete solid P.T Slab 300mm
fc=45Mpa ; with
3-2-1 thick including drop panels, etc.as per M2 47,000 400.00 18,800,000.00
Material,Plant and
drawings & specifications. (f'c=45 Mpa)
Labour Rate/m2 as 400

03-3 TRANSFORMER ROOMS

Reinforced concrete in ordinary cement as


per drawings & specifications including
formwork, reinforcement etc. as
complete job.

Refer to 2021
Completed Project in
RC Columns as per specification. (f'c=50
03-3-1 M³ 15 1,700.00 25,500.00 UAE : Concrtete +
Mpa)
Labour including Plant
as 1700/m3

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-3-2 M³ 22 1,400.00 30,800.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Refer to 2021
Completed Project in
Reinforced Concrete solid Slab 200mm
03-3-3 M³ 65 1,100.00 71,500.00 UAE : Concrtete +
thick etc.as per specification.
Labour including Plant
as 1100/m3

746413405.xlsx/Div- 3-Concrte works/Page33


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 18,927,800.00

CONCRETE WORKS (CONT'D)

03-4 INFRASTRUCTURE CONCRETE

Cast-In-Place Reinforced Concrete type


of cement ASTM Type-V.and maximum
water cement ratio:0.55. Minimum
concrete Cover of fdn. 40mm.

Reinforced concrete Grade Slab and 2021 = completed


external steps and ground ramps(grade Project Screed Unit rate
03-4-1 ramps) thk=150 mm .(f'c=20 Mpa), As per M² 11,500 60.00 690,000.00 /m2 45 & allow 33% as
speccification. Cost shall include the increase in unit rate :
formwork, reinforcement. 45+ .33*45 = 60/m2

Reinforced concrete Grade Slab for The


wide stairs on the left side for landscaping
in the ground floor and central
03-4-2 M² 232 60.00 13,920.00 Ditto
amphitheater thk=150 mm .(f'c=20 Mpa),
As per speccification. Cost shall include the
formwork, reinforcement.

03-4-3 Light weight concrete filling M³ 4,800 35.00 168,000.00 No Comments

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 3-Concrte works/Page34


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 871,920.00

COLLECTIONS:

DIVISION 03 : 1 / 3 994,000.00

DIVISION 03 : 2 / 3 18,927,800.00

DIVISION 03 : 3 / 3 871,920.00

TOTAL TO SUMMARY 20,793,720.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : OFFICE DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

746413405.xlsx/Div- 3-Concrte works/Page35


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specification
including formwork, reinforcement etc.
as complete job.

For column ,Shear wall


with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 860 1,700.00 1,462,000.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 1,050 1,700.00 1,785,000.00 Ditto
Mpa)

TOTAL CARRIED TO COLLECTION 3,247,000.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 565 1,400.00 791,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Stair.as per


03-1-4 M2 85 1,400.00 119,000.00 Ditto
specification. (f'c=35 Mpa)

Reinforced Concrete Solid slab at Upper


03-1-5 M³ 61 1,400.00 85,400.00 Ditto
roof level, as per specification. (f'c=35 Mpa)

746413405.xlsx/Div- 3-Concrte works/Page36


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


For column ,RC wall
with fc=50Mpa ; with
RC Wall (roof parapet) as per specification.
03-1-6 M³ 300 1,700.00 510,000.00 Material,Plant and
(f'c=35 Mpa)
Labour Rate/m3 as
1700

03-2 POST TENSION WORK

For Reinforced concrte


Reinforced Concrete solid P.T Slab 250mm solid PT Slab with
03-2-1 thick including drop panels, beams etc.as M2 7,545 350.00 2,640,750.00 fc=45Mpa ; with
per drawings & specification. (f'c=45 Mpa) Material,Plant and
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 230mm


03-2-2 thick including drop panels, beams etc.as M2 23,690 350.00 8,291,500.00 Ditto
per drawings & specification. (f'c=45 Mpa)

03-3 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-3-1 M³ 31 600.00 18,600.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 12,456,250.00

CONCRETE WORKS (CONT'D)

SECTION 03 49 00 - DECORATIVE
GLASS FIBER REINFORCED
CONCRETE (GFRC/GRC)

03-4 GRC WORKS

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-O-15 & A-O-16

746413405.xlsx/Div- 3-Concrte works/Page37


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

Pigmented GRC Cladding Projection on


Steel Frames. Color as per approved
sample.
at Roof Terrace as seen in Elevation 4
Ref: A-0-15
03-4-1 800mm (H) X 745mm (D) LM 114 380.00 43,320.00

03-4-2 800mm (H) X 250mm (D) LM 114 250.00 28,500.00

at 1F Level as seen in Elevation 2


03-4-3 LM 136 320.00 43,520.00
Ref: A-0-16
500mm (H) X 750mm (D)

at 2F Level as seen in ElevationS 1, 2, 3 &


03-4-4 LM 408 380.00 155,040.00
4 Ref: A-0-16
750mm (H) X 700mm (D)

Pigmented GRC Cladding Panel on Steel


03-4-5 Frames at R.C. Column. Color as per M² 278 650.00 180,700.00
approved sample.
as seen in Elevation 4

Pigmented GRC Cladding Panel on Steel


03-4-6 Frames at Wall. Color as per approved M² 816 650.00 530,400.00
sample.
at Elevation 3 & 2
GF To Mezzanine Level

TOTAL CARRIED TO COLLECTION 981,480.00

COLLECTIONS:

DIVISION 03 : 1 / 3 3,247,000.00

DIVISION 03 : 2 / 3 12,456,250.00

DIVISION 03 : 3 / 3 981,480.00

746413405.xlsx/Div- 3-Concrte works/Page38


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 16,684,730.00 -


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : HOTEL DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specification
including formwork, reinforcement etc.
as complete job.

746413405.xlsx/Div- 3-Concrte works/Page39


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


For column ,Shear wall
with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 830 1,700.00 1,411,000.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 1,500 1,700.00 2,550,000.00 Ditto
Mpa)

TOTAL CARRIED TO COLLECTION 3,961,000.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 490 1,400.00 686,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Stair.as per


03-1-4 M2 180 1,400.00 252,000.00 Ditto
specification. (f'c=35 Mpa)

Reinforced Concrete Slab at Upper roof


03-1-5 M³ 62 1,400.00 86,800.00 Ditto
level .as per specification. (f'c=35 Mpa)

For column ,RC wall


with fc=50Mpa ; with
RC Wall (roof parapet) as per specification.
03-1-6 M³ 155 1,700.00 263,500.00 Material,Plant and
(f'c=35 Mpa)
Labour Rate/m3 as
1700

03-2 POST TENSION WORK

For Reinforced concrte


Reinforced concrete solid P.T Slab 300mm
solid PT Slab with
thick including drop panels, P.T beams
03-2-1 M² 1,755 350.00 614,250.00 fc=45Mpa ; with
etc.as per drawings & specification. (f'c=45
Material,Plant and
Mpa)
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 280mm


thick including drop panels, P.T beams
03-2-2 M² 7,375 350.00 2,581,250.00 Ditto
etc.as per drawings & specification. (f'c=45
Mpa)

Reinforced Concrete solid P.T Slab 250mm


thick including drop panels, P.T beams
03-2-3 M² 8,715 350.00 3,050,250.00 Ditto
etc.as per drawings & specification. (f'c=45
Mpa)

Reinforced Concrete solid P.T Slab 230mm


thick including drop panels, P.T beams
03-2-4 M² 7,370 350.00 2,579,500.00 Ditto
etc.as per drawings & specification. (f'c=45
Mpa)

746413405.xlsx/Div- 3-Concrte works/Page40


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


TOTAL CARRIED TO COLLECTION 10,113,550.00

CONCRETE WORKS (CONT'D)

SECTION 09 77 00 - SPECIAL WALL


SURFACING
03-3 GRC WORKS

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-H-16 & A-H-17

Pigmented GRC Cladding Projection on


03-3-1 Steel Frames. Color as per approved
sample.

at Roof Terrace as seen in Elevation 2 & 3


800mm (H) X 740mm (D) LM 179 380.00 68,020.00

800mm (H) X 250mm (D) LM 179 320.00 57,280.00

Pigmented GRC Cladding Projection


03-3-2 LM 662.00 320.00 211,840.00
around Window
at 3F - 6F Level
475mm (D) X 100mm (H)

Pigmented GRC Cladding Panel on Steel


03-3-3 Frames at R.C. Column. Color as per M² 244 650.00 158,600.00
approved sample.

10.60m High at GF
M² 200 -
as seen in Elevations 2, 3 & 4

4.60m High at 1F Level


M² 30 -
as seen in Elevation 4

5.70m High at GF
M² 14 -
as seen in Elevation 2

TOTAL CARRIED TO COLLECTION 495,740.00

CONCRETE WORKS (CONT'D)

Pigmented GRC Cladding Panel on Steel


03-3-4 Frames at Wall. Color as per approved M² 629 650.00 408,850.00
sample.

at Elevation 2 (GF To Mezzanine Level) M² 304 -

at Elevation 3 (GF To Mezzanine Level) M² 325 -

746413405.xlsx/Div- 3-Concrte works/Page41


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 408,850.00

COLLECTIONS:

DIVISION 03 : 1 / 3 3,961,000.00

DIVISION 03 : 2 / 3 495,740.00

DIVISION 03 : 3 / 3 408,850.00

746413405.xlsx/Div- 3-Concrte works/Page42


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 4,865,590.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : CINEMA DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

746413405.xlsx/Div- 3-Concrte works/Page43


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specification
including formwork, reinforcement etc.
as complete job.

For column ,RC wall


with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 470 1,700.00 799,000.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 185 1,700.00 314,500.00 Ditto
Mpa)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 265 1,400.00 371,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

TOTAL CARRIED TO COLLECTION 1,484,500.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Stair.as per
03-1-4 M³ 55 1,400.00 77,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Solid slab at upper


03-1-5 M³ 25 1,400.00 35,000.00 Ditto
roof. as per specification. (f'c=35 Mpa)

03-2 POST TENSION WORK

For Reinforced concrte


Reinforced Concrete solid P.T Slab 300mm solid PT Slab with
03-2-1 thick including drop panels,beams etc.as M2 2,625 350.00 918,750.00 fc=45Mpa ; with
per drawings & specification. (f'c=45 Mpa) Material,Plant and
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 250mm


03-2-2 thick including drop panels, beams etc.as M2 3,145 350.00 1,100,750.00 Ditto
per drawings & specification. (f'c=45 Mpa)

03-3 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-3-1 M³ 18 600.00 10,800.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

SECTION 03 49 00 - DECORATIVE
GLASS FIBER REINFORCED
CONCRETE (GFRC/GRC)

03-4 GRC WORKS

746413405.xlsx/Div- 3-Concrte works/Page44


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-C-06 & A-C-08

Pigmented GRC Cladding Panel on Steel


Frames. Color as per approved sample.
03-4-1 at Elevation 1,2 & 5 M² 590 650.00 383,500.00

Pigmented GRC Cladding Panel with


Triangle Recess on Steel Frames. Color as
per approved sample.
03-4-2 at Elevation 2, 5 & 6 M² 752 680.00 511,360.00

TOTAL CARRIED TO COLLECTION 3,037,160.00

CONCRETE WORKS (CONT'D)

Corrugated Pigmented GRC Cladding


Panel on Steel Frames. Color as per
approved sample.
03-4-3 at Elevation 1 M² 312 750.00 234,000.00

Pigmented GRC Coping

200mm Coping
03-4-4 LM 335 320.00 107,200.00
at Elevation 1,2,5 & 6

400mm Coping
03-4-5 LM 246 320.00 78,720.00
at Elevation 1,2 & 6

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 3-Concrte works/Page45


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 419,920.00

COLLECTIONS:

DIVISION 03 : 1 / 3 1,484,500.00

DIVISION 03 : 2 / 3 3,037,160.00

DIVISION 03 : 3 / 3 419,920.00

TOTAL TO SUMMARY 4,941,580.00 -


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : RETAIL 1 DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

746413405.xlsx/Div- 3-Concrte works/Page46


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specification
including formwork, reinforcement etc.
as complete job.

For column ,RC wall


with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 275 1,700.00 467,500.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 150 1,700.00 255,000.00 Ditto
Mpa)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 110 1,400.00 154,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

TOTAL CARRIED TO COLLECTION 876,500.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Solid slab at upper
03-1-4 M³ 11 1,400.00 15,400.00 UAE : Concrtete +
roof .as per specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Stair.as per


03-1-5 M2 45 1,400.00 63,000.00 Ditto
specification. (f'c=35 Mpa)

746413405.xlsx/Div- 3-Concrte works/Page47


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


03-2 POST TENSION WORK

For Reinforced concrte


Reinforced Concrete solid P.T Slab 250mm solid PT Slab with
03-2-1 thick including drop panels, beams etc.as M2 4,260 350.00 1,491,000.00 fc=45Mpa ; with
per drawings & specification. (f'c=45 Mpa) Material,Plant and
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 230mm


03-2-2 thick including drop panels, beams etc.as M2 2,175 350.00 761,250.00 Ditto
per drawings & specification. (f'c=45 Mpa)

03-3 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-3-1 M³ 5 600.00 3,000.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

SECTION 03 49 00 - DECORATIVE
GLASS FIBER REINFORCED
CONCRETE (GFRC/GRC)

03-4 GRC WORKS

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-R-10a & A-R-10b

Pigmented GRC Cladding Projection on


03-4-1 RCC Beams, color as per approved M² 1,260 650.00 819,000.00
sample.
at Roof Terrace in all Elevations

TOTAL CARRIED TO COLLECTION 3,152,650.00

CONCRETE WORKS (CONT'D)

Pigmented GRC Cladding Panel on Steel


03-4-2 Frames at R.C. Column. Color as per M² 517 650.00 336,050.00
approved sample.
at all Elevations

Pigmented GRC Cladding Panel on Steel


03-4-3 Frames at Wall. Color as per approved M² 261 650.00 169,650.00
sample.
at Elevation 1

746413405.xlsx/Div- 3-Concrte works/Page48


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 505,700.00

COLLECTIONS:

DIVISION 03 : 1 / 3 876,500.00

DIVISION 03 : 2 / 3 3,152,650.00

DIVISION 03 : 3 / 3 505,700.00

746413405.xlsx/Div- 3-Concrte works/Page49


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 4,534,850.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : RETAIL 2 DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUPERSTRUCTURE

746413405.xlsx/Div- 3-Concrte works/Page50


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


Reinforced concrete in ordinary cement
as per drawings &specification
including formwork, reinforcement etc.
as complete job.

For column ,RC wall


with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 275 1,700.00 467,500.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 150 1,700.00 255,000.00 Ditto
Mpa)

TOTAL CARRIED TO COLLECTION 722,500.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 110 1,400.00 154,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Solid slab at Upper


03-1-4 roof .as per drawings & specification. M³ 13 1,400.00 18,200.00 Ditto
(f'c=35 Mpa)

Reinforced Concrete Stair.as per drawings


03-1-5 M2 45 1,400.00 63,000.00 Ditto
& specification. (f'c=35 Mpa)

03-2 POST TENSION WORK

For Reinforced concrte


Reinforced Concrete solid P.T Slab 250mm solid PT Slab with
03-2-1 thick including drop panels, beams etc.as M2 4,260 350.00 1,491,000.00 fc=45Mpa ; with
per drawings & specification. (f'c=45 Mpa) Material,Plant and
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 230mm


03-2-2 thick including drop panels, beams etc.as M2 2,170 350.00 759,500.00 Ditto
per drawings & specification. (f'c=45 Mpa)

03-3 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-3-1 M³ 5 600.00 3,000.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

SECTION 03 49 00 - DECORATIVE
GLASS FIBER REINFORCED
CONCRETE (GFRC/GRC)

03-4 GRC WORKS

746413405.xlsx/Div- 3-Concrte works/Page51


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-R-10a & A-R-10b

Pigmented GRC Cladding Projection on


03-4-1 RCC Beams, color as per approved M² 1,260 650.00 819,000.00
sample.
at Roof Terrace in all Elevations

TOTAL CARRIED TO COLLECTION 3,307,700.00

CONCRETE WORKS (CONT'D)

Pigmented GRC Cladding Panel on Steel


03-4-2 Frames at R.C. Column. Color as per M² 517 650.00 336,050.00
approved sample.
at all Elevations

Pigmented GRC Cladding Panel on Steel


03-4-3 Frames at Wall. Color as per approved M² 208 650.00 135,200.00
sample.
at Elevation 1

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 3-Concrte works/Page52


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


TOTAL CARRIED TO COLLECTION 471,250.00

COLLECTIONS:

DIVISION 03 : 1 / 3 722,500.00

DIVISION 03 : 2 / 3 3,307,700.00

DIVISION 03 : 3 / 3 471,250.00

TOTAL TO SUMMARY 4,501,450.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : LEISURE DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 03 30 00 - CAST-IN-PLACE
CONCRETE

746413405.xlsx/Div- 3-Concrte works/Page53


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

1-CLASSES OF CONCRETE 20. 28-DAYS


COMPRESSIVE STRENGTH TEST
CYLINDER 20(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
300(Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.55.
2-CLASSES OF CONCRETE 30. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 30(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
320 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
3-CLASSES OF CONCRETE 35. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 35(N/mm2), MINIMUM
CEMENT CONTENT - 100 mm SLUMP
340 (Kg/m3),MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.45.
4-CLASSES OF CONCRETE 40. 28-
DAYS COMPRESSIVE STRENGTH TEST
CYLINDER 40(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
360 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.40.
5-CLASSES OF CONCRETE 50. 28-DAYS
COMPRESSIVE STRENGTH TEST
CYLINDER 50(N/mm2),MINIMUM
CEMENT CONTENT - 100 mm SLUMP
400 (Kg/m3), MAXIMUM FREE WATER
CEMENT RATIO (BY WEIGHT) 0.38.

03-1 SUPERSTRUCTURE

Reinforced concrete in ordinary cement


as per drawings & specification
including formwork, reinforcement etc.
as complete job.

For column ,RC wall


with fc=50Mpa ; with
RC Columns as per specification. (f'c=50
03-1-1 M³ 355 1,700.00 603,500.00 Material,Plant and
Mpa)
Labour Rate/m3 as
1700

RC Shear Wall as per specification. (f'c=50


03-1-2 M³ 185 1,700.00 314,500.00 Ditto
Mpa)

Refer to 2021
Completed Project in
Reinforced Concrete Beams etc.as per
03-1-3 M³ 345 1,400.00 483,000.00 UAE : Concrtete +
specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

TOTAL CARRIED TO COLLECTION 1,401,000.00

CONCRETE WORKS (CONT'D)

Refer to 2021
Completed Project in
Reinforced Concrete Solid slab at upper
03-1-4 M³ 25 1,400.00 35,000.00 UAE : Concrtete +
roof.as per specification. (f'c=35 Mpa)
Labour including Plant
as 1400/m3

Reinforced Concrete Stair.as per


03-1-5 M2 55 1,400.00 77,000.00 Ditto
specification. (f'c=35 Mpa)

746413405.xlsx/Div- 3-Concrte works/Page54


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


03-2 POST TENSION WORK

For Reinforced concrte


Reinforced Concrete solid P.T Slab300mm solid PT Slab with
03-2-1 thick including drop panels, beams etc.as M2 2,625 350.00 918,750.00 fc=45Mpa ; with
per drawings & specification. (f'c=45 Mpa). Material,Plant and
Labour Rate/m3 as 350

Reinforced Concrete solid P.T Slab 250mm


03-2-2 thick including drop panels,beams etc.as M2 3,145 350.00 1,100,750.00 Ditto
per drawings & specification. (f'c=45 Mpa).

03-3 ROOF UPSTAND

2021 = completed
Projec class20/20
Concrete works for Roof upstand to Concrete Unit rate /m3"
03-3-1 M³ 18 600.00 10,800.00
Mechanical base 450 & allow 33% as
increase in unit rate :
450+ .33*450 = 600/m3

SECTION 03 49 00 - DECORATIVE
GLASS FIBER REINFORCED
CONCRETE (GFRC/GRC)

03-4 GRC WORKS

Supply and install GRC panels (Panel


materials specifications, decoration
shall be approved by the Engineer prior
to installation). The rate shall include
fixation using mechanical fixation by
metal frames and supports. GRC panel
shall be designed based on provided
specifications. Contractor shall provide
detailed shop drawings for each detail.
Ref: A-C-07 & A-C-08

Pigmented GRC Cladding Panel on Steel


Frames. Color as per approved sample.
03-4-1 at Elevation 3,4 & 5 M² 590 650.00 383,500.00

Pigmented GRC Cladding Panel with


Triangle Recess on Steel Frames. Color as
per approved sample.
03-4-2 at Elevation 3, 5 & 6 M² 752 680.00 511,360.00

TOTAL CARRIED TO COLLECTION 3,037,160.00

CONCRETE WORKS (CONT'D)

Corrugated Pigmented GRC Cladding


Panel on Steel Frames. Color as per
approved sample.
03-4-3 at Elevation 4 M² 312 750.00 234,000.00

Pigmented GRC Coping

200mm Coping
03-4-4 LM 335 320.00 107,200.00
at Elevation 3,4,5 & 6

400mm Coping
03-4-5 LM 246 320.00 78,720.00
at Elevation 3,4 & 6

746413405.xlsx/Div- 3-Concrte works/Page55


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 419,920.00

COLLECTIONS:

DIVISION 03 : 1 / 3 1,401,000.00

DIVISION 03 : 2 / 3 3,037,160.00

DIVISION 03 : 3 / 3 419,920.00

746413405.xlsx/Div- 3-Concrte works/Page56


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONCRETE WORKS
BUILDING : GENERAL BASEMENT DIVISION 03

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 4,858,080.00

746413405.xlsx/Div- 3-Concrte works/Page57


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 HOLLOW BLOCKWORK

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-1-1 300 mm Thick conrete hollow blockworks M² 1,386 125.00 173,250.00

04-1-2 200 mm Thick conrete hollow blockworks M² 564 95.00 53,580.00

04-1-3 150 mm Thick conrete hollow blockworks M² 123 90.00 11,070.00

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 237,900.00

COLLECTIONS:

DIVISION 04 : 1 / 1 237,900.00

746413405.xlsx/Div4 -Masonary /Page58


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 237,900.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL GROUND FLOOR DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS

746413405.xlsx/Div4 -Masonary /Page59


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Masonry / Block work, bedded jointed and


pointed in cement/sand mortar, including
formation of openings, recesses and grooves,
all vertical and horizontal joints, compressible
board joint filler, reinforced concrete lintels
and sills including all necessary fixings and
accessories, complete; all in accordance with
the Drawings and Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 870 150.00 130,500.00
blockworks Block work + Labour
including Plant as
150/m2

General Services at Ground Floor M² 870 -


LPG Storage Tank, Meter Room,
Transformer Room, SEC MV/SG / Metering

04-2 INTERIOR WALLS

Masonry / Block work, bedded jointed and


pointed in cement/sand mortar, including
formation of openings, recesses and grooves,
all vertical and horizontal joints, compressible
board joint filler, reinforced concrete lintels
and sills including all necessary fixings and
accessories, complete; all in accordance with
the Drawings and Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 58 125.00 7,250.00

General Services at Ground Floor M² 58 -


LPG Storage Tank, Meter Room,
Transformer Room, SEC MV/SG / Metering

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 21 95.00 1,995.00

General Services at Ground Floor M² 21 -


LPG Storage Tank, Meter Room,
Transformer Room, SEC MV/SG / Metering

TOTAL CARRIED TO COLLECTION 139,745.00

MASONRY WORKS (CONT'D)

04-3 PARAPET WALLS

746413405.xlsx/Div4 -Masonary /Page60


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-3-1 (M²) 133 150.00 19,950.00
blockworks Block work + Labour
including Plant as
150/m2

Roofdeck (General Services at GF) M² 133 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 19,950.00

COLLECTIONS:

DIVISION 04 : 1 / 2 139,745.00

DIVISION 04 : 2 / 2 19,950.00

746413405.xlsx/Div4 -Masonary /Page61


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 159,695.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : OFFICE DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS

746413405.xlsx/Div4 -Masonary /Page62


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 3,291 150.00 493,650.00
blockworks Block work + Labour
including Plant as
150/m2

Ground Floor M² 2,042 - -


Mezzanine Floor M² 776 -
Roof Plant Level M² 473 - -

04-2 INTERIOR WALLS


-
Masonry / Block work, bedded jointed
and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 17,276 125.00 2,159,500.00
-
Basement Floor M² 118 -
Ground Floor M² 1,421 - -
Mezzanine Floor M² 1,191 -
1st Floor M² 2,347 - -
Typical 2nd - 5th Floor M² 9,520 -
6th Floor M² 2,117 - -
Roof Plant Level M² 562 -

-
TOTAL CARRIED TO COLLECTION 2,653,150.00
-
MASONRY WORK (CONT'D)

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 1,951 95.00 185,345.00
-
Ground Floor M² 1,316 -
Mezzanine Floor M² 635 -

04-2-3 100 mm Thick hollow blockworks (M²) 1,241 85.00 105,485.00

1st Floor M² 248 -


Typical 2nd - 5th Floor M² 745 -

746413405.xlsx/Div4 -Masonary /Page63


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


6th Floor M² 248 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 290,830.00 -

COLLECTIONS: -

DIVISION 04 : 1 / 2 2,653,150.00

DIVISION 04 : 2 / 2 290,830.00

746413405.xlsx/Div4 -Masonary /Page64


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 2,943,980.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : HOTEL DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS

Masonry / Block work, bedded jointed and


pointed in cement/sand mortar, including
formation of openings, recesses and grooves,
all vertical and horizontal joints, compressible
board joint filler, reinforced concrete lintels
and sills including all necessary fixings and
accessories, complete; all in accordance with
the Drawings and Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 7,202 150.00 1,080,300.00
blockworks Block work + Labour
including Plant as
150/m2

Gound Floor M² 1,854 - -


Mezzanine Floor M² 921 -

746413405.xlsx/Div4 -Masonary /Page65


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


1st Floor M² 463 - -
Typical 2nd - 6th Floor M² 2,836 -
7th Floor M² 664 -
Roof Floor M² 464 - -

04-2 INTERIOR WALLS

Masonry / Block work, bedded jointed and


pointed in cement/sand mortar, including
formation of openings, recesses and grooves,
all vertical and horizontal joints, compressible
board joint filler, reinforced concrete lintels -
and sills including all necessary fixings and
accessories, complete; all in accordance with
the Drawings and Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 12,249 125.00 1,531,125.00

Basement Floor M² 156 - -


Ground Floor M² 3,646 -
Mezzanine Floor M² 1,813 - -
1st Floor M² 1,054 -
Typical 2nd - 6th Floor M² 4,719 -
7th Floor M² 435 -
Roof Plant Level M² 426 - -

-
TOTAL CARRIED TO COLLECTION 2,611,425.00
-
MASONRY WORK (CONT'D)

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 15,145 95.00 1,438,775.00

Ground Floor M² 348 -


Mezzanine Floor M² 175 -
1st Floor M² 2,503 -
Typical 2nd - 6th Floor M² 12,119 -

04-2-3 100 mm Thick hollow blockworks (M²) 1,507 85.00 128,095.00

1st Floor M² 264 -


Typical 2nd - 6th Floor M² 1,243 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div4 -Masonary /Page66


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 1,566,870.00

COLLECTIONS: -

DIVISION 04 : 1 / 2 2,611,425.00

DIVISION 04 : 2 / 2 1,566,870.00 -

746413405.xlsx/Div4 -Masonary /Page67


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

-
TOTAL TO SUMMARY 4,178,295.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : CINEMA DIVISION 04

No. Description Unit Qty Price Amount (SR)

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 1,894 150.00 284,100.00
blockworks Block work + Labour
including Plant as
150/m2

Gound Floor M² 680 -


Mezzanine Floor M² 435 -
Podium Floor M² 628 -
Roof Floor M² 151 -

200 mm Thick Pre-Insulated hollow


04-1-2 (M²) 258 105.00 27,090.00
blockworks

Mezzanine Floor M² 114 -


1st Floor M² 144 -

04-2 INTERIOR WALLS

746413405.xlsx/Div4 -Masonary /Page68


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-2-1 300 mm Thick Concrete hollow blockwork (M²) 499 125.00 62,375.00

Basement Floor M² 32 -
Ground Floor M² 306 -
Mezzanine Floor M² 39 -
1st Floor M² 122 -

TOTAL CARRIED TO COLLECTION 373,565.00

MASONRY WORK (CONT'D)

04-2-2 250 mm Thick Concrete hollow blockwork (M²) 158 115.00 18,170.00

Mezzanine Floor M² 158 -

04-2-3 200 mm Thick Concrete hollow blockwork (M²) 497 95.00 47,215.00

Basement Floor M² 12 -
Ground Floor M² 258 -
Mezzanine Floor M² 227 -

04-2-4 150 mm Thick hollow blockworks (M²) 437 90.00 39,330.00

Mezzanine Floor M² 247 -


1st Floor M² 190 -

04-2-5 100 mm Thick hollow blockworks (M²) 364 85.00 30,940.00

Ground Floor M² 51 -
Mezzanine Floor M² 99 -
1st Floor M² 214 -

04-3 CAVITY WALLS

Concrete masonry unit comprising two


layer of masonry units including with
necessary fillers, ties including
necessary accessories, hold fast, steel
mesh and expanded metal
reinforcement, galvanized steel angles
etc. built into every fourth course,
concrete filling to block where in
accordance with the general notes,
specifications, drawings.

450 mm Thick interior hollow blockworks


04-3-1 (M²) 511 210.00 107,310.00
(300mm + 50mm + 100mm)

746413405.xlsx/Div4 -Masonary /Page69


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

1st Floor M² 511 -

350 mm Thick interior hollow blockworks


04-3-2 (M²) 1,777 150.00 266,550.00
(200mm + 50mm + 100mm)

Mezzanine Floor M² 993 -


Podium Floor M² 784 -

TOTAL CARRIED TO COLLECTION 509,515.00

MASONRY WORK (CONT'D)

04-4 REINFORCED CMU WALLS

300 mm Thk Reinforced Conrete Solid &


04-4-1 hollow blockworks (f'c=25 Mpa) M² 65 190.00 12,350.00
Ref: ST-6.07

04-5 PARAPET WALLS

300 mm Thick Pre-Insulated hollow


04-5-1 (M²) 250 180.00 45,000.00
blockworks

Roof Deck M² 250 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div4 -Masonary /Page70


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 57,350.00

COLLECTIONS:

DIVISION 04 : 1 / 3 373,565.00

DIVISION 04 : 2 / 3 509,515.00

DIVISION 04 : 3 / 3 57,350.00

TOTAL TO SUMMARY 940,430.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : RETAIL 1 DIVISION 04

746413405.xlsx/Div4 -Masonary /Page71


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS


Masonry / Block work, bedded jointed
and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 2,033 150.00 304,950.00
blockworks Block work + Labour
including Plant as
150/m2

Gound Floor M² 497 -


Mezzanine Floor M² 707 -
Podium Floor M² 715 -
Roof Floor M² 114 -

04-1-2 150 mm Thick hollow blockworks (M²) 189 90.00 17,010.00

Gound Floor M² 58 -
Mezzanine Floor M² 69 -
Podium Floor M² 62 -

04-1-3 100 mm Thick hollow blockworks (M²) 62 85.00 5,270.00

Gound Floor M² 29 -
Mezzanine Floor M² 33 -

04-2 INTERIOR WALLS


Masonry / Block work, bedded jointed
and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 292 125.00 36,500.00
Basement Floor M² 38 -
Ground Floor M² 188 -
Mezzanine Floor M² 56 -
1st Floor M² 10 -

TOTAL CARRIED TO COLLECTION 363,730.00

746413405.xlsx/Div4 -Masonary /Page72


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


MASONRY WORK (CONT'D)

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 1,480 95.00 140,600.00
Ground Floor M² 519 -
Mezzanine Floor M² 508 -
1st Floor M² 453 -

04-2-3 100 mm Thick hollow blockworks (M²) 642 85.00 54,570.00


Ground Floor M² 156 -
Mezzanine Floor M² 193 -
1st Floor M² 257 -
Roof Plant Level M² 36 -

04-3 REINFORCED CMU WALLS

300 mm Thk Reinforced Conrete Solid &


04-3-1 hollow blockworks (f'c=25 Mpa) M² 20 190.00 3,800.00
Ref: ST-6.07

04-4 PARAPET WALLS

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-4-1 (M²) 252 150.00 37,800.00
blockworks Block work + Labour
including Plant as
150/m2

Roofdeck M² 252 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 236,770.00

COLLECTIONS:

DIVISION 04 : 1 / 2 363,730.00

746413405.xlsx/Div4 -Masonary /Page73


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


DIVISION 04 : 2 / 2 236,770.00

TOTAL TO SUMMARY 600,500.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : RETAIL 2 DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY
04-1 EXTERNAL WALLS

746413405.xlsx/Div4 -Masonary /Page74


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 1,916 150.00 287,400.00
blockworks Block work + Labour
including Plant as
150/m2

Gound Floor M² 459 -


Mezzanine Floor M² 488 -
1st Floor M² 624 -
Roof Floor M² 345 -

150 mm Thick Pre-Insulated hollow


04-1-2 (M²) 175 90.00 15,750.00
blockworks

Gound Floor M² 60 -
Mezzanine Floor M² 65 -
1st Floor M² 50 -

100 mm Thick Pre-Insulated hollow


04-1-3 (M²) 62 85.00 5,270.00
blockworks

Gound Floor M² 29 -
Mezzanine Floor M² 33 -

04-2 INTERIOR WALLS


Masonry / Block work, bedded jointed
and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 207 125.00 25,875.00

Basement Floor M² 28 -
Ground Floor M² 179 -

TOTAL CARRIED TO COLLECTION 334,295.00

MASONRY WORK (CONT'D)

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 1,516 95.00 144,020.00

Ground Floor M² 517 -


Mezzanine Floor M² 547 -

746413405.xlsx/Div4 -Masonary /Page75


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks


1st Floor M² 452 -

04-2-3 100 mm Thick hollow blockworks (M²) 550 85.00 46,750.00

Ground Floor M² 110 -


Mezzanine Floor M² 173 -
1st Floor M² 231 -
Roof Plant Level M² 36 -

04-3 REINFORCED CMU WALLS

300 mm Thk Reinforced Conrete Solid &


04-3-1 hollow blockworks (f'c=25 Mpa) M² 20 190.00 3,800.00
Ref: ST-6.07

04-4 PARAPET WALLS

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-4-1 (M²) 229 150.00 34,350.00
blockworks Block work + Labour
including Plant as
150/m2

Roofdeck M² 229 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 228,920.00

COLLECTIONS:

DIVISION 04 : 1 / 2 334,295.00

DIVISION 04 : 2 / 2 228,920.00

746413405.xlsx/Div4 -Masonary /Page76


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 563,215.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : LEISURE DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 04 22 00 - CONCRETE UNIT


MASONARY

04-1 EXTERNAL WALLS

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification

746413405.xlsx/Div4 -Masonary /Page77


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-1-1 (M²) 1,605 150.00 240,750.00
blockworks Block work + Labour
including Plant as
150/m2

Gound Floor M² 393 -


Mezzanine Floor M² 435 -
1st Floor M² 626 -
Roof Floor M² 151 -

04-2 INTERIOR WALLS

Masonry / Block work, bedded jointed


and pointed in cement/sand mortar,
including formation of openings,
recesses and grooves, all vertical and
horizontal joints, compressible board
joint filler, reinforced concrete lintels
and sills including all necessary fixings
and accessories, complete; all in
accordance with the Drawings and
Specification.

04-2-1 300 mm Thick Conrete hollow blockworks (M²) 628 125.00 78,500.00

Basement Floor M² 27 -
Ground Floor M² 232 -
Mezzanine Floor M² 102 -
1st Floor M² 205 -
Roof Plant Level M² 62 -

TOTAL CARRIED TO COLLECTION 319,250.00

MASONRY WORK (CONT'D)

04-2-2 200 mm Thick Conrete hollow blockworks (M²) 296 95.00 28,120.00

Basement Floor M² 12 -
Ground Floor M² 284 -

04-2-3 100 mm Thick hollow blockworks (M²) 127 85.00 10,795.00

Ground Floor M² 25 -
Mezzanine Floor M² 44 -
1st Floor M² 58 -

04-3 REINFORCED CMU WALLS

300 mm Thk Reinforced Conrete Solid &


04-3-1 hollow blockworks (f'c=25 Mpa) M² 55 190.00 10,450.00
Ref: ST-6.07

04-4 PARAPET WALLS

746413405.xlsx/Div4 -Masonary /Page78


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA MASONRY WORKS
BUILDING : GENERAL BASEMENT DIVISION 04

No. Description Unit Qty Price Amount (SR) Remarks

Masonry / Block work, bedded jointed and


pointed in cement/sand mortar, including
formation of openings, recesses and grooves,
all vertical and horizontal joints, compressible
board joint filler, reinforced concrete lintels
and sills including all necessary fixings and
accessories, complete; all in accordance with
the Drawings and Specification.

Refer to 2021
Completed Project in
300 mm Thick Pre-Insulated hollow UAE : 300mm AAC
04-4-1 (M²) 250 150.00 37,500.00
blockworks Block work + Labour
including Plant as
150/m2

Roof Deck M² 250 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 86,865.00

COLLECTIONS:

DIVISION 04 : 1 / 2 319,250.00

DIVISION 04 : 2 / 2 86,865.00

TOTAL TO SUMMARY 406,115.00

746413405.xlsx/Div4 -Masonary /Page79


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 51 00 - METAL STAIRS &


LADDERS

05-1 WATER TANK LADDERS

NTERNAL LADDERS

Supply and installation of High Density


Polyethylene (HDPE) pre-moulded Ladder
to Water Tank, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-MD-08

05-1-1 HDPE ladder to water tank; 2m High No 9 1,600.00 14,400.00

05-1-2 HDPE ladder to water tank; 2.5m High No 6 1,800.00 10,800.00

05-1-3 HDPE ladder to water tank; 3m High No 9 2,000.00 18,000.00

05-2 MANHOLE COVER

Supply & installation of Heavy Duty cast


iron manhole cover in compliance to
authority standards as per authority
requirement,all in accordance with the
specifications and drawings.

05-2-1 800 x 800 mm Manhole cover No 24 300.00 7,200.00

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 50,400.00

COLLECTIONS:

DIVISION 05 : 1 / 1 50,400.00

746413405.xlsx/Div- 5- Metal Work/Page80


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 50,400.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL GROUND FLOOR DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

CENTRAL RETAIL (PAVILION)

NOTE: Contractor should be submitted


Detailed Design, Calculations, Shop
drawings with specification for
Engineer's approval.

05-1 GROUND CENTRAL RETAIL 1

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-1-1 Black Steel with coating as per T 38.2 3,900.00 148,980.00
Protective cpating as
specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


Included in the unit
05-1-2 Black Steel, To be welded with Main Steel T 10 -
rate for item 05-1
at Shop.

05-1-3 Anchor Bolts , Hot Dip Galvanized T 6 - Ditto

05-2 GROUND CENTRAL RETAIL 2

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-2-1 Black Steel with coating as per T 146 3,900.00 569,400.00
Protective cpating as
specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


Included in the unit
05-2-2 Black Steel, To be welded with Main Steel T 36.5 -
rate for item 05-1
at Shop.

05-2-3 Anchor Bolts , Hot Dip Galvanized T 22 - Ditto

05-3 GROUND CENTRAL RETAIL 3

746413405.xlsx/Div- 5- Metal Work/Page81


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


As per completed Job
in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-3-1 Black Steel with coating as per T 110 3,900.00 429,000.00
Protective cpating as
specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-3-2 Black Steel, To be welded with Main Steel T 27.5 - Included
at Shop.

05-3-3 Anchor Bolts , Hot Dip Galvanized T 17 - Included

TOTAL CARRIED TO COLLECTION 1,147,380.00

METAL WORKS (CONT'D)

SECTION 05 52 00 - METAL RAILINGS

05-4 HANDRAIL - LANDSCAPE

Installation of Aluminum Component


Handrail, powder coated finish in white
color, complete; all in accordance with
drawings and specifications.

References:
Handrail Detail, X1B9-EH-010 €
at GF
05-4-1 Handrail Type 01 EH-010 LM 60 600.00 36,000.00

at Podium Pool Level (Hotel Bldg.)


05-4-2 Handrail Type 01 EH-010 LM 5 600.00 3,000.00

05-5 BALUSTRADE - LANDSCAPE

Installation of Tempered Glass Panel


Balustrade, including glass panel fixing,
complete; all in accordance with
drawings and specifications.

References:
Balustrade Detail, X1B9-EH-030 (E)
at GF
05-5-1 Balustrade EH-030 LM 100 700.00 70,000.00

at Podium Pool Level (Hotel Bldg.)


05-5-2 Balustrade EH-030 LM 16 700.00 11,200.00

746413405.xlsx/Div- 5- Metal Work/Page82


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 120,200.00

COLLECTIONS:

DIVISION 05 : 1 / 2 1,147,380.00

DIVISION 05 : 2 / 2 120,200.00

746413405.xlsx/Div- 5- Metal Work/Page83


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 1,267,580.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : OFFICE DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 OFFICE LEVEL 1 (ST-8.29)

As per completed Job


in UAE
Design,Supply and
Install including all
05-1-1 T 5.4 3,900.00 21,060.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-1-2 Black Steel, To be welded with Main Steel T 0.77 -
at Shop.

05-1-3 Anchor Bolts , Hot Dip Galvanized T 1.4 -

OFFICE LEVEL 3 CANOPY (ST-8.10 &


05-2
ST-8.11)

As per completed Job


in UAE
Design,Supply and
Install including all
05-2-1 T 13.31 3,900.00 51,909.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-2-2 Black Steel, To be welded with Main Steel T 0.4 - Included
at Shop.

05-2-3 Anchor Bolts , Hot Dip Galvanized T 0.02 - Included

OFFICE LEVEL 3 (ST-8.10 & ST-8.11)


05-3
SINGLE FRAME (ELEVATION II)

746413405.xlsx/Div- 5- Metal Work/Page84


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


As per completed Job
in UAE
Design,Supply and
Install including all
05-3-1 T 5.3 3,900.00 20,670.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-3-2 Black Steel, To be welded with Main Steel T 0.4 - Included
at Shop.

05-3-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

TOTAL CARRIED TO COLLECTION 93,639.00

METAL WORKS (CONT'D)

OFFICE LEVEL 4 (5 - ST-8.11)


05-4
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Install including all
05-4-1 T 3.465 3,900.00 13,513.50
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-4-2 Black Steel, To be welded with Main Steel T 0.43 - Included
at Shop.

05-4-3 Anchor Bolts , Hot Dip Galvanized T 0.09 -

OFFICE LEVEL 5 (5 - ST-8.11)


05-5
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Install including all
05-5-1 T 3.465 3,900.00 13,513.50
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-5-2 Black Steel, To be welded with Main Steel T 0.43 - Included
at Shop.

05-5-3 Anchor Bolts , Hot Dip Galvanized T 0.09 - Included

746413405.xlsx/Div- 5- Metal Work/Page85


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


OFFICE LEVEL 6 (5 - ST-8.11
05-6
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Install including all
05-6-1 T 3.465 3,900.00 13,513.50
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-6-2 Black Steel, To be welded with Main Steel T 0.43 - Included
at Shop.

05-6-3 Anchor Bolts , Hot Dip Galvanized T 0.09 - Included

OFFICE LEVEL 7 (5 - ST-8.11)


05-7
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Install including all
05-7-1 T 3.465 4,200.00 14,553.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-7-2 Black Steel, To be welded with Main Steel T 0.43 - Included
at Shop.

05-7-3 Anchor Bolts , Hot Dip Galvanized T 0.09 - Included

TOTAL CARRIED TO COLLECTION 55,093.50

METAL WORKS (CONT'D)

OFFICE ROOF SINGLE FRAME AS PER


05-8
ELEVATION I (ST-8.22 TO ST-8.26)

As per completed Job


in UAE
Design,Supply and
Install including all
05-8-1 T 16.76 4,200.00 70,392.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-8-2 Black Steel, To be welded with Main Steel T 0.4 - Included
at Shop.

05-8-3 Anchor Bolts , Hot Dip Galvanized T 0.21 - Included


OFFICE UPPER ROOF LOUVER (ST-
05-9
8.14)

746413405.xlsx/Div- 5- Metal Work/Page86


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


As per completed Job
in UAE
Design,Supply and
Install including all
05-9-1 T 52 3,900.00 202,800.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-9-2 Black Steel, To be welded with Main Steel T 2.2 - Included
at Shop.

05-9-3 Anchor Bolts , Hot Dip Galvanized T 0.17 - Included

05-10 STEEL SUPPORT

Steel Support for Pigmented GRC


cladding projection randomly installed
as per Architect's Specifications.
Ref: A-O-15

At First Floor Level


5-10-1 0.20m (W) x 0.50m (H) LM 57 350.00 19,950.00

5-10-2 0.20m (W) x 0.15m (H) LM 23 300.00 6,900.00

TOTAL CARRIED TO COLLECTION 300,042.00

METAL WORKS (CONT'D)

SECTION 05 52 00 - METAL RAILINGS

STAINLESS STEEL WITH GLASS


05-11
RAILING

746413405.xlsx/Div- 5- Metal Work/Page87


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

Providing and fixing 12 mm tempered


glass with stainless steel chrome finish
railing made of Hollow tubes, channels,
plates etc., Handrail: comprise of Ø50
mm stainless steel pipe. Including
welding, grinding, buffing, polishing and
making curvature (wherever required)
and fitting the same with necessary
stainless steel nuts and bolts complete,
i/c fixing the railing with necessary
accessories & stainless steel dash
fasteners, stainless steel bolts etc., of
required size, on the top of the floor or
the side of waist slab with suitable
arrangement as per approval of
Engineer.
Ref: A-O-17a

1000mm High Stainless Steel cear Glass


05-11-1 LM 46 950.00 43,700.00
balustrade
at Entrance (GF Level)

Supply and installation of 12 mm thick


tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.
Ref: A-O-15

1100mm High tempered 12mm thick clear


(M²) 261 1,000.00 261,000.00
Glass balustrade

05-11-2 at Roof Terrace (FF Level) LM 106 -

05-11-3 at Terrace (2nd Level) LM 73 -

05-11-4 at Terrace (6th Flr. Level) LM 82 -

TOTAL CARRIED TO COLLECTION 304,700.00

METAL WORKS (CONT'D)

05-12 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-12-1 screws, 6mm thick 80x80mm Galvanized LM 239 450.00 107,550.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-0-20

746413405.xlsx/Div- 5- Metal Work/Page88


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe toprail (RAL 7005),
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-12-2 LM 139 1,100.00 152,900.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-0-20

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 260,450.00

COLLECTIONS:

DIVISION 05 : 1 / 5 93,639.00

DIVISION 05 : 2 / 5 55,093.50

DIVISION 05 : 3 / 5 300,042.00

DIVISION 05 : 4 / 5 304,700.00

DIVISION 05 : 5 / 5 260,450.00

746413405.xlsx/Div- 5- Metal Work/Page89


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 1,013,924.50


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : HOTEL DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 HOTEL LEVEL 1 (ST-8.29)

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-1-1 Black Steel with two hours fire resistance T 5.4 3,900.00 21,060.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-1-2 Black Steel, To be welded with Main Steel T 0.77 - Included
at Shop.

05-1-3 Anchor Bolts , Hot Dip Galvanized T 1.4 - Included

HOTEL LEVEL 3 (5 - ST-8.11)


05-2
SINGLE FRAME
.
As per completed Job
in UAE
Design,Supply and
Install including all
05-2-1 T 3 3,900.00 11,700.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

746413405.xlsx/Div- 5- Metal Work/Page90


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


.
Connection Plates, Material Fy=355 MPa,
05-2-2 Black Steel, To be welded with Main Steel T 0.37 - Included
at Shop.
.
05-2-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

HOTEL LEVEL 4 (5 - ST-8.11)


05-3
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-3-1 Black Steel with two hours fire resistance T 3 3,900.00 11,700.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-3-2 Black Steel, To be welded with Main Steel T 0.37 - Included
at Shop.

05-3-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

HOTEL LEVEL 5 (5 - ST-8.11)


05-4
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-4-1 Black Steel with two hours fire resistance T 3 3,900.00 11,700.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

TOTAL CARRIED TO COLLECTION 56,160.00

METAL WORKS (CONT'D)

Connection Plates, Material Fy=355 MPa,


05-4-2 Black Steel, To be welded with Main Steel T 0.37 - Included
at Shop.

05-4-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

HOTEL LEVEL 6 (5 - ST-8.11)


05-5
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-5-1 Black Steel with two hours fire resistance T 3 3,900.00 11,700.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-5-2 Black Steel, To be welded with Main Steel T 0.37 - Included
at Shop.

746413405.xlsx/Div- 5- Metal Work/Page91


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

05-5-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

HOTEL LEVEL 7 (5 - ST-8.11)


05-6
SINGLE FRAME

As per completed Job


in UAE
Design,Supply and
Install including all
05-6-1 T 3 3,900.00 11,700.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-6-2 Black Steel, To be welded with Main Steel T 0.37 - Included
at Shop.

05-6-3 Anchor Bolts , Hot Dip Galvanized T 0.08 - Included

05-7 HOTEL POOL ROOF (ST-8.27)

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-7-1 Black Steel with two hours fire resistance T 26.77 3,900.00 104,403.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-7-2 Black Steel, To be welded with Main Steel T 0.65 - Included
at Shop.

05-7-3 Anchor Bolts , Hot Dip Galvanized T 0.04 - Included

TOTAL CARRIED TO COLLECTION 127,803.00

METAL WORKS (CONT'D)

HOTEL ROOF SINGLE FRAME AS PER


05-8
ELEVATION I (ST-8.22 TO ST-8.26)

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-8-1 Black Steel with two hours fire resistance T 12.77 4,200.00 53,634.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-8-2 Black Steel, To be welded with Main Steel T 0.3 - Included
at Shop.

05-8-3 Anchor Bolts , Hot Dip Galvanized T 0.16 - Included

746413405.xlsx/Div- 5- Metal Work/Page92


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


HOTEL & OFFICE ROOF (MAIN
05-9
CANOPY) (ST-8.22 TO ST-8.26)

As per completed Job


in UAE
Design,Supply and
Install including all
05-9-1 T 44.36 3,900.00 173,004.00
Protective cpating as
Built-up Sections, Material Fy=355 MPa, necessary Bolts&
Black Steel with two hours fire resistance Anchor Plates all
coating and paint . as per specification. together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-9-2 Black Steel, To be welded with Main Steel T 1.22 - Included
at Shop.

05-9-3 Anchor Bolts , Hot Dip Galvanized T 1.32 - Included

05-10 STEEL SUPPORT

Steel Support for Pigmented GRC


cladding projection randomly installed
as per Architect's Specifications.
Ref: A-H-16

At First Floor Level


05-10-1 0.20m (W) x 0.50m (H) LM 136 1,200.00 163,200.00

05-10-2 0.20m (W) x 0.15m (H) LM 41 600.00 24,600.00

TOTAL CARRIED TO COLLECTION 414,438.00

METAL WORKS (CONT'D)

SECTION 05 51 00 - METAL STAIRS &


LADDERS

05-11 STEEL HELICAL STAIRCASE

Supply and installation of steel helical


staircase including polishing and
welding (where required) and fixing the
same with necessory accessories i.e.
nuts, bolts, etc.

at GF - MF Hotel Lobby

746413405.xlsx/Div- 5- Metal Work/Page93


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

Supply and installation of 500mm diameter


Steel hollow Column post with outer
thickness is 10mm, comprising with steel
internal steps width is 56mm & external
steps width is 429mm and 120mm steel
risers in the middle of the steps welded with
10mm thick Steel base plate anchored to
Ground Floor cocrete slab, including
finishes and all necessary fixing
accessories; all in accordance with the
Drawings & Specifications.
Ref: ST-8.01

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-11-1 Black Steel with two hours fire resistance T 56 3,900.00 218,400.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-11-2 Black Steel, To be welded with Main Steel T 0.08 - Included
at Shop.

05-11-3 Anchor Bolts , Hot Dip Galvanized T 0.02 - Included

TOTAL CARRIED TO COLLECTION 218,400.00

METAL WORKS (CONT'D)

SECTION 05 52 00 - METAL RAILINGS

STAINLESS STEEL WITH GLASS


05-12
RAILING

746413405.xlsx/Div- 5- Metal Work/Page94


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

Providing and fixing 12 mm tempered


glass with stainless steel chrome finish
railing made of Hollow tubes, channels,
plates etc., Handrail: comprise of Ø50
mm stainless steel pipe. Including
welding, grinding, buffing, polishing and
making curvature (wherever required)
and fitting the same with necessary
stainless steel nuts and bolts complete,
i/c fixing the railing with necessary
accessories & stainless steel dash
fasteners, stainless steel bolts etc., of
required size, on the top of the floor or
the side of waist slab with suitable
arrangement as per approval of
Engineer.
Ref: A-O-17a

1000mm High Stainless Steel cear Glass


05-12-1 LM 47 1,200.00 56,400.00
balustrade
at Entrance (GF Level)

Supply and installation of 12 mm thick


tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.
Ref: A-H-16 & A-H-17

1100mm High tempered 12mm thick clear


05-12-2 LM 438 1,200.00 525,600.00
Glass balustrade

05-12-3 at Roof Terrace (FF Level) LM 183 -

05-12-4 at Roof Terrace (7F Level) LM 255 -

TOTAL CARRIED TO COLLECTION 582,000.00

METAL WORKS (CONT'D)

05-13 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-13-1 screws, 6mm thick 80x80mm Galvanized Lm 386 1,100.00 424,600.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-H-22, A-H-23 & A-H-24

746413405.xlsx/Div- 5- Metal Work/Page95


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe (RAL 7005) toprail,
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-13-2 Lm 225 1,300.00 292,500.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-H-22, A-H-23 & A-H-24

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 717,100.00

COLLECTIONS:

DIVISION 05 : 1 / 6 56,160.00

DIVISION 05 : 2 / 6 127,803.00

DIVISION 05 : 3 / 6 414,438.00

DIVISION 05 : 4 / 6 218,400.00

DIVISION 05 : 5 / 6 582,000.00

DIVISION 05 : 6 / 6 717,100.00

746413405.xlsx/Div- 5- Metal Work/Page96


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 2,115,901.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : CINEMA DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 STEEP STRUCTURAL STEEL FRAMING

NOTE: Contractor should be submitted


Detailed Design, Calculations, Shop
drawings with specification for
Engineer's approval.

Framing and fabrication of steep structural


steel frames & supports works including
05-1-1 protective coating all in accordance with M² 957 850.00 813,450.00
Drawings & Specifications.
Ref: A-C-10 & A-C-11

SECTION 05 52 00 - METAL RAILINGS

STAINLESS STEEL WITH GLASS


05-2
RAILING

Supply and installation of 12 mm thick


tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.

1100mm High tempered 12mm thick clear


05-2-1 LM 46 1,000.00 46,000.00
Glass balustrade
at Mezzanine Floor

746413405.xlsx/Div- 5- Metal Work/Page97


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 859,450.00

METAL WORKS (CONT'D)

05-3 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-3-1 screws, 6mm thick 80x80mm Galvanized Lm 159 450.00 71,550.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-C-14 to A-C-18

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe (RAL 7005) toprail,
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-3-2 Lm 90 1,100.00 99,000.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-C-14 to A-C-18

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 5- Metal Work/Page98


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL CARRIED TO COLLECTION 170,550.00

COLLECTIONS:

DIVISION 05 : 1 / 2 859,450.00

DIVISION 05 : 2 / 2 170,550.00

TOTAL TO SUMMARY 1,030,000.00

746413405.xlsx/Div- 5- Metal Work/Page99


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : RETAIL 1 DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 RETAIL 01 LEVEL 2 (ST-8.30)

As per completed Job


in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-1-1 Black Steel with two hours fire resistence T 10.82 3,900.00 42,198.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-1-2 Black Steel, To be welded with Main Steel T 0.83 - Included
at Shop.

05-1-3 Anchor Bolts , Hot Dip Galvanized T 0.44 - Included

SECTION 05 52 00 - METAL RAILINGS

05-2 GLASS RAILING

Providing and fixing 12 mm tempered


glass with stainless steel chrome finish
railing made of Hollow tubes, channels,
plates etc., Handrail: comprise of Ø50
mm stainless steel pipe. Including
welding, grinding, buffing, polishing and
making curvature (wherever required)
and fitting the same with necessary
stainless steel nuts and bolts complete,
i/c fixing the railing with necessary
accessories & stainless steel dash
fasteners, stainless steel bolts etc., of
required size, on the top of the floor or
the side of waist slab with suitable
arrangement as per approval of
Engineer.
Ref: A-R-16a & A-R-16b

1000mm High Stainless Steel cear Glass


05-2-1 LM 63 950.00 59,850.00
balustrade
at Entrance (GF Level)
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 5- Metal Work/Page100


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


TOTAL CARRIED TO COLLECTION 102,048.00

METAL WORKS (CONT'D)

Supply and installation of 12 mm thick


tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.
Ref: A-R-10a

1060mm High tempered 12mm thick clear


05-2-2 LM 135 950.00 128,250.00
Glass balustrade
at Podium Terrace (FF Level)

05-3 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-3-1 screws, 6mm thick 80x80mm Galvanized Lm 133 450.00 59,850.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-R-14 & A-R-15

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe toprail (RAL 7005),
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-3-2 Lm 79 1,100.00 86,900.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-R-14 & A-R-15

TOTAL CARRIED TO COLLECTION 436,898.00

COLLECTIONS:

DIVISION 05 : 1 / 2 102,048.00

DIVISION 05 : 2 / 2 436,898.00

746413405.xlsx/Div- 5- Metal Work/Page101


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 538,946.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : RETAIL 2 DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 RETAIL 02 LEVEL 2 (ST-8.30)

746413405.xlsx/Div- 5- Metal Work/Page102


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


As per completed Job
in UAE
Design,Supply and
Built-up Sections, Material Fy=355 MPa,
Install including all
05-1-1 Black Steel with two hores fire resistance T 10.82 3,900.00 42,198.00
Protective cpating as
coating and paint . as per specification.
necessary Bolts&
Anchor Plates all
together : 3900/Ton

Connection Plates, Material Fy=355 MPa,


05-1-2 Black Steel, To be welded with Main Steel T 0.83 - Included
at Shop.

05-1-3 Anchor Bolts , Hot Dip Galvanized T 0.44 - Included

SECTION 05 52 00 - METAL RAILINGS

05-2 GLASS RAILING

Providing and fixing 12 mm tempered


glass with stainless steel chrome finish
railing made of Hollow tubes, channels,
plates etc., Handrail: comprise of Ø50
mm stainless steel pipe. Including
welding, grinding, buffing, polishing and
making curvature (wherever required)
and fitting the same with necessary
stainless steel nuts and bolts complete,
i/c fixing the railing with necessary
accessories & stainless steel dash
fasteners, stainless steel bolts etc., of
required size, on the top of the floor or
the side of waist slab with suitable
arrangement as per approval of
Engineer.
Ref: A-R-16a & A-R-16b

1000mm High Stainless Steel cear Glass


05-2-1 LM 63 950.00 59,850.00
balustrade
at Entrance (GF Level)
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 102,048.00

METAL WORKS (CONT'D)

Supply and installation of 12 mm thick


tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.
Ref: A-R-10a

746413405.xlsx/Div- 5- Metal Work/Page103


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

1060mm High tempered 12mm thick clear


05-2-2 LM 130 950.00 123,500.00
Glass balustrade
at Podium Terrace (FF Level)

05-4 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-4-1 screws, 6mm thick 80x80mm Galvanized LM 133 450.00 59,850.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-R-14 & A-R-15

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe toprail (RAL 7005),
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-4-2 LM 79 1,100.00 86,900.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-R-14 & A-R-15

TOTAL CARRIED TO COLLECTION 270,250.00

COLLECTIONS:

DIVISION 05 : 1 / 2 102,048.00

DIVISION 05 : 2 / 2 270,250.00

746413405.xlsx/Div- 5- Metal Work/Page104


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 372,298.00


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : LEISURE DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

SECTION 05 12 00 - STRUCTURAL
STEEL FRAMING

05-1 STEEP STRUCTURAL STEEL FRAMING

NOTE: Contractor should be submitted


Detailed Design, Calculations, Shop
drawings with specification for
Engineer's approval.

Framing and fabrication of steep structural


steel frames & supports works including
05-1-1 protective coating all in accordance with M² 957 850.00 813,450.00
Drawings & Specifications.
Ref: A-C-10 & A-C-11

SECTION 05 52 00 - METAL RAILINGS

STAINLESS STEEL WITH GLASS


05-2
RAILING

746413405.xlsx/Div- 5- Metal Work/Page105


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


Supply and installation of 12 mm thick
tempered Glass with stainless steel
chrome finish railing including buffing,
polishing and making curves (where
required) and fixing the same with
necessory accessories i.e. nuts, bolts,
fastneres etc.

1100mm High tempered 12mm thick clear


05-2-1 LM 43 1,000.00 43,000.00
Glass balustrade
at Mezzanine Floor

TOTAL CARRIED TO COLLECTION 856,450.00

METAL WORKS (CONT'D)

05-3 HANDRAIL

Wall mounted Handrail;


Supply and installation of 50mm diameter
Galvanized Steel Pipe handrail (RAL 7005)
to 2mm thick 30mm diameter elbow
Galvanized Steel tube brackets with
05-3-1 screws, 6mm thick 80x80mm Galvanized LM 118 1,100.00 129,800.00
Steel Plates fixed to wall, including finishes
and all necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-C-14 to A-C-18

Floor mounted Handrail (900mm High);


Supply and installation of 50mm diameter
Galvanized Steel Pipe (RAL 7005) toprail,
comprising 40mm diameter posts and
40mm Galvanized Steel Pipe discontinuos
bottom rails welded & ground smooth fixed
05-3-2 LM 62 1,300.00 80,600.00
with Galvanized Steel flange anchored to
concrete stairs, including finishes and all
necessary fixing accessories; all in
accordance with the Drawings &
Specifications.
Ref: A-C-14 to A-C-18

746413405.xlsx/Div- 5- Metal Work/Page106


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 210,400.00

COLLECTIONS:

DIVISION 05 : 1 / 2 856,450.00

DIVISION 05 : 2 / 2 210,400.00

746413405.xlsx/Div- 5- Metal Work/Page107


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA METAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 05

No. Description Unit Qty Price Amount (SR) Remarks

TOTAL TO SUMMARY 1,066,850.00

746413405.xlsx/Div- 5- Metal Work/Page108


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA THERMAL & MOISTURE PROTECTION WORKS
BUILDING : GENERAL BASEMENT DIVISION 07

No. Description Unit Qty Price Amount (SR)

SECTION 07 10 00 - DAMPPROOFING &


WATERFROOFING

07-1 BITUMINOUS DAMPPROOFING

Two Layers of Bitumen Sheets with


4mm thick / layer

Under Foundation as per drawings &


07-1-1 M² 54,400 30.00 1,632,000.00
specification.

To Retaining Walls as per drawings &


07-1-2 M² 500 50.00 25,000.00
specification.

To Blockwork Retaining Walls as per


07-1-3 M² 2,500 50.00 125,000.00
drawings & specification.

07-2 BOUNDARY WALL WATERPROOFING

Cold applied Bitumen rubberized


Coating 2 layers (strip footing and
boundary wall with compartment system
For surface contact with soil or Any
other required items as per Drawings
and Specifications.)

07-2-1 For strip footing M² 1,190 29.00 34,510.00

07-2-2 For boundary wall M² 1,810 29.00 52,490.00

07-3 PROTECTION BOARD

Protection board to retaining wall as per


07-3-1 M² 3,000
drawings & specification

SECTION 07 26 50 - VAPOR BARRIERS

SUPPLY AND APPLICATION OF 150


07-4
MICRON VAPOR BARRIERS

07-4-1 To below plain concrete foundations M² 52,000 10.00 520,000.00

To 200 mm thick block masonry wall to


07-4-2 protect retaining wall insulation. As per M² 3,000 10.00 30,000.00
specification

746413405.xlsx/Div- 7-Thermal & Moisture Prote/Page109


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA THERMAL & MOISTURE PROTECTION WORKS
BUILDING : GENERAL BASEMENT DIVISION 07

No. Description Unit Qty Price Amount (SR)


To below plain concrete foundations of
07-4-3 M² 300 10.00 3,000.00
boundary wall

TOTAL CARRIED TO COLLECTION 2,422,000.00

THERMAL & MOISTURE PROTECTION


WORKS (CONT'D)

07-5 PVC WATER STOP

Polymer based PVC, high elasticity,


tensile strength, withstand high
hydrostatic pressure and unaffected by
acids, alkali, metal salts and other
chemicals. Size 250mm x 10mm thick,
dumbbell type black color. Ref: ST-7.01
to ST-7.05

07-5-1 Water stopper out of retaining wall LM 1,485 40.00 59,400.00

07-5-2 Swelling bar. LM 1,485 35.00 51,975.00

SECTION 07 95 00 - EXPANSION JOINT


CONTROL

07-6 EXPANSION JOINT COVER

Apply & installation of High movement


double barrier TM series heat weldable,
two-ply polyuretehane nosing material
expansion joint cover with joint filler,
sealent, backer rod & all required
applications, complete; all in
accordance with drawings &
specification
Ref: A-MD-01

30mm Expansion Joint Cover

07-6-1 To Ceiling Finishes LM 1,234 120.00 148,080.00

60mm Expansion Joint Cover

07-6-2 To Ceiling Finishes LM 276 180.00 49,680.00

746413405.xlsx/Div- 7-Thermal & Moisture Prote/Page110


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA THERMAL & MOISTURE PROTECTION WORKS
BUILDING : GENERAL BASEMENT DIVISION 07

No. Description Unit Qty Price Amount (SR)


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 309,135.00

COLLECTIONS:

DIVISION 07 : 1 / 2 2,422,000.00

DIVISION 07 : 2 / 2 309,135.00

746413405.xlsx/Div- 7-Thermal & Moisture Prote/Page111


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA THERMAL & MOISTURE PROTECTION WORKS
BUILDING : GENERAL BASEMENT DIVISION 07

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 2,731,135.00

746413405.xlsx/Div- 7-Thermal & Moisture Prote/Page112


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

SECTION 08 11 00 - METAL DOORS &


FRAMES
SECTION 08 71 00 - DOOR HARDWARE

Supply and installation of metal & steel


doors with necessary acoustic and fire
rating requirement, including but not
limited to, all necessary frames, door
panels, finishes to doors, paintings,
ironmongeries and hardware, and fixing
accessories, as per Drawings and
Specification
Ref: A-O-18, A-O-19 & A-O-19a
08-1 METAL STEEL DOOR

Finish shall be International Intertuf


modified epoxy: 1.5 hrs fire rating,high
solid primer and International Interthane
990 LOW VOC thin film polyurethane.
Standard color in high gloss black.
Surface to be primed and cured prior to
application of the finish coat. Hinges to
be heavy duty cast iron.

D06; Double Swing Door;


08-1-1 Sets 9 3,645.00 32,805.00
Overall dim 1350 x 2250mm High
B02 - MDB Room
B06 - Generator Room
B11 - Pump Room
B14 - Air Intake Room (6)

D07; Single Swing Door;


08-1-2 Sets 16 3,375.00 54,000.00
Overall dim 1250 x 2250mm High
B02 - MDB Room (2)
B06 - Generator Room
B07 - Fuel Tank Room (4)
B11 - Pump Room (3)
B14 - Air Intake Room (6)

D11; Folding Door;


08-1-3 Sets 3 10,560.00 31,680.00
Overall dim 4000 x 2200mm High
B06 - Generator Room (2)
B11 - Generator Room

D20; Double Swing Door;


08-1-4 Sets 7 5,670.00 39,690.00
Overall dim 2100 x 2250mm High
B02 - Sto. Rm -Amphitheater above (2)
B08 - Central Pump Room
B11 - Pump Room (2)
B11 - Grey Water Treatment Irrigation

746413405.xlsx/Div- 8-Doors 7 windows/Page113


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 158,175.00

DOORS AND WINDOWS (CONT'D)

08-2 EMERGENCY FIRE EXIT DOOR


Fire proof insulated galvanized steel sheet,
hollow metal door in grey color paint finish.
2 hrs fire rating, steel bearing type hinges.
NFPA 80 compliant tested & approved
materials, latching & hardwares.

D06a; Double Swing Door;


08-2-1 Sets 8 4,252.50 34,020.00
Overall dim 1350 x 2250mm High
BF - Stair Exit

D08a; Single Swing Door;


08-2-2 Sets 2 3,937.50 7,875.00
Overall dim 1250 x 2250mm High
BF - Elev. Lobby

SECTION 08 11 16 - ALUMINIUM DOORS


& FRAMES
SECTION 08 71 00 - DOOR HARDWARE

Supply and installation of 1.5 hrs fire


rating, glass doors as per schedule and
details including sensors, ironmongery,
door handles/pull, locksets and other
accessories to complete. All hardware
fixture, sealants weather strippings to
suit masonry openings. To include
Special steel support for curtain wall
system.
Ref: A-O-18, A-O-19, A-O-19a, A-B-01 &
A-B-02

POWDER COATED ALUMINIUM


08-3
FRAMED GLASS DOOR
Single glazing sliding type glass door,
13.524mm total thickness laminated clear
float glass as per performance
specification. Contractor to submit shop
drawings for approval prior to installation.

SD1; Double Automatic Sliding Glass


08-3-1 Door; Sets 11 4,928.00 54,208.00
Overall dim 1600 x 2200mm High
BF - Entrance Elev. Lobbies

SD2; Double Automatic Sliding Glass


08-3-2 Door; Sets 1 6,160.00 6,160.00
Overall dim 2000 x 2200mm High
BF - Entrance Elev. Lobbies

746413405.xlsx/Div- 8-Doors 7 windows/Page114


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 102,263.00

DOORS AND WINDOWS (CONT'D)

SECTION 08 81 00 - GLASS GLAZING

POWDER COATED ALUMINIUM


08-4
FRAMED FIXED GLASS PANELS

Single glazing glass wall system,


13.524mm total thickness laminated
clear float glass as per performance
specification. Contractor to submit shop
drawings for approval prior to
installation.

08-4-1 WB1; Fixed Glass Panels; Sets 3 4,590.00 13,770.00


Overall dim 1200 x 2250mm High
Overall dim 1200 x 2250mm High
BF - Office A & B Entrance Elev. Lobbies

08-4-2 WB2; Fixed Glass Panels; Sets 2 11,666.25 23,332.50


Overall dim 6100 x 2250mm High
BF - Office A & B Entrance Elev. Lobbies

08-4-3 WB3; Fixed Glass Panels; Sets 1 55,940.63 55,940.63


Overall dim 3600 x 2250mm High
Overall dim 2200 mm X 2250 mm High
Overall dim 23450 mm X 2250 mm High
BF - Office A Entrance Elev. Lobbies

08-4-4 WB5; Fixed Glass Panels; Sets 1 12,335.63 12,335.63


Overall dim 1875 X 2250 mm High
Overall dim 950 X 2250 mm High
Overall dim 1350 X 2250 mm High
Overall dim 2275 X 2250 mm High
BF - Hotel Service Appartment Elev. Lobby

08-4-5 WB6; Fixed Glass Panels; Sets 1 11,264.63 11,264.63


Overall dim 1900 X 2250 mm High
Overall dim 1340 X 2250 mm High
Overall dim 2650 X 2250 mm High
BF - Hotel Main Elev. Lobby

08-4-6 WB7; Fixed Glass Panels; Sets 1 20,941.88 20,941.88


Overall dim 1050 X 2250 mm High
Overall dim 6900 X 2250 mm High
Overall dim 3000 X 2250 mm High
BF - Hotel Service Ent. Elev. Lobby

746413405.xlsx/Div- 8-Doors 7 windows/Page115


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 137,585.25

DOORS AND WINDOWS (CONT'D)

08-4-7 WB8; Fixed Glass Panels; Sets 1 15,233.06 15,233.06


Overall dim 450 X 2250 mm High
Overall dim 1275 X 2250 mm High
Overall dim 6240 X 2250 mm High
BF - Retail Building 02 Ent. Elev. Lobby

08-4-8 WB8a; Fixed Glass Panels; Sets 1 15,041.81 15,041.81


Overall dim 630 X 2250 mm High
Overall dim 1275 X 2250 mm High
Overall dim 5960 X 2250 mm High
BF - Retail Building 01 Ent. Elev. Lobby

08-4-9 WB9; Fixed Glass Panels; Sets 2 18,312.19 36,624.38


Overall dim 4860 X 2250 mm High
Overall dim 2475 X 2250 mm High
Overall dim 1120 X 2250 mm High
Overall dim 1120 X 2250 mm High
BF - Cinema Building Ent. Elev. Lobby
BF - Leisure Building Ent. Elev. Lobby

08-4-10 WB11; Fixed Glass Panels; Sets 1 67,262.63 67,262.63


Overall dim 4170 X 2250 mm High
Overall dim 4410 X 2250 mm High
Overall dim 4410 X 2250 mm High
Overall dim 18250 X 2250 mm High
Overall dim 3930 X 2250 mm High
BF - Escalator Lobby

746413405.xlsx/Div- 8-Doors 7 windows/Page116


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 134,161.88

DOORS AND WINDOWS (CONT'D)

SECTION 08 14 00 - WOODEN DOORS &


FRAMES
SECTION 08 71 00 - DOOR HARDWARE

Supply and installation of timber door


with necessary acoustic and fire rating
requirement, including but not limited
to, all necessary frames, door panels,
lippings, architrave, finishes to doors,
paintings, ironmongeries and hardware,
and fixing accessories, as per Drawings
and Specification.
Ref: A-H-20 & A-H-21

Note:
All door hardwares shall be satin finish
stainless steel, Hadle to be lever type.
(to be supplied by YALE or approved
equal)
Security cylinder lock shall be provided
to all entrance & exit doors.
Dorma or approved equal heavy duty
door closer shall be provided to all
doors at toilet entrance

08-5 SOLID WOOD PANEL DOORS

1.5 hrs fire rating, Stained finish with Irish


Oak Color RAL 1011 or as per approved
sample to be submitted by contractor or
interior designer.

D03; Double Swing Door;


08-5-1 Sets 3 4,860.00 14,580.00
Overall dim 1800 x 2250mm High
B02 - Security Control/ Mgr. Room
B03 - IT Mgr./ Staff & Store Room
B04 - Main Server Room (Hotel)

D05; Double Swing Door;


08-5-2 Set 9 3,645.00 32,805.00
Overall dim 1350 x 2250mm High
B09 - Room
B10 - Utility/ Store Room

746413405.xlsx/Div- 8-Doors 7 windows/Page117


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 47,385.00

DOORS AND WINDOWS (CONT'D)

D08; Single Swing Door;


08-5-3 Sets 6 3,375.00 20,250.00
Overall dim 1250 x 2250mm High
B02 - MDB Rooms (2)
B02 - Control Room
B06 - Control Room
B05 - LC Room (IDF))
B11 - LC Room (IDF)

D09; Double Swing Door;


08-5-4 Set 4 4,320.00 17,280.00
Overall dim 1600 x 2250mm High
B02 - Office "B" Entrance

D10; Single Swing Door;


08-5-5 Sets 17 2,430.00 41,310.00
Overall dim 900 x 2250mm High
B02 - Main Server & CCTV Control
B02 - Store Room
B02 - Control Room
B02 - Facility Server/ LC Room
B02 - Security Control/ Mgr. Room (2)
B03 - IT Staff/ Mgr./ Store Room (3)
B05 - CRAC/ UPS Room (2)
B11 - LC Room (2)
Hotel Lobby (3)

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 8-Doors 7 windows/Page118


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 78,840.00

COLLECTIONS:

Division 08 : 1 / 6 158,175.00

Division 08 : 2 / 6 102,263.00

Division 08 : 3 / 6 137,585.25

Division 08 : 4 / 6 134,161.88

Division 08 : 5 / 6 47,385.00

Division 08 : 6 / 6 78,840.00

746413405.xlsx/Div- 8-Doors 7 windows/Page119


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA DOORS & WINDOWS WORKS
BUILDING : GENERAL BASEMENT DIVISION 08

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 658,410.13

746413405.xlsx/Div- 8-Doors 7 windows/Page120


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

INTERNAL WORKS:

FLOOR FINISHES

Supply & fix flooring finishes as per


approved material samples. Includes
post installation works for cleaning and
polishing and installation of protective
covering where required.
For all Finishes, the Contractor shall
submit samples for Engineer's approval
Color & layout as per Architect/ I.D.
specifications

SECTION 09 30 00 - TILING

09-1 PORCELAIN FLOOR TILES

Supply & installation of Porcelain Floor


Tiles. Work includes mortar screed, mortar
joint, bedding, waterproofing protection,
(M²) 1,508 175.00 263,900.00
floor levelling & all required applications,
complete prior to tiling. All in accordance
with drawings & specifications.
Size: 600 x 600 x 8.5 mm
Color: Light Beige tile

09-1-1 at Office Area (M²) 322 -


MDB Room 1 (B02) M² 110 -
MDB Room 2 (B02) M² 45 -
Main Server Room & CCTV (B02) M² 42 -
CCTV Control Room for security M² 47 -
EFTR Room M² 35 -
MTR Room (B05) M² 17 -
CRAC Room (B05) M² 17 -
LC Room (inside MDB Room 1) M² 9 -

09-1-2 at Hotel Area (M²) 438 -


Hallway (B01) M² 106 -
Security Control Room & Manager Room
M² 34 -
(B02)
MDB Room (B02) M² 41 -
IT Manager & Staff (B03) M² 34 -
Main Server Room (B04) M² 57 -
Crac & UPS Room (B05) M² 32 -
Store Room (B02) M² 30 -
Utility/Store Room (B10) M² 91 -
Security Room (B09) M² 13 -

746413405.xlsx/Div- 9 -Finishing/Page121
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 263,900.00

FINISHING WORKS (CONT'D)

09-1-3 at Retail Area (M²) 657 -


Private Sec., Control & Equip.Room (B02) M² 19 -
Facility Server Room/ LC (B02) M² 18 -
Storage (B02) M² 611 -
AV Control Room for Ampitheater M² 9 -

09-1-4 at Cinema Area (M²) 55 -


MDB Room (B02) M² 30 -
Control Room (B03) M² 25 -

09-1-5 at Leisure Area (M²) 36 -


MDB Room (B02) M² 30 -
LC Room - IDF (B05) M² 6 -

SECTION 09 96 00 - HIGH
PERFORMANCE COATING

Providing and finishing of homogenous


self leveling epoxy flooring of thickness
minimum 4mm with master top 1200 of
MBT degussa / ardex R70 P in approved
color after surface prparation by shot
blasting with vaccine attachment etc
complete the rate should be inclusive of
carrying out cove up to 100mm high into
the wall with solvent less epoxy
incorporating very high abrasion
resisant aggregates and merged with
wall levelling on one end floor on other.
Work includes cement sand screed,
floor levelling & maintaining slope.
Color as per approved sample and
Architect specifications.

EPOXY PAINT COATING INCLUDING


09-2
100mm SKIRTING

Supply & application of floor preparation


(M²) 39,896 60.00 2,393,760.00
and Epoxy paint (Gray)

09-2-1 Driveway & Parking (B12) (M²) 35,013 -

746413405.xlsx/Div- 9 -Finishing/Page122
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 2,393,760.00

FINISHING WORKS (CONT'D)

09-2-2 at Office Area (M²) 328 -


Generator Room (B06) M² 86 -
Fuel Tank Room (B07) M² 27 -
LC Room (B11) M² 9 -
Pump Room 1 (B11) M² 31 -
Pump Room 2 (B11) M² 26 -
Air Intake Room (B14) M² 43 -
Water Feature Equipment/Pump Room
M² 53 -
(B11)
Grey Water Treatment Irrigation Pump
M² 53 -
Room (B11)

09-2-3 at Hotel Area (M²) 391 -


Generator Room (B06) M² 76 -
Fuel Tank Room (B07) M² 28 -
Central Pump Room (B08) M² 100 -
Pump Room 1 (B11) M² 54 -
Pump Room 2 (B11) M² 33 -
Air Intake Room (B14) M² 40 -
Air Intake Room (B14) M² 60 -

09-2-4 at Retail Area (M²) 80 -


Air Intake Room (B14) - Ret. 01 & Ret. 02 M² 80 -

09-2-5 at Cinema Area (M²) 116 -


Generator Room (B11) M² 24 -
Fuel Tank Room (B11) M² 13 -
LC Room - IDF (B11) M² 6 -
Pump Room (B11) M² 34 -
Air Intake Room (B14) M² 39 -

09-2-6 at Leisure Area (M²) 132 -


Generator Room (B06) M² 24 -
Fuel Tank Room (B07) M² 13 -
Pump Room (B11) M² 33 -
Control Room (B06) M² 25 -
Air Intake Room (B14) M² 37 -

09-2-7 Elevated Walkways (M²) 3,836 -

746413405.xlsx/Div- 9 -Finishing/Page123
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION -

FINISHING WORKS (CONT'D)

09-3 PORCELAIN SKIRTING

Supply & installation of Porcelain Tile


skirting. Work includes cement sand
screed grouting, joints, dry set mortar or
(LM) 428 80.00 34,240.00
adhesive and all necessary ancillary
works. As per approved sample and
Architect specifications.
Manufacturer: PORCELANOSA
Size: 600 x 150 x 8.5 mm
Color: Light Beige tile

09-3-1 at Office Area (LM) 114 -


Main Server Room & CCTV (B02) LM 28 -
CCTV Control Room for security LM 29 -
EFTR Room LM 24 -
MTR Room (B05) LM 16 -
CRAC Room (B05) LM 17 -

09-3-2 at Hotel Area (LM) 260 -


Hallway (B01) LM 105 -
Security Control Room & Manager Room
LM 25 -
(B02)
IT Manager & Staff (B03) LM 24 -
Main Server Room (B04) LM 30 -
Utility/Store Room (B10) LM 45 -
Crac & UPS Room (B05) LM 31 -

09-3-3 at Cinema Area (LM) 20 -


Control Room (B02) LM 20 -

09-3-4 at Leisure Area (LM) 34 -


MDB Room (B02) LM 24 -
LC Room - IDF (B05) LM 10 -

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 9 -Finishing/Page124
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 34,240.00

FINISHING WORKS (CONT'D)

WALL FINISHES:

SECTION 09 24 00 - CEMENT
PLASTERING

09-4 CEMENT PLASTER - INTERIOR WALL

Supply and application of plastering


with average 20mm thick to attain fairly
and even smooth surfaces for painting
and other finishing works with complete
accessories including angle
beads,corner, mesh, etc.

Plastering to wall surfaces (To be


(M²) 5,815 35.00 203,525.00
painted)

09-4-1 at Office Area (M²) 1,462 -


MDB Room 1 (B02) M² 146 -
MDB Room 2 (B02) M² 118 -
Main Server Room & CCTV (B02) M² 86 -
CCTV Control Room for security M² 90 -
MTR Room (B05) M² 51 -
CRAC Room (B05) M² 53 -
EFTR Room M² 74 -
Generator Room (B06) M² 174 -
Fuel Tank Room (B07) M² 96 -
LC Room (inside MDB Room 1) M² 52 -
LC Room (B11) M² 52 -
Pump Room 1 (B11) M² 81 -
Pump Room 2 (B11) M² 74 -
Air Intake Room (B14) M² 120 -
Water Feature Equipment/Pump Room
M² 100 -
(B11)
Grey Water Treatment Irrigation Pump
M² 95 -
Room (B11)

09-4-2 at Hotel Area (M²) 2,326 -


Hallway (B01) M² 457 -
Security Control Room & Manager Room
M² 109 -
(B02)
MDB Room (B02) M² 113 -
Store Room (B02) M² 100 -
IT Manager & Staff (B03) M² 104 -

746413405.xlsx/Div- 9 -Finishing/Page125
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)


Main Server Room (B04) M² 131 -
Crac & UPS Room (B05) M² 135 -

TOTAL CARRIED TO COLLECTION 203,525.00

FINISHING WORKS (CONT'D)


Generator Room (B06) M² 161 -
Fuel Tank Room (B07) M² 100 -
Central Pump Room (B08) M² 187 -
Security Room (B09) M² 65 -
Pump Room 1 (B11) M² 135 -
Pump Room 2 (B11) M² 100 -
Utility/Store Room (B10) M² 165 -
Air Intake Room (B14) M² 121 -
Air Intake Room (B14) M² 143 -

09-4-3 at Retail Area (M²) 834 -


Private Security, Control & Equipment
M² 78 -
Room (B02)
Facility Server Room/ LC (B02) M² 74 -
Storage (B02) M² 420 -
AV Control Room for Ampitheater M² 39 -
Air Intake Room (B14) - Ret. 01 & Ret. 02 M² 223 -

09-4-4 at Cinema Area (M²) 597 -


MDB Room (B02) M² 105 -
Control Room (B03) M² 87 -
Generator Room (B11) M² 87 -
Fuel Tank Room (B11) M² 65 -
LC Room - IDF (B11) M² 44 -
Pump Room M² 100 -
Air Intake Room (B14) M² 109 -

09-4-5 at Leisure Area (M²) 596 -


MDB Room (B02) M² 104 -
LC Room - IDF (B05) M² 44 -
Control Room (B06) M² 87 -
Generator Room (B06) M² 87 -
Fuel Tank Room (B07) M² 65 -
Pump Room (B11) M² 101 -
Air Intake Room (B14) M² 108 -

Plastering to walls at driveway &


parking wall surfaces including columns (M²) 10,920 35.00 382,205.95
(To be painted)

09-4-6 Walls at Driveway & Parking M² 5,790 -

09-4-7 Columns M² 4,094 -

746413405.xlsx/Div- 9 -Finishing/Page126
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

09-4-8 Boundary Walls - (External & Internal) M² 1,036 -

TOTAL CARRIED TO COLLECTION 382,205.95

FINISHING WORKS (CONT'D)

CEMENT PLASTER - CEILING (UNDER


09-5
SLAB SOFFIT)

Plastering to under slab soffit surfaces


(M²) 2,182 40.00 87,280.00
(To be painted)

09-5-1 at Office Area (M²) 413 -


MDB Room 1 (B02) M² 110 -
MDB Room 2 (B02) M² 45 -
Generator Room (B06) M² 86 -
Fuel Tank Room (B07) M² 27 -
LC Room (inside MDB Room) M² 9 -
LC Room (B11) M² 9 -
Pump Room (B11) M² 31 -
Air Intake Room (B14) M² 43 -
Grey Water Treatment Irrigation Pump
M² 53 -
Room (B11)

09-5-2 at Hotel Area (M²) 435 -


MDB Room (B02) M² 41 -
Store Room (B02) M² 30 -
Generator Room (B06) M² 76 -
Fuel Tank Room (B07) M² 28 -
Central Pump Room (B08) M² 100 -
Room (B09) M² 13 -
Pump Room 1 (B11) M² 54 -
Pump Room 2 (B11) M² 33 -
Air Intake Room (B14) M² 60 -

09-5-3 at Retail Area (M²) 1,027 -


Private Security, Control & Equipment
M² 19 -
Room (B02)
Facility Server Room/ LC (B02) M² 18 -
Storage (B02) M² 611 -
AV Control Room for Ampitheater M² 9 -
Air Intake Room (B14) - Retail 01 & 02
M² 80 -
Area
09-5-4 at Cinema Area (M²) 145 -
MDB Room (B02) M² 30 -
Generator Room (B11) M² 24 -
Fuel Tank Room (B11) M² 13 -

746413405.xlsx/Div- 9 -Finishing/Page127
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)


LC Room - IDF (B11) M² 6 -
Pump Room M² 33 -
Air Intake Room (B14) M² 39 -

TOTAL CARRIED TO COLLECTION 87,280.00

FINISHING WORKS (CONT'D)

09-5-5 at Leisure Area (M²) 162 -


MDB Room (B02) M² 30 -
Control Room (B06) M² 25 -
Generator Room (B06) M² 24 -
Fuel Tank Room (B07) M² 13 -
Pump Room (B11) M² 33 -
Air Intake Room (B14) M² 37 -

SECTION 09 91 00 - PAINTING

Supply and application of washable


exterior acrylic anti-carbonation paint.
Complete with surface preparation
concealing of minor crack and minor
uneven surface to receive primer and
sealer coats to final finishing coats.
Color and texture to be as per approved
sample.

09-6 PAINTING WORKS

Painting Works for Cement Plaster Wall;


(M²) 53,194 35.00 1,861,790.00
Paint Finish, as per approved color

09-6-1 Painting to wall surfaces M² 5,815 -

Painting to walls at driveway & parking wall


09-6-2 M² 9,884 -
surfaces including columns

09-6-3 Painting to under slab soffit surfaces M² 1,892 -

09-6-4 Painting to Ceilings at driveway & parking M² 35,013 -

09-6-5 Painting to Gypsum Board Ceiling M² 590 -

09-6-6 Boundary Walls - (External & Internal) M² 1,036 -

09-7 EPOXY COATING

746413405.xlsx/Div- 9 -Finishing/Page128
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)


Apply & Installation of High performance
10mm Epoxy coating as per Drawings &
specifications.
Ref: ST-7.01 to ST-7.05

09-7-1 To mat foundation M² 50,565 40.00 2,022,600.00

TOTAL CARRIED TO COLLECTION 3,884,390.00

FINISHING WORKS (CONT'D)

To Internal surface
09-7-2 Horizontal & vertical face of the water M² 2,160 40.00 86,400.00
Tanks.

To External surface
09-7-3 M² 1,435 40.00 57,400.00
Vertical face of the water Tanks.

CEILING FINISHES:

SECTION 09 29 00 - GYPSUM BOARD


CEILING

Supply and installation of Gypsum


board suspended ceiling on galvanized
steel suspension frame system,
complete with fittings & accessories.
Provisions of access panels shall be
coordinated with site Engineer.

09-8 GYPSUM BOARD CEILING

Gypsum Board Ceiling in Painted Finish (M²) 590 75.00 44,250.00

09-8-1 at Office Area (M²) 192 -


Main Server Room & CCTV (B02) M² 42 -
CCTV Control Room for security M² 47 -
EFTR Room M² 35 -
Crac & UPS Room (B05) M² 34 -
MTR Room (B05) M² 17 -
CRAC Room (B05) M² 17 -

09-8-2 at Hotel Area (M²) 367 -


Hallway (B01) M² 106 -
Security Control Room & Manager Room
M² 34 -
(B02)
IT Manager & Staff (B03) M² 34 -
Main Server Room (B04) M² 57 -
Crac & UPS Room (B05) M² 32 -
Utility/Store Room (B10) M² 91 -

746413405.xlsx/Div- 9 -Finishing/Page129
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)


Security Room (B09) M² 13 -

09-8-3 at Cinema Area (M²) 25 -


Control Room (B02) M² 25 -

09-8-4 at Leisure Area (M²) 6 -


LC Room - IDF (B05) M² 6 -

TOTAL CARRIED TO COLLECTION 188,050.00

COLLECTIONS:

DIVISION 09 : 1 / 9 263,900.00

DIVISION 09 : 2 / 9 2,393,760.00

DIVISION 09 : 3 / 9 -

DIVISION 09 : 4 / 9 34,240.00

DIVISION 09 : 5 / 9 203,525.00

DIVISION 09 : 6 / 9 382,205.95

DIVISION 09 : 7 / 9 87,280.00

DIVISION 09 : 8 / 9 3,884,390.00

DIVISION 09 : 9 / 9 188,050.00

746413405.xlsx/Div- 9 -Finishing/Page130
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FINISHING WORKS
BUILDING : GENERAL BASEMENT DIVISION 09

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 7,437,351.00

746413405.xlsx/Div- 9 -Finishing/Page131
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA SPECIALTIES
BUILDING : GENERAL BASEMENT DIVISION 10

No. Description Unit Qty Price Amount (SR)

SECTION 10 26 13 - CORNER GUARDS

10-1 COLUMN CORNER GUARDS

Supply and installation of pre -painted


rubber column guard with black &
yellow color or as per approved sample
in accordance with drawings &
specifications.

10-1-1 800mm High Column Corner Guard Nos 1,767 50.00 88,350.00

SECTION 10 26 16 - BUMPER GUARDS

10-2 WALL BUMPER GUARDS

Supply and installation of 30mm pre -


painted rubber wall bumper guards with
black & yellow color or as per approved
sample in accordance with drawings &
specifications.

10-2-1 300mm High wall bumper Guard LM 290 250.00 72,500.00

SECTION 10 14 00 - SIGNAGES

10-4 WAYFINDING AND SIGNAGE

Supply, fabrication and installation of


signage panel; including but not limited
to; surface engraved graphics,
illuminations, applied vinyl lettering; any
types mounting methods, anchors,
inserts, fastners, adhesives, tapes and
the like; all in accordance with Drawings
and Specifications;

Interior Signages

10-4-1 FOH Identification Nos 6 300.00 1,800.00

10-4-2 Level Identification Nos 12 620.00 7,440.00

10-4-3 BOH Room ID Nos 57 100.00 5,700.00

10-4-4 Level Directory Nos 5 1,000.00 5,000.00

746413405.xlsx/Div- 10-Specialities/Page132
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA SPECIALTIES
BUILDING : GENERAL BASEMENT DIVISION 10

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 180,790.00

SPECIALTIES (CONT'D)

Car Park Signages

10-4-5 Suspended Directional Nos 25 3,250.00 81,250.00

10-4-6 HC Floor Marking /EV Nos 44 15.00 660.00

10-4-7 HC Post Nos 22 750.00 16,500.00

10-4-8 Main ID Nos 1 5,000.00 5,000.00

Code & Regulatory

10-4-9 Lift Fire Warning Nos 13 200.00 2,600.00

10-4-10 Fire Egress Map Nos 10 400.00 4,000.00

10-4-11 Fire Exit Stair Well Nos 10 250.00 2,500.00

10-4-12 Stair Door -FOH Nos 5 300.00 1,500.00

10-4-13 Stair Door -BOH Nos 6 200.00 1,200.00

10-4-14 Glass Manifestation Nos 10 7,000.00 70,000.00

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 10-Specialities/Page133
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA SPECIALTIES
BUILDING : GENERAL BASEMENT DIVISION 10

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 185,210.00

COLLECTIONS:

DIVISION 10 : 1 / 2 180,790.00

DIVISION 10 : 2 / 2 185,210.00

746413405.xlsx/Div- 10-Specialities/Page134
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA SPECIALTIES
BUILDING : GENERAL BASEMENT DIVISION 10

No. Description Unit Qty Price Amount (SR)


TOTAL TO SUMMARY 366,000.00

746413405.xlsx/Div- 10-Specialities/Page135
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EQUIPMENT
BUILDING : OFFICE DIVISION 11

No. Description Unit Qty Price Amount (SR)

SECTION 11 80 00 - FACILITY
MAINTENANCE & OPERATION SYSTEM

11-1 BMUSYSTEM

These areas can be accessed by the 2-


meter Cradle/Platform suspended from the
Roof BMU Trolley with twin rail tracks and
support steel brackets installed on the
parapet wall as required & shown in the
concept drawings.

At Upper Roof level

BMU System Item 1 1,245,248.00

GinD SJ-0418; Vertical run of max 35 m.


Parapet mounted BMU. Traversing
machine on tracks. Motorized steel wheels.
SWL 240 kg. No Auxiliary Hoist AH.
11-1-1 Slewing motorized jib and head. No 1 Included
Pantographic system for recess area.
Reeler electric cable. Galvanized and
painted. Restraint system: Not required
Design standard, EN-1808

Rail tracks – Upper Profile (UPN-180)


11-1-2 No 596 Included
Lower Profile (HEB-180)

11-1-3 Steel support brackets for both track Included

11-1-4 Anchor bolts & Epoxy mortar Included

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.
TOTAL CARRIED TO COLLECTION 1,245,248.00

COLLECTIONS:

DIVISION 11 : 1 / 1 1,245,248.00
TOTAL TO SUMMARY 1,245,248.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EQUIPMENT
BUILDING : HOTEL DIVISION 11

No. Description Unit Qty Price Amount (SR)

SECTION 11 80 00 - FACILITY
MAINTENANCE & OPERATION SYSTEM

11-1 MONORAIL SYSTEM

These areas can be accessed by the 2-


meter Cradle/Platform suspended from the
aluminium rail supported by steel brackets
installed on the parapet wall as required &
shown in the concept drawings.

At 7th floor Roof level

Monorail System Item 1 338,484.00

11-1-1 SSF Aluminium monorail (straight/bends) 302 Included

Support brackets (face mounted) – Hot Dip


11-1-2 No 124 Included
galvanized

11-1-3 M16x190 Anchor Bolts & Epoxy mortar Included

11-1-4 SSF Motorized Travelling Trolley Pair 1 Included

European 8.3 mm diameter galvanized


11-1-5 LM 160 Included
steel wire rope:
Lifting wire ropes: 2 Lengths.
Safety wire ropes: 2 Lengths

2.0M cradle powered with European


Traction Hoists, safety bloc stop, motorized
wire rope releer, main power cable and
11-1-6 No 1 Included
having Safe working load of 240kg,
Designed, engineered, manufactured to
EN1808. (Fixator, Made in France)
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 338,484.00

COLLECTIONS:

DIVISION 11 : 1 / 1 338,484.00
TOTAL TO SUMMARY 338,484.00
Remarks
Remarks
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FURNISHING
BUILDING : GENERAL GROUND FLOOR DIVISION 12

No. Description Unit Qty Price Amount (SR)

SECTION 12 93 00 - SITE FURNISHING


(LANDSCAPE)

12-1 SEAT PLANTER


Installation of Seat Planter with porcelain
tile coping and cladding , light beige flamed
finish, complete; all in accordance with
drawings and specifications.
at GF
References:
Seat Planter, X1B9-FS-010 (G)
12-1-1 Seat Type 01 FS-010 No. 25 2,000.00 50,000.00

12-2 BENCH
Installation of Bench, complete; all in
accordance with drawings and
specifications.
at Podium Level (Office & Hotel Bldg.)
References:
Bench Typical Detail, X1B9-FS-040 (E)
12-2-1 Seat Type 01 FS-040 No. 13 2,000.00 26,000.00

12-3 PLAY EQUIPMENT


Supply and installation of Furniture &
Equipment, complete; all in accordance
with drawings and specifications.
at GF
References:
12-3-1 FS-080 - Bike Rack No. 3 2,000.00 6,000.00

As Client's Selection

12-3-2 Play Equipment Type 01 FU-50 No. 1 4,000.00 4,000.00


Ref. : X1B9-FU-050 (E)

12-3-3 Play Equipment Type 02 FU-060 No. 1 4,000.00 4,000.00


Ref. : X1B9-FU-060 (E)

12-3-4 Play Equipment Type 03 FU-070 No. 1 4,000.00 4,000.00


Ref. : X1B9-FU-070 (E)
TOTAL CARRIED TO COLLECTION 94,000.00

FURNISHING (CONT'D)

at Podium Pool Level (Hotel Bldg.)


As Client's Selection
12-3-5 Sun Bed Pool Deck Chair FU-010 No. 7 4,000.00 28,000.00

12-3-6 Umbrella FU-020 No. 7 4,000.00 28,000.00

Table & Chair FU-030


12-3-7 2-Seater No. 7 500.00 3,500.00

12-3-8 4-Seater No. 3 500.00 1,500.00

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.
TOTAL CARRIED TO COLLECTION 61,000.00

COLLECTIONS:

DIVISION 12 : 1 / 2 94,000.00

DIVISION 12 : 2 / 2 61,000.00
TOTAL TO SUMMARY 155,000.00
Remarks
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA SPECIAL CONSTRUCTION
BUILDING : GENERAL GROUND FLOOR DIVISION 13

No. Description Unit Qty Price Amount (SR)

SECTION 13 34 00 - FABRICATED
ENGINEERED STRUCTURES

13-1 CENTRAL RETAIL (PAVILION)

The detail of the Central Retail


structures shall be provided by the
structural specialist as per drawings &
specifications for the Engineer's
approval. The structures including
Roofing, ceiling, steel framing retails, F
& B leisure, landscape, outside terrace
with escalator and elevators, etc
(measured elsewhere).
Ref: A-M-01, A-M-02, A-M-03, A-M-04 &
A-M-05

13-1-1 Central Retail 01 - 266 m² M² 266 800.00 212,800.00


includes Retail & Outer Terrace w/
Landscape

13-1-2 Central Retail 02 - 940 m² M² 940 800.00 752,000.00


includes Retails, Retail / F&B Leisure,
Outer Terrace with Landscape, Escalator &
Elevator

13-1-3 Central Retail 03 - 709 m² M² 709 800.00 567,200.00


includes Retail / F&B Leisure & Outer
Terrace with Landscape

Note: Pavilion Structure & Detail by


Structural Specialist

13-2 AMPHITHEATRE - LANDSCAPE

Amphitheatre shall be constructed with


steel step stairs, the seating / steps
comprise with landscape finishes
materials as per the drawings &
specifications. (shop drawings must be
submitted prior to installatios for the
Engineer's approval)
Ref: ST-3.52 & A-M-08

13-2-1 Amphitheater Detail, X1B9-BS-010 (C) M² 433 500.00 216,500.00


TOTAL CARRIED TO COLLECTION 1,748,500.00

SPECIAL CONSTRUCTION (CONT'D)

13-3 WATER FEATURE - LANDSCAPE

Construction of Water Feature,


complete; all in accordance with
drawings and specifications.

13-3-1 Water Feature BW-010 M² 122 3,000.00 366,000.00


Water Feature Detail, X1B9-BW-010 (G)

13-3-2 Entrance Water Feature BW-020 M² 78 2,500.00 195,000.00


Water Feature Detail, X1B9-BW-010 (E)

13-3-3 Water Feature BW-030 M² 86 3,000.00 258,000.00

13-3-4 Water Feature BW-030B M² 82 3,000.00 246,000.00

13-3-5 Water Feature BW-030C M² 37 3,000.00 111,000.00


Water Feature Detail, X1B9-BW-030 (F)

13-4 SWIMMING POOL - LANDSCAPE

Construction of Swimming Pool, including


concrete works, light weight structural infill,
etc. complete; all in accordance with
drawings and specifications.
Ref.: X1B9-AC-801 (E)
Ref.: X1B9-BW-040 (B)/ X1B9-BS-040 (B)
Ref.: X1B9-BW-050 (A)/ X1B9-BS-050 (A)
Ref.: X1B9-BW-060 (A)/ X1B9-BS-060 (A)

Application of 100mm Thk. Gunite as


13-4-1 M³ 128
Pool Specialist

Supply & Installation of SS 316 Grade


Drain Channel Grating with SS 316 Grade
13-4-2 Grating Support Bracket, fixed to RCC LM 20
structure with 33 316 Grade Mechanical
Anchor Bolts

Supply & Installation of 50mm x 50mm x


13-4-3 10mm thk. Mosaic Tile, emerald color in M² 194
glazed finish
Supply & Installation of 250mm x 300mm x
13-4-4 20mm thk. Paving Edge Porcelain Tile, M² 7
medium beige color in flamed finish.

TOTAL CARRIED TO COLLECTION 1,176,000.00

SPECIAL CONSTRUCTION (CONT'D)

Supply & Installation of 250mm x 300mm x


13-4-4 20mm thk. Paving Edge Porcelain Tile, M² 7
medium beige color in flamed finish.

Supply & Installation of 200mm x 300mm x


13-4-5 20mm thk. Coping & Cladding Porcelain M² 34
Tile, dark beige color in flamed finish.

Supply and installation of Pool Ladder,


13-4-6 complete; all in accordance with drawings
and specifications.
Ref.: X1B9-FU-040 (E)
FU-040 - Pool Ladder No 1 2,000.00 2,000.00

13-5 PLANTER WALL - LANDSCAPE


Construction of Planter Wall, complete; all
in accordance with drawings and
specifications.
References:
Planter Wall Detail, X1B9-EW-010 (G)
Planter Wall Detail, X1B9-EW-020 (F)
Planter Wall Detail, X1B9-EW-030 (F)
Planter Wall Detail, X1B9-EW-040 (F)
at GF
13-5-1 Wall Type 01 EW-010 LM 25 150.00 3,750.00

13-5-2 Wall Type 02 EW-020 LM 328 150.00 49,200.00

13-5-3 Wall Type 03 EW-030 LM 140 150.00 21,000.00

13-5-4 Wall Type 04 EW-040 LM 119 150.00 17,850.00

13-6 STEPS - LANDSCAPE


Construction of Porcelain tiles Steps with
Light Beige color, complete; all in
accordance with drawings and
specifications.
References:
Stair Detail, X1B9-ES-010 (F)
at GF
13-6-1 Step Type 01 ES-010 M² 209 500.00 104,500.00

Stair Detail, X1B9-ES-020 (F)


at Pool Level
13-6-2 Step Type 01 ES-020 M² 12 500.00 6,000.00
TOTAL CARRIED TO COLLECTION 204,300.00

SPECIAL CONSTRUCTION (CONT'D)

13-7 STEPS (GF) - LANDSCAPE


Construction of Porcelain tiles Steps with
Light Beige color, complete; all in
accordance with drawings and
specifications.

Threads
13-7-1 300mm (W) x 1800mm (L) No 12 350.00 4,200.00

13-7-2 300mm (W) x 2000mm (L) No 10 350.00 3,500.00

13-7-3 300mm (W) x 3200mm (L) No 6 500.00 3,000.00

13-7-4 300mm (W) x 1500mm (L) No 7 350.00 2,450.00

13-7-5 300mm (W) x 1450mm (L) No 3 350.00 1,050.00

13-7-6 400mm (W) x 4000mm (L) No 3 450.00 1,350.00

13-7-7 300mm (W) x 5000mm (L) No 4 500.00 2,000.00

Risers
13-7-8 150mm (H) x 1800mm (L) No 16 200.00 3,200.00

13-7-9 150mm (H) x 2000mm (L) No 10 200.00 2,000.00

13-7-10 150mm (H) x 3200mm (L) No 8 250.00 2,000.00

13-7-11 150mm (H) x 1500mm (L) No 8 200.00 1,600.00

13-7-12 150mm (H) x 1450mm (L) No 4 200.00 800.00

13-7-13 150mm (H) x 4000mm (L) No 4 300.00 1,200.00

13-7-14 150mm (H) x 5000mm (L) No 6 400.00 2,400.00

13-7-15 Handicap Ramp M² 60 350.00 21,000.00

13-8 GREEN WALL - LANDSCAPE


Construction of Green Wall, complete; all
in accordance with drawings and
specifications.
Ref.: X1B9-EW-050 (B)
at GF
13-8-1 Green Wall EW-050 m² 24 150.00 3,600.00

TOTAL CARRIED TO COLLECTION 55,350.00


SPECIAL CONSTRUCTION (CONT'D)

SECTION 13 31 00 - FABRIC STRUCTURES

13-9 SHADE STRUCTURE - LANDSCAPE

Supply and installation of Fabric Shade


Structure on supporting steel members
powder coated off-white matt finish,
complete; all in accordance with drawings
and specifications.
at Podium Level (Hotel Bldg.)
References:
13-9-1 Shade Structure Detail, X1B9-BE-010 (B) M² 105 550.00 57,750.00
Shade Structure Type 01 BE-010

NOTE: All relevant work requirements


must be coordinated to the project
manager to complete the work.

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 57,750.00


COLLECTIONS:

DIVISION 13 : 1 / 5 1,748,500.00

DIVISION 13 : 2 / 5 1,176,000.00

DIVISION 13 : 3 / 5 204,300.00

DIVISION 13 : 4 / 5 55,350.00

DIVISION 13 : 5 / 5 57,750.00

TOTAL TO SUMMARY 3,241,900.00


Remarks
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : GENERAL GROUND FLOOR DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (2 stops)


14-1-1 Load 2000 KGS No 2 ### 200,000.00
Speed 1 m/s

Passenger Escalator
14-1-2 No 2 ### 300,000.00
Speed 0.5 m/s

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.
TOTAL CARRIED TO COLLECTION 500,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 500,000.00
TOTAL TO SUMMARY 500,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : OFFICE DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (9 stops)


14-1-1 Load 1600 KGS No 4 ### 800,000.00
Speed 1 m/s

Passenger Elevator (10 stops) (2 DOOR)


14-1-2 Load 1600 KGS No 2 ### 400,000.00
Speed 1 m/s
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 1,200,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 1,200,000.00
TOTAL TO SUMMARY 1,200,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : HOTEL DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and ### -
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)
Refer to:Lift & Escalator Schedule
(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (10 stops)


14-1-1 Load 1600 KGS No 6 ### 1,080,000.00
Speed 1 m/s

Passenger Elevator (11 stops)


14-1-2 Load 1600 KGS No 1 ### 180,000.00
Speed 1 m/s
Passenger Elevator (11 stops) (2 DOOR)
14-1-3 Load 1600 KGS No 1 ### 180,000.00
Speed 1 m/s

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 1,440,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 1,440,000.00
TOTAL TO SUMMARY 1,440,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : CINEMA DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (4 stops)


14-1-1 Load 1600 KGS No 1 ### 150,000.00
Speed 1 m/s

Passenger Escalator
14-1-2 No 2 ### 300,000.00
Speed 0.5 m/s
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 450,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 450,000.00
TOTAL TO SUMMARY 450,000.00

BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : RETAIL 1 DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and ### -
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (4 stops)


14-1-1 Load 1600 KGS No 2 ### 360,000.00
Speed 1 m/s
Passenger Escalator
14-1-2 No 4 ### 720,000.00
Speed 0.5 m/s

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL TO SUMMARY 1,080,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 1,080,000.00
TOTAL TO SUMMARY 1,080,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : RETAIL 2 DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (4 stops)


14-1-1 Load 1600 KGS No 2 ### 360,000.00
Speed 1 m/s

Passenger Escalator
14-1-2 No 4 ### 800,000.00
Speed 0.5 m/s
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 1,160,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 1,160,000.00
TOTAL TO SUMMARY 1,160,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA CONVEYING SYSTEM
BUILDING : LEISURE DIVISION 14

No. Description Unit Qty Price Amount (SR)

SECTION 14 24 00 - ELEVATORS
SECTION 14 31 00 - ESCALATORS

14-1 ELEVATORS & ESCALATORS

Supply, Install, Testing &


Commissioning and handing over of
electric vertical elevators and Escalators
complete with all rquired ARCH/ID
finishes, safety requirements,
supervising / monitoring /control system
and all necessary material and
requirements for perfect installation &
operation as per Interior design,
specifications and drawings.
(Machine Roomless)
(elevators to be Supporting Wheel Chair
Access Features)

Refer to:Lift & Escalator Schedule


(A-M-07)

NOTE: Work includes all relevant works


such as, structural, MEP, finishing and
all necessary requirements for perfect
installation & operation with full
coordination between all disciplines.

Passenger Elevator (4 stops)


14-1-1 Load 1600 KGS No 1 ### 180,000.00
Speed 1 m/s

Passenger Escalator
14-1-2 No 2 ### 300,000.00
Speed 0.5 m/s
NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 480,000.00

COLLECTIONS:

DIVISION 14 : 1 / 1 480,000.00
TOTAL TO SUMMARY 480,000.00
Remarks

Ref UAE Rates

Ref UAE Rates


Remarks

Ref UAE Rates

Ref UAE Rates


Remarks

194,400,000,000.00
194,400,000,000.00

-
-

Remarks
Remarks
Remarks
Remarks
6,310,000.00
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)

SECTION 21 11 00 - FIRE SUPPRESSION


PIPING SYSTEMS

21-1 FIRE SPRINKLER SYSTEMS

Supply of Fire Hose cabinet Class III type


Listed and approved Surface Mounted type
complete with all necessary fittings and
21-1-1 Nos 49 4,500.00 220,500.00
accessories in accordance with the
specification and drawings and
relevant authority regulations.

Seamless black steel pipe sch 40 and


fittings, including, grouting, protective
wrapping, trenching, bedding and
backfilling, hangers & support complete
pipework including fittings & support
21-1-2 300 mm dia. LM 20 660.00 13,200.00

21-1-3 200 mm dia. LM 300 440.00 132,000.00

21-1-4 150 mm dia. LM 200 380.00 76,000.00

21-1-5 100 mm dia. LM 1,900 320.00 608,000.00

21-1-6 75mm dia. LM 180 255.00 45,900.00

21-1-7 65 mm dia. LM 350 235.00 82,250.00

21-1-8 50 mm dia. LM 2,500 190.00 475,000.00

21-1-9 40 mm dia. LM 2,275 155.00 352,625.00

21-1-10 32 mm dia. LM 1,650 135.00 222,750.00

21-1-11 25 mm dia. LM 4,700 115.00 540,500.00

Hot dip galvanized steel pipe sch 40 and


fittings, including, grouting, protective
wrapping, trenching, bedding and
backfilling, hangers & support complete
pipework including fittings & support

21-1-12 200 mm dia for external Pipe for fire LM 950 500.00 475,000.00
Hydrants

21-1-13 150 mm dia LM 100 350.00 35,000.00

21-1-14 100 mm dia LM 400 230.00 92,000.00

21-1-15 75 mm dia LM 80 180.00 14,400.00

746413405.xlsx/Div- 21-Firefighting /Page322


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 3,385,125.00

FIRE FIGHTING SYSTEMS (CONT'D)

Sprinkler System listed and approved ,


sensitive bulb type, temperature rating to
relevant zones and application as per the
relevant authority regulations all in
accordance with the specifications and
drawings.
21-1-16 Pendant type Sprinkler Head Nos 30 55.00 1,650.00

21-1-17 Standard Upright Sprinkler Head Nos 3,552 50.00 177,600.00

Automatic Zone Check System Supply


and installation of automatic zone check
system complete with flow switch with
alarm, pressure gauges, test drain valve,
gate valve with supervisory switch, all in
accordance with the specifications and
drawings.

21-1-18 Zone control valve,150 mm diameter Nos 6 1,850.00 11,100.00

21-1-19 Zone control valve,100 mm diameter Nos 7 1,850.00 12,950.00

21-1-20 Pressure Reducing Valve 150mm diameter Nos 5 1,850.00 9,250.00

21-1-21 Pressure Reducing Valve 100mm diameter Nos 7 1,850.00 12,950.00

21-1-22 Pressure Reducing Valve 65mm diameter NO 49 4,500.00 220,500.00

21-1-23 ALARM CHECK VALVE 300 mm diameter Nos 2 1,850.00 3,700.00

21-1-24 ALARM CHECK VALVE 200 mm diameter Nos 2 1,850.00 3,700.00

Supply and installation of isolation valves,


complete with valve socket, and all
necessary fittings and accessories, all in
accordance with the specifications and
drawings.
21-1-25 65mm dia, Isolation Valve NO 49 1,850.00 90,650.00

746413405.xlsx/Div- 21-Firefighting /Page323


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 544,050.00

FIRE FIGHTING SYSTEMS (CONT'D)

SECTION 21 12 00 - FIRE SUPPRESSION


STAND PIPE SYSTEMS

21-2 FIRE EXTINGUISHERS

Fire Extinguishers

Supply of listed and approved fire


extinguishers,complete with wall brackets
and supports, all in accordance with the
specifications and drawings and relevant
authority regations.
21-2-1 5 kg CO2 (portable) NO 25 400.00 10,000.00

21-2-2 6 kg class ABC, Dry Chemical (portable) NO 58 400.00 23,200.00

SECTION 21 30 00 - FIRE PUMPS

21-3 FIRE WATER PUMPING STATION

Electric Pump

Supply of the fire fighting electric pump


UL listed electric driven motor pump
along with Base frame, controller and
control panel, all valves and guages all
in accordance with the specifications
and drawings and the concerned
authority regulations.

Set 1,1000GPM @ 15 Bar, Installation of


complete electric pump system for the fire
fighting water pressurization, UL listed and
including electric driven motor pump, pipe
21-3-1 connections, main fire alarm check valve, Nos 1 554,000.00 554,000.00
flow meter, OS & Y valves, check valves ,
gate valves with temper switch, wirring
control and all necessary accessories all as
specified and as shown on drawings.

746413405.xlsx/Div- 21-Firefighting /Page324


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 587,200.00

FIRE FIGHTING SYSTEMS (CONT'D)

Diesel Pump

Supply of UL listed diesel pump, Base


frame,controller, control panel dialy fuel
tank , all in accordance with the
specifications and drawings and the
concerned authority regulations.

Set 1000 GPM @ 15 Bar, Installation of


complete diesel pump system for the fire
fighting water pressurization UL listed and
including diesel pump, pipe connections,
pressure relief valve, OS & Y valves, check
21-3-2 valves gate valves with tamper switches, Nos 1 Included
sensing lines, controller dialy fuel tank with
necessary accessories, fuel pipes , vent
pipes and valves , black steel chimney and
all necessary accessories all as specified
and shown on drawings.

Jockey fire pump

Supply of UL listed and jockey fire


pump, including the base frame,
controller and control panel , all in
accordance with specifications and
drawings and relevant authority
regulations.

Set 1, 100 GPM @ 15 Bar , Installation of


complete jockey pump system for the fire
fighting water pressurization UL listed and
including jockey fire pump, pipe
21-3-3 connections, main fire OS & Y valves, Nos 1 Included
check valves and with temper switches,
sensing lines, electirc and control all in
accordance with the specifications and
drawings and relevant authority regulations.

746413405.xlsx/Div- 21-Firefighting /Page325


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)


NB: Fire pump capacity and head shall
be provided by contractor as required
by local authority regulations. Allow for
complete fire fighting system testing,
commisioning & balancing as required
by the authorities and for the
satisfaction of the client.

TOTAL CARRIED TO COLLECTION -

FIRE FIGHTING SYSTEMS (CONT'D)

21-4 SYSTEM FM 200

SYSTEM FM 200 Contain / Nozzle,


FM200 Cylinder, Valve Actuator, Flame
Detector, Rate of Rise Heat Detector,
Optical Smoke Detector, Ionisation
Smoke Detector, Fixed Temperature
Heat Detector, Releasing Control Panel,
Manual Release, Abort Switch, Actoator,
Horn Strobe, Warning Sign, Pressure
Switch.
21-4-1 LC Room - Office M³/KG 18 17,800.00

21-4-2 Server Room - Office M³/KG 83 35,000.00

21-4-3 LC Room - Office M³/KG 24 17,800.00

Private Security & Control Equipment


21-4-4 M³/KG 33 17,800.00
Room - Office

21-4-5 Facility Server Room / LC Room - Office M³/KG 33 17,800.00

21-4-6 LC Room (IDF) - Cinema M³/KG 11 17,800.00

21-4-7 Control Room - Cinema M³/KG 48 23,000.00

21-4-8 LC Room (IDF) - Leisure M³/KG 11 17,800.00

21-4-9 Control Room - Leisure M³/KG 48 23,000.00

21-5 SYSTEM FOAM

746413405.xlsx/Div- 21-Firefighting /Page326


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)

SYSTEM FOAM Contain / Nozzle, FOAM


Cylinder, Valve Actuator, Flame
Detector, Rate of Rise Heat Detector,
Optical Smoke Detector, Ionisation
Smoke Detector, Fixed Temperature
Heat Detector, Releasing Control Panel,
Manual Release, Abort Switch, Actoator,
Horn Strobe, Warning Sign, Pressure
Switch.
21-5-1 Fuel Tank Room - Office M³ 83 45,000.00

21-5-2 Fuel Tank Room - Cinema M³ 42 Included

21-5-3 Fuel Tank Room - Leisure M³ 42 Included

TOTAL CARRIED TO COLLECTION 232,800.00

FIRE FIGHTING SYSTEMS (CONT'D)

21-6 SYSTEM CO

SYSTEM CO Contain / Nozzle, Valve


Actuator, Flame Detector, Rate of Rise
Heat Detector, Optical Smoke Detector,
Ionisation Smoke Detector, Fixed
Temperature Heat Detector, Releasing
Control Panel, Manual Release, Abort
Switch, Actoator, Horn Strobe, Warning
Sign, Pressure Switch.
21-6-1 MDB Room - Office M³/KG 483 45,000.00

21-6-2 MDB Room - Office M³/KG 179 35,000.00

21-6-3 Generator Room - Office M³/KG 433 45,000.00

21-6-4 MTR Room - Office M³/KG 77 30,000.00

21-6-5 MDB Room - Cinema M³/KG 135 35,000.00

21-6-6 Generator Room - Cinema M³/KG 108 35,000.00

21-6-7 MDB Room - Leisure M³/KG 135 35,000.00

21-6-8 Generator Room - Leisure M³/KG 108 35,000.00

21-7 DIESEL TANK

746413405.xlsx/Div- 21-Firefighting /Page327


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)


One 50mm Fuel Neck.,Screw cap,Comes
fully Baffled.,10mm Outlet Breather.,Comes
21-7-1 complete with a Sender unit.,2 x Straps for Nos 1 Included
mounting.,Made out of 3mm aluminium for
extra strength and safety. (10 GALLONS)

21-8 FLOW METER

Supply and installation of UL listed Flow


meter complete with all accessories, all in
21-8-1 Nos 1 7,000.00 7,000.00
accordance with the specifications and
drawings

TOTAL CARRIED TO COLLECTION 302,000.00

FIRE FIGHTING SYSTEMS (CONT'D)

21-9 GENERAL

TESTING, ADJUSTING, AND


BALANCING OF MEP SYSTEMS

Allow for Starting up pressure testing,


complete testing and commissioning for
all Fire fighting system, including all
necessary preperations and attendance
for authority approvals.

Allow for BMS system to interface with Fire


21-9-1 Item 1 3,000.00 3,000.00
fighting system

Allow for drawing, manuals, approvals &


21-9-2 Item 1 3,000.00 3,000.00
instruction books.

21-9-3 Allow for protective and decorative painting Item 1 3,000.00 3,000.00

The contractor to list here and price any


items shown in the drawings, mentioned in
the specifications or required for the
21-9-4 satisfactory completion of this section as Item 1 3,000.00 3,000.00
per the relevant authority regulations, but
not mentioned here. Any such item not
listed is deemed to be included

746413405.xlsx/Div- 21-Firefighting /Page328


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA FIRE FIGHTING SYSTEMS
BUILDING : GENERAL BASEMENT DIVISION 21

No. Description Unit Qty Price Amount (SR)


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 12,000.00

COLLECTIONS:

DIVISION 21 : 1 / 7 3,385,125.00

DIVISION 21 : 2 / 7 544,050.00

DIVISION 21 : 3 / 7 587,200.00

DIVISION 21 : 4 / 7 -

DIVISION 21 : 5 / 7 232,800.00

DIVISION 21 : 6 / 7 302,000.00

DIVISION 21 : 7 / 7 12,000.00

TOTAL TO SUMMARY 5,063,175.00

746413405.xlsx/Div- 21-Firefighting /Page329


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

SECTION 22 14 13 - FACILITY STORM


DRAINAGE SYSTEMS

22-1 uPVC PIPES

Pipe and Fitting Materials Drainage


pipes & non pressurized pipe lines

Supply, install, test, commission and hand


over of UPVC Class 4 (PN 10) pipes
including all fittings, COs, vent cowls
covers, supports and all accessories
required to complete work in accordance
with project specifications and drawings.

22-1-1 50 mm dia LM 600 69.00 41,400.00

22-1-2 75 mm dia LM 850 95.00 80,750.00

22-1-3 110 mm dia LM 1,600 118.00 188,800.00

22-1-4 160 mm dia LM 1,800 185.00 333,000.00

22-1-5 200 mm dia LM 750 243.00 182,250.00

22-1-6 250 mm dia LM 300 289.00 86,700.00

WATER SUPPLY PIPES & GRAY WATER


22- 2
PIPES & PRESSURIZED PIPE LINES

Supply, install, test, commission and hand


over of UPVC Class 5 (PN 16) pipes
including all fittings, supports and all
accessories required to complete work in
accordance with project specifications and
drawings.

22-2-1 20 mm dia LM 200 35.00 7,000.00

22-2-2 25 mm dia LM 900 45.00 40,500.00

22-2-3 32 mm dia LM 450 55.00 24,750.00

22-2-4 40 mm dia LM 170 75.00 12,750.00

22-2-5 50 mm dia LM 2,400 85.00 204,000.00

22-2-6 63 mm dia LM 500 135.00 67,500.00

746413405.xlsx/Div- 22-Plumbing/Page330
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 1,269,400.00

746413405.xlsx/Div- 22-Plumbing/Page331
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

PLUMBING WORKS (CONT'D)

22-2-7 75 mm dia LM 300 100.00 30,000.00

22-2-8 90 mm dia LM 150 120.00 18,000.00

22-2-9 110 mm dia LM 700 129.00 90,300.00

SECTION 22 07 00 - INSULATION

22-3 CONDENSATE DRAIN PIPE LINES

Supply, install, test, commission and hand


over of UPVC Class 4 (PN 10) pipes with
insulation including all fittings, COs, vent
cowls covers, supports and all accessories
required to complete work in accordance
with project specifications and drawings.

22-3-1 25 mm dia LM 150 46.00 6,900.00

22-3-2 32 mm dia LM 200 53.00 10,600.00

22-3-3 40 mm dia LM 450 63.00 28,350.00

22-3-4 50 mm dia LM 220 72.00 15,840.00

22-3-5 75 mm dia LM 250 103.00 25,750.00

22-4 SUBMERSIBLE PUMPS PITS COVER

Supply, install, test, commission and hand


over of submersible pumps pits cover in
accordance with project specifications and
drawings.

Heavy duty Ductile Iron cover ( 100*100 cm


22-4-1 NO 5 3,000.00 15,000.00
clear opening ) for parking area

Medium duty Ductile Iron cover ( 100*100


22-4-2 NO 8 3,000.00 24,000.00
cm clear opening ) for pump rooms

TOTAL CARRIED TO COLLECTION 264,740.00

746413405.xlsx/Div- 22-Plumbing/Page332
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

PLUMBING WORKS (CONT'D)

SECTION 22 13 16 - SANITARY WASTE


AND VENT PIPING

22-5 CHANNEL GRATING

Supply, install, test, commission and hand


over of Grating trench drain with heavy
duty Ductile Iron cover in accordance with
project specifications and drawings.

Trench drain with heavy duty Ductile Iron


22-5-1 LM 1,000 2,000.00 2,000,000.00
cover ( 250 mm width clear opening )

SECTION 22 05 23 - VALVES

22-6 VALVES

Supply, install, test, commission and hand


over of valves with supports and all
accessories required to complete work in
accordance with project specifications and
drawings.

22-6-1 Isolating gate valve 110 mm dia NO 1 1,678.00 1,678.00

22-6-2 Isolating gate valve 90 mm dia NO 2 1,028.00 2,056.00

22-6-3 Isolating gate valve 63 mm dia NO 2 860.00 1,720.00

22-6-4 Isolating gate valve 50 mm dia NO 32 340.00 10,880.00

22-6-5 Check Valve 63 mm dia NO 2 650.00 1,300.00

22-6-6 Check Valve 50 mm dia NO 32 460.00 14,720.00

22-6-7 Float Valve 75 mm dia NO 1 975.00 975.00

22-6-8 Float Valve 110 mm dia NO 2 1,496.00 2,992.00

746413405.xlsx/Div- 22-Plumbing/Page333
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 2,036,321.00

746413405.xlsx/Div- 22-Plumbing/Page334
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

PLUMBING WORKS (CONT'D)

SECTION 22 13 23 - WATER METERS

22-7 WATER METER SET

Supply, install, test, commission and hand


over of water meter sets including two
isolating valve in accordance with project
specifications and drawings.

22-7-1 Water meter set 25 mm dia NO 75 15,500.00 1,162,500.00

22-7-2 Water meter set 32 mm dia NO 12 15,500.00 186,000.00

SECTION 22 40 00 - PLUMBING
FIXTURES & TRIM

22-8 HOSE BIB VALAVE

Supply, install, test, commission and hand


over of HOSE BIB with isolating
valve ,supports and all accessories
required to complete work in accordance
with project specifications and drawings.

22-8-1 Hose Bib 15 mm diameter (1/2"). NO 10 150.00 1,500.00

SECTION 22 11 23 - DOMESTIC WATER


PUMPS

22-9 SUBMERSIBLE SEWAGE PUMPS

Supply, install, test, commission and hand


over of Submersible pumps sets grinding
type , complete with aguid rail,lift chains,
control panel , float valves control, alarm
signal , controls , valves, wiring, all other
accessories, all in accordance with the
specifications and drawings.

Submersible pump set for pump rooms


SP-P-(1:8) Cap: 6 L/S (EACH) ; H: 1.5
22-9-1 Set 8 20,638.00 165,104.00
BAR
DUPLEX SETS ( 1 duty / 1 standby )

746413405.xlsx/Div- 22-Plumbing/Page335
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 1,515,104.00

746413405.xlsx/Div- 22-Plumbing/Page336
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

PLUMBING WORKS (CONT'D)

Submersible pump set for for elevator pits


SP-V-(1:11 ) Cap: 3 L/S (EACH) ; H: 1.5
22-9-2 Set 11 11,400.00 125,400.00
BAR
only ( 1 duty )

Submersible pump set for Parking area


SP-B-(1:5 ) Cap: 5 L/S (EACH) ; H: 1.5
22-9-3 Set 5 20,638.00 103,190.00
BAR
DUPLEX SETS ( 1 duty / 1 standby )

22-10 BOOSTER & GRAY PUMPS

Supply, install, test, commission and hand


over of water & gray pump sets complete
with pressure gauges,pressure vessel,
strainers, valves, wiring, control panel, float
switches, Puddle Flange connection pipes
( hot deep galvanized steel sch
80 ) ,suction & discharge pipes, fittings,
flexibleconnectors, dry run protection with
all necessary requirements to complete
work & installationin accordance with
project specifications and drawings.

Booster water pump set for office building


22-10-1 BWP-P-O Cap: 5 L/S (EACH) ; H: 6.5 BAR Set 1 13,900.00 13,900.00
variable speed ( 2 duty/ 1 standby )

Gray water pump set for office building


22-10-2 GWP-P-O Cap: 5 L/S (EACH) ; H: 6.5 BAR Set 1 13,900.00 13,900.00
variable speed ( 2 duty/ 1 standby )

Booster water pump set for building ( retail


1 & retail 2 & cinema & leisure ) BWP-P-B
22-10-3 Set 1 8,500.00 8,500.00
Cap: 5 L/S (EACH) ; H: 4.5 BAR
variable speed ( 2 duty/ 1 standby )

Gray water pump set for building ( retail 1 &


retail 2 & cinema & leisure ) GWP-P-B
22-10-4 Set 1 8,500.00 8,500.00
Cap: 5 L/S (EACH) ; H: 4.5 BAR
variable speed ( 2 duty/ 1 standby )

746413405.xlsx/Div- 22-Plumbing/Page337
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 273,390.00

746413405.xlsx/Div- 22-Plumbing/Page338
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

PLUMBING WORKS (CONT'D)

SECTION 22 13 16 - SANITARY WASTE


AND VENT PIPING

22-11 GRAY WATER TREATMENT PLANT

Supply, install, test, commission and hand


over of Gray water treatment plant
complete with pumps,pressure
gauges,pressure vessel, strainers, valves,
wiring, control panel, float switches, suction
& discharge pipes, fittings,
flexibleconnectors, dry run protection with
all necessary requirements to complete
work & installationin accordance with
project specifications
product quality : suatable for WC flushing
&irrigation aplications

Gray water treatment plant complete with


22-11-1 Capacity : NO 1 720,000.00 720,000.00
for office building

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 22-Plumbing/Page339
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 720,000.00

746413405.xlsx/Div- 22-Plumbing/Page340
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA PLUMBING WORKS
BUILDING : GENERAL BASEMENT DIVISION 22

No. Description Unit Qty Price Amount (SR)

COLLECTIONS:

DIVISION 22 : 1 / 6 1,269,400.00

DIVISION 22 : 2 / 6 264,740.00

DIVISION 22 : 3 / 6 2,036,321.00

DIVISION 22 : 4 / 6 1,515,104.00

DIVISION 22 : 5 / 6 273,390.00

DIVISION 22 : 6 / 6 720,000.00

TOTAL TO SUMMARY 6,078,955.00

746413405.xlsx/Div- 22-Plumbing/Page341
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

SECTION 23 34 23 - HVAC POWER


VENTILATORS

23-1 VENTILATION FANS

Exhaust Fan Centrifugal Type

Supply and Installation of exhaust fan


centrifugal type exhaust fan with control
panel and controls , antivibration steel
base, electrical connections, all in
accordance with the specifications and
drawings.

23-1-1 E.A.F-01, 2500 l/s , 75 pa No 1 9,457.00 9,457.00

23-1-2 E.A.F-02, 2500 l/s , 75 pa No 1 9,457.00 9,457.00

23-1-3 CPEAF-01,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-4 CPEAF-02,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-5 CPEAF-03,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-6 CPEAF-04,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-7 CPEAF-05,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-8 CPEAF-06,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-9 CPEAF-07,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-10 CPEAF-08,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-11 CPEAF-09,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-12 CPEAF-10,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-13 CPEAF-11,25000 l/s , 200 pa No 1 47,287.00 47,287.00

23-1-14 CPEAF-12,25000 l/s , 200 pa No 1 47,287.00 47,287.00

746413405.xlsx/Div- 23-HVAC/Page342
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 586,358.00

HVAC WORKS (CONT'D)

Exhaust Fan Axial Type

Supply and Installation of exhaust fan


Axial type exhaust fan with control panel
and controls , antivibration steel base,
electrical connections, all in accordance
with the specifications and drawings.

23-1-15 .E.A.F-03 , 260 l/s , 50 pa No 1 983.00 983.00

23-1-16 .E.A.F-04 , 155 l/s , 50 pa No 1 567.00 567.00

23-1-17 .E.A.F-05 , 300 l/s , 50 pa No 1 1,134.00 1,134.00

23-1-18 .E.A.F-06 , 362.5 l/s , 50 pa No 1 1,361.00 1,361.00

23-1-19 .E.A.F-07 , 362.5 l/s , 50 pa No 1 1,361.00 1,361.00

23-1-20 .E.A.F-08 , 500 l/s , 50 pa No 1 1,891.00 1,891.00

23-1-21 .E.A.F-09 , 160 l/s , 50 pa No 1 605.00 605.00

23-1-22 .E.A.F-10 , 160 l/s , 50 pa No 1 605.00 605.00

23-1-23 .E.A.F-11 , 325 l/s , 50 pa No 1 1,418.00 1,418.00

23-1-24 .E.A.F-12 , 300 l/s , 50 pa No 1 1,134.00 1,134.00

23-1-25 .E.A.F-13 , 130 l/s , 50 pa No 1 491.00 491.00

23-1-26 .E.A.F-14 , 90 l/s , 50 pa No 1 340.00 340.00

23-1-27 .E.A.F-15 , 260 l/s , 50 pa No 1 983.00 983.00

23-1-28 .E.A.F-16 , 250 l/s , 50 pa No 1 983.00 983.00

23-1-29 .E.A.F-17 , 250 l/s , 50 pa No 1 983.00 983.00

23-1-30 .E.A.F-18 , 250 l/s , 50 pa No 1 983.00 983.00

23-1-31 .E.A.F-19 , 245 l/s , 50 pa No 1 983.00 983.00

23-1-32 .E.A.F-20 , 245 l/s , 50 pa No 1 983.00 983.00

23-1-33 .E.A.F-21 , 245 l/s , 50 pa No 1 983.00 983.00

23-1-34 .E.A.F-22 , 245 l/s , 50 pa No 1 983.00 983.00

23-1-35 .E.A.F-23 , 245 l/s , 50 pa No 1 983.00 983.00

23-1-36 .E.A.F-24 , 245 l/s , 50 pa No 1 983.00 983.00

746413405.xlsx/Div- 23-HVAC/Page343
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 21,720.00

HVAC WORKS (CONT'D)

Jet Fans
Supply and installation of Jet fans
cyclone type with 2 speed motor class
f300 casing in galvanized natural finish
with electrical connections, all as
specified and shown on drawings.

JET FAN motor power 2.2/0.5 kw Thrust


23-1-37 No 81 2,250.00 182,250.00
50 N

SECTION 23 81 29 - VARIABLE
REFRIGERANT FLOW HVAC SYSTEMS

23-2 VRF-OUTER UNITS

VRF outdoor units condensing unit, fan


coil unit, controls, control wiring,flexible
connections, thermostat, fixing
accessories, vibration isolators,etc.

FOR OFFICE GROUND FLOOR

23-2-1 VRF-OUTDOOR UNIT (4 tons) No 1 41,300.00 41,300.00

23-2-2 VRF-OUTDOOR UNIT(7 tons) No 1 70,000.00 70,000.00

23-2-3 VRF-OUTDOOR UNIT(8 tons) No 2 78,000.00 156,000.00

23-2-4 VRF-OUTDOOR UNIT(8.5 tons) No 2 85,000.00 170,000.00

23-2-5 VRF-OUTDOOR UNIT (9.5tons) No 7 92,000.00 644,000.00

23-2-6 VRF-OUTDOOR UNIT(10 tons) No 5 107,000.00 535,000.00

23-2-7 VRF-OUTDOOR UNIT(11 tons) No 1 107,000.00 107,000.00

23-2-8 VRF-OUTDOOR UNIT(12 tons) No 5 107,000.00 535,000.00

23-2-9 VRF-OUTDOOR UNIT(14 tons) No 1 144,500.00 144,500.00

23-2-10 VRF-OUTDOOR UNIT(14.5 tons) No 2 149,700.00 299,400.00

23-2-11 VRF-OUTDOOR UNIT(17 tons) No 1 175,500.00 175,500.00

23-2-12 VRF-OUTDOOR UNIT(18 tons) No 1 175,500.00 175,500.00

746413405.xlsx/Div- 23-HVAC/Page344
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 3,235,450.00

HVAC WORKS (CONT'D)

23-2-13 VRF-OUTDOOR UNIT(20 tons) No 1 206,500.00 206,500.00

23-2-14 VRF-OUTDOOR UNIT (24 tons) No 1 247,000.00 247,000.00

23-2-15 VRF-OUTDOOR UNIT(26 tons) No 1 247,000.00 247,000.00

23-2-16 VRF-OUTDOOR UNIT(27 tons) No 1 279,000.00 279,000.00

SECTION 23 31 00 - HVAC DUCT AND


CASING

23-3 METAL DUCTS

Duct construction to be done according


to specifications as "SMACNA" duct
construction standards

"Supply and installation of rectangar


and circar air ductwork for supply,
return, and fresh air, including seams,
joints, hangers, supports, splitters,
turning vanes, elbows, and
transformation, complete with duct
sealants and flexible connections (duct
sealants and flexible connections shall
be fire rated where necessary), and all
necessary accessories," according to
specifications and as depicted on
drawings.

Galvanized Iron ductwork

G.I. Rectangar, Square Ductwork for


Supply & Return (with Insation )

23-3-1 Supply air duct M² 105 380.00 39,900.00

G.I. Rectangar, Square Ductwork fresh


toilet, smoke extract & smoke makeup,
carpark (without Insation)

23-3-2 Carpark extract air duct M² 310 335.00 103,850.00

23-3-3 Generator chiminy extract air duct M² 160 335.00 53,600.00

23-3-4 Storage extract air duct M² 115 335.00 38,525.00

746413405.xlsx/Div- 23-HVAC/Page345
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 1,215,375.00

HVAC WORKS (CONT'D)

Thermal Insation (As per Specification &


Drawing):

Thermal Insation for Indoor Supply duct,


23-3-5 Fiber Glass density 24 Kg/m3, 25 mm M² 105 65.00 6,825.00
thickness

Supply and installation Acoustic lining fiber


glass 25mm thickness to supply indoor duct
23-3-6 M² 40 120.00 4,800.00
up to 3 meter length and of density 24 kg /
m3 from AFICO or equal

23-4 DUCT ACCESSORIES

Supply and installation of volume control


dampers VFD type Fire and Smoke
dampers on all ducts crossing,shafts, fire
23-4-1 Item 1 342,000.00 342,000.00
rated walls, all as specified, as shown on
drawings & required for proper air
balancing

23-4-2 Motorized dampers with actuators. Item 1 Included

23-4-3 Smoke sensors. Item 1 Included

Back draft damper complete with all fixing


23-4-4 Item 1 Included
and accessories.

SECTION 23 37 00 - AIR OUTLETS AND


INLETS

23-5 DIFFUSERS, REGISTERS, AND GRILLES

Supply and installation of extruded


aluminum slot diffusers, squares
diffusers, registers, grilles and linear
grilles, complete with opposed blade
volume dampers, wooden frames,
fixings, with painting and all necessary
accessories, all in accordance with the
specifications and drawings.

23-5-1 Supply Diffuser : 350x350 NO 5 320.00 1,600.00

23-5-2 Return Diffuser : 350x350 NO 4 250.00 1,000.00

746413405.xlsx/Div- 23-HVAC/Page346
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

23-5-3 Linear Bar Grill ,L.B.G : 500X125 NO 16 200.00 3,200.00

TOTAL CARRIED TO COLLECTION 359,425.00

HVAC WORKS (CONT'D)

23-5-4 Linear Bar Grill ,L.B.G : 800X125 NO 28 240.00 6,720.00

23-5-5 Exhaust Grill ,E.A.L : 800x200 NO 10 290.00 2,900.00

23-5-6 Intake Air Louver : 2000x500 NO 5 1,200.00 6,000.00

23-5-7 Intake
SupplyAirofLouver : 3000x2500
horizontal concealed fan-coil NO 12 2,650.00 31,800.00
unit (low noise
SECTION 23 09 level) with 3 speed fan,
00 - INSTRUMENTATION
cleanable
AND CONTROL filter panel,
FOR HVACdigital room
thermostats as required and return air
23-6 HORIZONTALsensors
temperature CONCEALED UNIT
for public areas,
cooling coil. Coil to have one gate valve,
with BTP points. Also including wiring,
hangers, vibration isolators, canvas,
connection
Ducted Splitto- Air-Conditioning
the drain P-trap and all
Units
necessary fitting and accessories
23-6-1 including
AC SPLIT (4 vibration
kw) isolating mountings, No 2 2,000.00 4,000.00
all in accordance with the specifications
23-6-2 and drawings
AC SPLIT (4.7 kw) No 2 2,100.00 4,200.00

23-6-3 AC SPLIT (22.4 kw) No 1 5,500.00 5,500.00

23-6-4 AC SPLIT (9 kw) No 2 3,000.00 6,000.00

23-6-5 AC SPLIT (30 kw) No 2 32,000.00 64,000.00

23-6-6 AC SPLIT (16 kw) No 2 5,000.00 10,000.00

23-6-7 Wall mounted- Air-Conditioning Units

23-6-8 Hi wall mounted (3.55 kw) No 5 1,900.00 9,500.00

23-6-9 Hi wall mounted (7.1 kw) No 5 2,600.00 13,000.00

23-6-10 Hi wall mounted (10.65 kw) No 2 3,300.00 6,600.00

23-7 CONDENSATE PIPE WORK

Supply and install condensate insated


drain pipe for AHU to the nearest drain
point, all in accordance with the
specifications and drawings.

23-7-1 32 mm dia. M 60 50.00 3,000.00

746413405.xlsx/Div- 23-HVAC/Page347
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 173,220.00

746413405.xlsx/Div- 23-HVAC/Page348
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

HVAC WORKS (CONT'D)

23-8 GENERAL

TESTING, ADJUSTING, AND


BALANCING OF MEP SYSTEMS

Allow for Starting up,pressure


23-8-1 testing,complete testing and Allow for BMS Item 1 10,000.00 10,000.00
system to interface with HVAC system.

Installation of temporary Chillers complete


with all necessary accessories and fittings
including soft starter,PFC, filters, necessary
23-8-2 Item 1 10,000.00 10,000.00
CHW piping connection from temporary
Chilllers to building CHW line, etc required
for a complete operational function.

The contractor to list here and price any


items shown in the drawings, mentioned in
the specifications or required for the
23-8-3 satisfactory completion of this section as Item 1 10,000.00 10,000.00
per the relevant authority regations, but not
mentioned here. Any such item not listed is
deemed to be included.

746413405.xlsx/Div- 23-HVAC/Page349
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 30,000.00

HVAC WORKS (CONT'D)

SECTION 23 73 10 - CARBON DIOXIDE


(CO2) SYSTEM

23-9 CARBON DIOXIDE (CO2) SYSTEM

SYSTEM CO2 Contain / Nozzle, FOAM


Cylinder, Valve Actuator, Flame
Detector, Rate of Rise Heat Detector,
Optical Smoke Detector, Ionisation
Smoke Detector, Fixed Temperature
Heat Detector, Releasing Control Panel,
Manual Release, Abort Switch, Actuator,
Horn Strobe, Warning Sign, Pressure
Switch.
23-9-1 Basement Generator Room (98x2) KG 196 45,000.00

23-9-2 Basement Substation KG 275 45,000.00

23-9-3 Basement Generator Room KG 240 Included

23-9-4 Basement Generator Room KG 302 Included

23-9-5 Basement MDB Room KG 350 60,000.00

23-9-6 Basement MDB Room KG 152 Included

23-9-7 Basement MDB Room (120x2) KG 240 Included

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 23-HVAC/Page350
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 150,000.00

746413405.xlsx/Div- 23-HVAC/Page351
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)

COLLECTIONS:

DIVISION 23 : 1 / 8 586,358.00

DIVISION 23 : 2 / 8 21,720.00

DIVISION 23 : 3 / 8 3,235,450.00

DIVISION 23 : 4 / 8 1,215,375.00

DIVISION 23 : 5 / 8 359,425.00

DIVISION 23 : 6 / 8 173,220.00

DIVISION 23 : 7 / 8 30,000.00

DIVISION 23 : 8 / 8 150,000.00

746413405.xlsx/Div- 23-HVAC/Page352
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA HVAC WORKS
BUILDING : GENERAL BASEMENT DIVISION 23

No. Description Unit Qty Price Amount (SR)


TOTAL TO SUMMARY 5,771,548.00

746413405.xlsx/Div- 23-HVAC/Page353
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)

26-1 PANEL BOARDS

Supply and installation of


panelboard,complete with enclosure,
busbars, circuit breakers, contactors,
main switch, earth leakage circuit
breakers, lighting controls control
cables connections and spares
breakers.

SECTION 26 24 13 -MAIN DISTRIBUTION


BOARDS

Main Distribution Boards (MDB / EMDB /


ATS)

Supply, install, test and commission of


main distribution boards including,
necessary circuit breakers, relay, meter,
selector switch and all accessories,
complete all in accordance with the
drawings and specification.

26-1-1 MDB-OF No. 1 180,000.00 180,000.00

26-1-2 EMDB-OF No. 1 125,000.00 125,000.00

26-1-3 SMDB.OF-B No. 1 120,000.00 120,000.00

26-1-4 ESMDB.OF-B No. 1 120,000.00 120,000.00

26-1-5 SMDB-RT1 No. 1 125,000.00 125,000.00

26-1-6 EMDB-RT1 No. 1 125,000.00 125,000.00

26-1-7 SMDB-CN No. 1 150,000.00 150,000.00

26-1-8 EMDB-CN No. 1 125,000.00 125,000.00

26-1-9 SMDB-LR No. 1 150,000.00 150,000.00

26-1-10 EMDB-LR No. 1 125,000.00 125,000.00

26-1-11 SMDB-RT2 No. 1 150,000.00 150,000.00

26-1-12 EMDB-RT2 No. 1 125,000.00 125,000.00

746413405.xlsx/Div- 26.-Electrical Works/Page354


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 1,620,000.00

ELECTRICAL WORKS (CONT'D)

SECTION 26 24 16 -SECONDARY
DISTRIBUTION BOARDS

Sub-Main Distribution Boards

Supply, install, test and commission of sub-


main distribution boards including
necessary circuit breakers, relay, meter,
selector switch and all accessories,
complete all in accordance with the
drawings and specification.

26-1-13 PPB-OF No. 1 8,000.00 8,000.00

26-1-14 DBB-OF.MECH1 No. 1 40,000.00 40,000.00

26-1-15 ELPB-OF No. 1 8,000.00 8,000.00

26-1-16 EDBB-OF.MEC1 No. 1 40,000.00 40,000.00

26-1-17 EDBB-OF.MEC2 No. 1 40,000.00 40,000.00

26-1-18 UPP-SC No. 1 8,000.00 8,000.00

26-1-19 UPP-LC No. 1 8,000.00 8,000.00

26-1-20 EDBB-RT1.MEC No. 1 40,000.00 40,000.00

26-1-21 ELPB-RT1 No. 1 8,000.00 8,000.00

26-1-22 PPB-RT1 No. 1 8,000.00 8,000.00

26-1-23 EDBB-CN.MEC No. 1 40,000.00 40,000.00

26-1-24 ELPB-CN No. 1 8,000.00 8,000.00

26-1-25 PPB-CN No. 1 8,000.00 8,000.00

26-1-26 EDBB-LR.MEC No. 1 40,000.00 40,000.00

26-1-27 ELPB-LR No. 1 8,000.00 8,000.00

26-1-28 PPB-LR No. 1 8,000.00 8,000.00

26-1-29 DBB-LR.MEC No. 1 40,000.00 40,000.00

746413405.xlsx/Div- 26.-Electrical Works/Page355


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 360,000.00

ELECTRICAL WORKS (CONT'D)

26-1-30 ELPB-RT2 No. 1 8,000.00 8,000.00

26-1-31 EDBB-RT2.MEC1 No. 1 40,000.00 40,000.00

26-1-32 PPB-RT2 No. 1 8,000.00 8,000.00

26-1-33 DBB-RT2.MEC No. 1 40,000.00 40,000.00

26-1-34 EDBB-RT2.MEC2 No. 1 40,000.00 40,000.00


SECTION 26 05 36 -CABLE TRAYS &
LADDERS SYSTEMS
26-2 LV CABLE TRAY
Supply and installation of cable tray for
LV , as per mentioned in Diagram.
26-2-1 800 mm x 50 mm LM 180 185.00 33,300.00

26-2-2 600 mm x 50 mm LM 385 170.00 65,450.00

26-2-3 500 mm x 50 mm LM 165 160.00 26,400.00

26-2-4 300 mm x 50 mm LM 265 150.00 39,750.00

26-2-5 200 mm x 50 mm LM 200 140.00 28,000.00

26-2-6 100 mm x 50 mm LM 190 130.00 24,700.00

26-2-7 50 mm x 50 mm LM 235 120.00 28,200.00

26-3 MV CABLE TRAY


Supply and installation of cable tray for
HV, as per mentioned in Diagram.
26-3-1 30 cm cable tray LM 1,000 300.00 300,000.00

SECTION 26 51 00 - INTERIOR LIGHTING

26-4 LUMINARIES
Supply and installation only of lighting
fixtures, as per shown on the drawing
including wires, cables, flexible cables,
grounding, conduits, boxes, mounting
26-4-1 materials,
40WATTS, lamps and accessories.
LED, 230V, 60HZ, CEILING . No. 116 550.00 63,800.00
25WATTS, LED, 230V, 60HZ, RECESSED
26-4-2 No. 31 450.00 13,950.00
.
26-4-3 35 WATTS, LED, WALL MOUNTED No. 14 450.00 6,300.00

746413405.xlsx/Div- 26.-Electrical Works/Page356


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)


CHANDLER RING LED, 6000K, 44W,
26-4-4 No. 7 8,000.00 56,000.00
4400LM

TOTAL CARRIED TO COLLECTION 821,850.00

ELECTRICAL WORKS (CONT'D)

CARDAN RECESSED LIGHT, 3 x LED,


26-4-5 No. 22 450.00 9,900.00
3x10 W, 230 V

5WATTS/METER, LED, 230V, 60HZ,


26-4-6 LM 120 600.00 72,000.00
RECESSED .

CARDAN RECESSED LIGHT, 2 x LED,


26-4-7 No. 40 450.00 18,000.00
2x10 W, 230 V

BA-1 Suspended linear light@ Basement


26-4-8 No. 713 500.00 356,500.00
Parking

26-4-9 BA-2 Ramp light@ Basement Ramp No. 64 1,000.00 64,000.00

BA-3 Surface mounted linear light@


26-4-10 No. 34 500.00 17,000.00
Cinema & Leisure

26-5 LIGHTING SWITCHES

13A, 230volts, wall mouted, single pole,


26-5-1 No. 58 400.00 23,200.00
one gang toggle lighting switch

26-5-2 Pushbutton for telerupture No. 11 350.00 3,850.00

26-5-3 Motion sensor No. 6 500.00 3,000.00

SECTION 26 27 26 - WIRING DEVICES

26-6 WIRING DEVICES

Supply and installation only of wiring


devices as following complete with all
necessary accessories with
protectiveearth contacts connected and
tested, including boxes all as all as on
the drawings. specified in technical
specification and/or shown coverplates,
conduits, conductors, drawboxes
complete on the drawings.

Power Outlets
Duplex receptacle, 240volts, 13A, 2P+E,
26-6-1 No. 42 400.00 16,800.00
grounded, wall mounted, IP20

746413405.xlsx/Div- 26.-Electrical Works/Page357


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)


Single receptacle, 240volts, 13A, 2P+E,
26-6-2 No. 59 400.00 23,600.00
grounded, wall mounted, IP20

TOTAL CARRIED TO COLLECTION 607,850.00

ELECTRICAL WORKS (CONT'D)

Single receptacleEv for car charging ,


26-6-3 No. 9 500.00 4,500.00
240volts, 32A, 2P+E, wall mounted,

Electrical Box Floor Mounted: Including


2no. Mono Phase 16A Socket Outlet, 2no.
26-6-4 No. 4 600.00 2,400.00
RJ45 CAT6 UTP Telecom Outlets &
2no.UPS Outlets

Duplex receptacle, 240volts, 32A, 2P+E,


26-6-5 No. 13 400.00 5,200.00
grounded, wall mounted, IP20

Mechanical Power

26-6-6 20A SOCKETS FOR DATA RACKS No. 16 -

26-6-7 CP No. 39 -

DISCONNECT SWITCH, 4P,230V, 20A,


26-6-8 No. 41 320.00 13,120.00
WEATHERPROOF

DISCONNECT SWITCH, 2P,230V, 25A,


26-6-9 No. 1 320.00 320.00
WEATHERPROOF

DISCONNECT SWITCH, 2P,230V, 30A,


26-6-10 No. 1 450.00 450.00
WEATHERPROOF

DISCONNECT SWITCH, 4P,230V, 20A,


26-6-11 No. 82 320.00 26,240.00
WEATHERPROOF

DISCONNECT SWITCH, 4P,230V, 63A,


26-6-12 No. 13 620.00 8,060.00
WEATHERPROOF

DISCONNECT SWITCH, 4P,230V, 300A,


26-6-13 No. 1 900.00 900.00
WEATHERPROOF

26-6-14 EXHAUST FAN No. 13 3,000.00 39,000.00

746413405.xlsx/Div- 26.-Electrical Works/Page358


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)


NB: The Contractor is referred to the
Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 100,190.00

COLLECTIONS:

DIVISION 26 : 1 / 5 1,620,000.00

DIVISION 26 : 2 / 5 360,000.00

DIVISION 26 : 3 / 5 821,850.00

DIVISION 26 : 4 / 5 607,850.00

DIVISION 26 : 5 / 5 100,190.00

746413405.xlsx/Div- 26.-Electrical Works/Page359


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRICAL WORKS
BUILDING : GENERAL BASEMENT DIVISION 26

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 3,509,890.00

746413405.xlsx/Div- 26.-Electrical Works/Page360


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

SECTION 27 10 00 - STRUCTURED
CABLING SYSTEM

Supply and installation only and


termination of Backbone Cabling,
complete including cables from the
source upto terminal boxes, conduits,
boxes, Fiber Optic Single Mode and all
accessories as specified and shown on
the drawings.

BACKBONE CABLING FROM SERVER


27-1
ROOM TO IDF

12 Core Single Mode 9/125 Fiber Optical


27-1-1 LS 1 350,000.00
Cable,

24 port Single Mode fiber patchpanel Fully


27-1-2 No. 10 Included
Loaded Along with Splice Trays

27-1-3 Cable Management No. 10 Included

27-1-4 Single Mode Fiber Optic Pig Tails LS 1 Included

27-1-5 Single Fiber Optic Patch Chords LS 1 Included

CAT6A PatchPanels Server Racks & NW


27-1-6 LS 1 Included
Racks

27-1-7 Cable Guides for for CAT6A Patch Panels LS 1 Included

MTR TO THE SERVER ROOM Copper


27-2
CONNECTIVITY

CAT6A CABLE 25 Runs between MTR and


27-2-1 LS 1 Included
Server Room

CAT6A Patch Panel Fully Loaded (2 Nos


27-2-2 for MTR Side & 2 Nos for Server Room No. 4 Included
Side)

27-2-3 CAT6A PATCH CABLES LS 1 Included

27-2-4 Copper Cable Management No. 4 Included

746413405.xlsx/Div- 27-Communication/Page361
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 350,000.00

COMMUNICATION (CONT'D)

MTR TO THE SERVER ROOM FIBER


27-3
CONNECTIVITY

CAT6A CABLE 25 Runs between MTR and


Server Room, CAT6A Patch Panel Fully
27-3-1 Loaded (2 Nos for MTR Side & 2 Nos for LS 1 200,000.00
Server Room Side), 6 Core Single Mode
9/125 Fiber Optical Cable.

Fiber Patchpanel 24 Port Fully Loaded


Single Mode along with with SPLICE
27-3-2 No. 2 Included
Trays(1 On MTR Side & 1 On Server Room
Side

27-3-3 Fiber Optic Cable Management No. 2 Included

27-3-4 Single Mode Fiber Optic Patch Cables LS 1 Included

27-4 MTR TO EFTR FIBER CONNECTIVITY

6 Core Single Mode 9/125 Fiber Optical


27-4-1 LS 1 Included
Cable,

Fiber Patchpanel 24 Port Fully Loaded


27-4-2 Single Mode along with with SPLICE No. 2 Included
Trays(1 On MTR Side & 1 On EFTR Side

27-4-3 Fiber Optic Cable Management No. 2 Included

27-4-4 Single Mode Fiber Optic Patch Cables LS 1 Included

MTR TO MINI ODFs for Broadband ISP


27-5
FIBER CONNECTIVITY

24 Core Single Mode 9/125 Fiber Optical


27-5-1 LS 1 Included
Cable,

Fiber Patchpanels 24 Port Fully Loaded


27-5-2 LS 1 Included
Single Mode along with SPLICE TRAYS

27-5-3 Fiber Optic Cable Managements LS 1 Included

MINI ODFs as per the Drawings and ISP


27-5-4 No 10 Included
Requirements (144Ports)

4 Core Single Mode Fiber Optic Drop Cable


27-5-5 LS 1 Included
from Mini ODF to RCC Cabinets

746413405.xlsx/Div- 27-Communication/Page362
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 200,000.00

COMMUNICATION (CONT'D)

EFTR TO All AREAS (FTTX /


27-6
BROADBAND)

24 Core Single Mode 9/125 Fiber Optical


27-6-1 LS 1 Included
Cable,

Fiber Patchpanels 24 Port Fully Loaded


27-6-2 LS 1 Included
Single Mode along with SPLICE TRAYS

27-6-3 Fiber Optic Cable Managements LS 1 Included

4 Core Single Mode Fiber Optic Drop Cable


27-6-4 LS 1 Included
from Mini ODF to RCC Cabinets

SECTION 27 20 00 - DATA &


NETWORKING ACTIVE COMPONENT

ACTIVE NETWORK COMPONENTS


27-7
TELEPHONY, DATA, AV SERVER ROOM

CORE: Enterprise Grade Layer3 Switch 24


Port 10Gbps Fiber Optic Slots Plus 4
27-7-1 No 2 450,000.00
atleast 2x40Gbps Ports for Virtual Stacking
along with Licenses

ACCESS: 24 Port 10/100/1000 Non PoE


UTP Access Port + 2 *10Gbps Fiber Optic
27-7-2 Uplink Stackable Cloud Managed Switches No 2 Included
with Stack Cables and Accessories . With
Licenses

27-7-3 10Gbps Single Mode LR SFP No 18 Included

27-7-4 NG Firewall with Requisite Interfaces No 2 Included

Gateway Device with Functionality of


27-7-5 No 2 Included
Firewall and Licenses

27-7-6 ISP WAN ROUTER With Licenses No 2 Included

Wireless LAN Controller With Requisite


27-7-7 No 2 Included
Licenses

27-7-8 NMS With SW and HW With Licenses No. 1 Included

746413405.xlsx/Div- 27-Communication/Page363
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 450,000.00

COMMUNICATION (CONT'D)

27-8 CABINETS FOR IT SYSTEM

42U 800x1000mm cabinet for ICT in


27-8-1 No 3 Included
Server Room

27-8-2 47U 800x1000mm cabinet for MTR No. 2 Included

27-8-3 47U 800x1000mm cabinet for EFTR No. 2 Included

27-8-4 42U 800x1000mm cabinet for EFTR No. 1 Included

27-8-5 15U CABINETS No. 8 Included

27-9 TELEPHONY SYSTEM in Server Room

IP PABX That can support upto 100 Users.


27-9-1 No. 1 320,000.00
Basic Model

27-9-2 VoIP Phones with in Server Room No. 1 Included

27-9-3 Emergency Phones No. 1 Included

27-9-4 Emergency Phones . No. 1 Included

NB: Licenses for the PABX System


based on the Users and other
Requirements for Optimal Performance
of the System

STRUCTURED CABLING COMPONENTS


27-10
SECURITY SYSTEM

BACKBONE

12 Core Single Mode 9/125 Fiber Optical


27-10-1 LS 1 120,000.00
Cable,

24 port Single Mode fiber patchpanel Fully


27-10-2 No. 9 Included
Loaded Along with Splice Trays

27-10-3 Cable Management LS 1 Included

27-10-4 Single Mode Fiber Optic Pig Tails LS 1 Included

27-10-5 CAT6A PATCH Panels Fully Loaded LS 1 Included

746413405.xlsx/Div- 27-Communication/Page364
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 440,000.00

COMMUNICATION (CONT'D)

27-10-6 CAT6A PATCH CABLES LS 1 Included

For Specific Landlord CCTV System &


27-10-7 Control room provide required Network . LS 1 Included
Contract to co-ordinate with Landlord

ACTIVE NETWORK SYSTEM SYSTEM


27-11
SECURITY in Server Room

27-11-1 CORE SWITCHES FO No. 2 Included

27-11-2 SCR DATA SWITCHES 24 Port Non PoE No. 2 Included

27-11-3 FO SM UPLINKS 10Gbps SFP+ No. 22 Included

27-11-4 Firewall For Security Network No. 2 Included

For Specific Landlord CCTV System &


27-11-5 Control room provide required Network . LS 1 Included
Contract to co-ordinate with Landlord

27-12 CABINETS for SECURITY SYSTEM

42U 800x1000mm cabinet for SECURITY


27-12-1 No. 3 Included
in Server Room

27-12-2 15U CABINETS No. 4 Included

27-12-3 24U CABINETS No. 5 Included

27-12-4 42U 800x800mm cabinet for EFTR No. 2 Included

For Specific Landlord CCTV System &


27-12-5 Control room provide required Rack . LS 1 Included
Contract to co-ordinate with Landlord

746413405.xlsx/Div- 27-Communication/Page365
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION Included

COMMUNICATION (CONT'D)

SECTION 27 51 16 - PUBLIC ADDRESS &


SOUND SYSTEM

27-13 PUBLIC ADDRESS SYSTEM

27-13-1 BGM CEILING SPEAKER (CS) No 50 650.00 32,500.00

27-13-2 HIGH OUTPUT WALL SPEAKER (WS-1) No 6 240,000.00

27-13-3 BGM WALL SPAKER (WS-2) No 35 Included

27-13-4 COMPACT SUBWOOFER (SW) No 6 Included

27-13-5 BGM MUSHROOM SPEAKER (MS) No 7 Included

WALL PLATE INTERFACE (WP1)


2 X MIC INPUT (DANTE XLR),
2 X AUDIO INPUT (DANTE)
27-13-6 2 X REC/MIC OUTPUT (DANTE XLR) No 2 Included
2 X13AMP POWER
1 X RJ45 (DATA)
1 X RJ45 (AVOIP)

FLOOR BOX INTERFACE (FB1)


2 X MIC INPUT (DANTE XLR),
2 X REC/MIC OUTPUT (DANTE XLR)
27-13-7 No 5 Included
2 X13AMP POWER
1 X RJ45 (DATA)
1 X RJ45 (AVOIP)

MULTI CHANNEL DANTE POWER


27-13-8 No 7 Included
AMPLIFIER

AUDIO DIGITAL SIGNAL PROCESSOR


27-13-9 No 1 Included
DANTE

27-13-10 AUDIO PLAYBACK SERVER No 3 Included

746413405.xlsx/Div- 27-Communication/Page366
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 272,500.00

COMMUNICATION (CONT'D)

MANAGED POE+ NETWORK SWITCH


27-13-11 No 7 Included
SFP DANTE CERTIFIED

27-13-12 CONTROL PROCESSOR No 1 Included

10" RACK MOUNT TOUCH PANEL


27-13-13 No 1 Included
INTERFACE

27-13-14 BGM EQUIPMENT RACK No 7 Included

CABLES, CONNECTORS &


27-13-15 LS 1 Included
ACCESSORIES

MOUNTING BRACKETS &


27-13-16 LS 1 Included
INSTALLATION ACCESSORIES

INSTALLATION, TESTING,
27-13-17 LS 1 Included
PROGRAMMING & COMMISSIONING

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 27-Communication/Page367
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION Included

COLLECTIONS:

DIVISION 27 : 1 / 7 350,000.00

DIVISION 27 : 2 / 7 200,000.00

DIVISION 27 : 3 / 7 450,000.00

DIVISION 27 : 4 / 7 440,000.00

DIVISION 27 : 5 / 7 Included

DIVISION 27 : 6 / 7 272,500.00

DIVISION 27 : 7 / 7 Included

746413405.xlsx/Div- 27-Communication/Page368
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA COMMUNICATION
BUILDING : GENERAL BASEMENT DIVISION 27

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 1,712,500.00

746413405.xlsx/Div- 27-Communication/Page369
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRONIC SAFETY & SECURITY
BUILDING : GENERAL BASEMENT DIVISION 28

No. Description Unit Qty Price Amount (SR)

SECTION 28 46 00 - FIRE DETECTION &


ALARM

28-1 FIRE ALARM SYSTEM

Supplying, installing, connecting,


programming, testing and commission
of fire detection/alarm system with
integrated voice evacuation system
comprising of different fire alarm
devices and complete with fire alarm
control panels with processor units,
color graphic stations, software,
licenses, workstations, printers,
addressable loop cards (including spare
addressable loop cards), fiber optic/UTP
media converters, system servers,
system interfaces (with BMS system,
CCTV system, Access Control system,
public address system, Fire Fighting
systems, Fire Brigade interconnection,
HVAC Control system, Elevators,
Emergency Diesel Generator, Fuel Tank,
etc), protocol gateways, speakers,
manual monitors and control modules
with status LEDs, relays, wiring,
emergency voice dialer, power supplies
(including spare power supply), master
telephone handsets with telephone
selectors and indicators, Auxiliary and
booster power supplies, amplifiers,
backup batteries, battery chargers, fire
resistant cablings, EMT conduits,
conduit fittings, spare parts, and all
necessary accessories and ancillary
works and materials required for
complete installation and operation as
per standards and specified in
specifications and as indicated on the
project design drawings for complete
operative system.

Complete Fire Alarm Network including


3Hrs Fire rated cable inside surface
28-1-1 mounted EMT conduits or self- ITEM 1 450,000.00 450,000.00
extinguishing, PVC conduits recessed in
ceiling/wall

Addressable Main fire alarm control panel


28-1-2 No. 1 90,000.00 90,000.00
(MFACP)

28-1-3 Sub. Fire Alarm Control Panel (Sub.FACP) No. 6 30,000.00 180,000.00

Fire Alarm Control Panel (FACP) for


28-1-4 No. 1 15,000.00 15,000.00
Carbon Monoxide

28-1-5 Two way MECP No. 1 4,000.00 4,000.00

28-1-6 Addressable fire alarm manual pull station No. 21 330.00 6,930.00

Addressable fire alarm manual pull station


28-1-7 No. 95 400.00 38,000.00
(Weatherproof)

Fire Alarm Sounder with Flashing


28-1-8 No. 67 700.00 46,900.00
(Weatherproof)

TOTAL CARRIED TO COLLECTION 830,830.00

746413405.xlsx/Div- 28-Ev Security/Page370


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRONIC SAFETY & SECURITY
BUILDING : GENERAL BASEMENT DIVISION 28

No. Description Unit Qty Price Amount (SR)

ELECTRONIC SAFETY & SECURITY


(CONT'D)

28-1-9 Fire Alarm Sounder with Flashing No. 38 600.00 22,800.00

28-1-10 Addressable smoke detector No. 51 300.00 15,300.00

Addressable smoke detector fitted above


28-1-11 No. 10 300.00 3,000.00
ceiling

Addressable smoke detector fitted under


28-1-12 No. 3 300.00 900.00
raised floor

28-1-13 Addressable heat detector No. 1,101 300.00 330,300.00

28-1-14 Addressable multi-sensor detector No. 53 400.00 21,200.00

28-1-15 Addressable Carbon Monoxide Detector No. 95 350.00 33,250.00

28-1-16 Fireman's Telephone (F) No. 16 500.00 8,000.00

28-1-17 Fireman's Telephone Jack (Fj) No. 9 450.00 4,050.00

28-1-18 Control Module for [CM] No. 13 300.00 3,900.00

28-1-19 Monitor Module for [M] No. 33 300.00 9,900.00

28-1-20 Monitor Module for [FM-200] No. 29 300.00 8,700.00

28-1-21 Monitor Module for [ZCV-TS] No. 19 450.00 8,550.00

28-1-22 Monitor Module for [ZCV-FS] No. 19 450.00 8,550.00

28-1-23 Door Holder (DH) No. 9 300.00 2,700.00

28-1-24 Graphic User Interface (GUI) No. 1 2,800.00 2,800.00

28-1-25 PC master station with printer No. 1 10,000.00 10,000.00

28-1-26 PC converter unit No. 1 2,500.00 2,500.00

28-1-27 Interface with BMS system No. 1 8,000.00 8,000.00

28-1-28 Interface with CCTV system No. 1 6,000.00 6,000.00

28-1-29 Interface with Access control system No. 1 6,000.00 6,000.00

28-1-30 Interface with fire fighting systems No. 1 6,000.00 6,000.00

28-1-31 Interface with HVAC & fire protection No. 1 6,000.00 6,000.00

28-1-32 Interface with Elevators No. 1 6,000.00 6,000.00

28-1-33 Interface with Public address system No. 1 6,000.00 6,000.00

Interface with Emergency diesel generator


28-1-34 No. 1 2,000.00 2,000.00
sets monitoring.

28-1-35 Interface with Fire brigade interconnection No. 1 2,000.00 2,000.00

TOTAL CARRIED TO COLLECTION 544,400.00

746413405.xlsx/Div- 28-Ev Security/Page371


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRONIC SAFETY & SECURITY
BUILDING : GENERAL BASEMENT DIVISION 28

No. Description Unit Qty Price Amount (SR)

ELECTRONIC SAFETY & SECURITY


(CONT'D)

Interface with Fuel level inside fuel tanks


28-1-36 No. 1 2,000.00 2,000.00
monitoring

28-1-37 Interface with Leisuret sound System No. 1 2,000.00 2,000.00

28-1-38 Interface with prayer area sound system No. 1 2,000.00 2,000.00

28-1-39 Interface with LPG system No. 1 2,000.00 2,000.00

Interface with Automative Opening Smoke


28-1-40 No. 1 6,000.00 6,000.00
Ventilation

28-2 CO DETECTION SYSTEM

Supply and Install complete CO detection


system with all necessary supports, fittings
28-2-1 and accessories all in accordance with the Item 1 105,000.00 105,000.00
specifications and drawings and complying
with the relevant regulatory authorities..

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

TOTAL CARRIED TO COLLECTION 119,000.00

746413405.xlsx/Div- 28-Ev Security/Page372


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA ELECTRONIC SAFETY & SECURITY
BUILDING : GENERAL BASEMENT DIVISION 28

No. Description Unit Qty Price Amount (SR)

COLLECTIONS:

DIVISION 28 : 1 / 3 830,830.00

DIVISION 28 : 2 / 3 544,400.00

DIVISION 28 : 3 / 3 119,000.00

TOTAL TO SUMMARY 1,494,230.00

746413405.xlsx/Div- 28-Ev Security/Page373


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EARTHWORKS
BUILDING : GENERAL BASEMENT DIVISION 31

No. Description Unit Qty Price Amount (SR)

SECTION 31 10 00 - SITE CLEARING

31-1 SITE PREPARATION

31-1 Allow for Site Clearance M² 46,356 25.00 1,158,900.00


SECTION 31 23 00 - EXCAVATION &
FILL
31-2 EXCAVATION

The Contractor is referred to the


Specifications, Drawings and soil
investigation report for all details related
to this section of the Works and the
Contractor shall include for complying
with all requirements contained herein,
whether or not they are specifically
mentioned within the items descriptions.

Excavation up to Basement Floor and the


M³ 175,229 40.00 7,009,160.00
like

31-2-1 Excavation to level -2800 M³ 134,362 -

31-2-2 Excavation to level -3200 M³ 19,195 -

31-2-3 Excavation to level -3500 M³ 14,396 -

31-2-4 Excavation to level -3800 M³ 76 -

Excavation to foundation level (for elevator


pit and foundation drop)/ vertical and
horizontal termination, and removal of M³ 3,600 55.00 198,000.00
excavated material to disposal designated
area by the local authoritry

Excavations for whole site, variable depth,


31-2-5 M³ 3,600 -
with vertical and horizontal trimming

746413405.xlsx/Div- 31-EW/Page374
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EARTHWORKS
BUILDING : GENERAL BASEMENT DIVISION 31

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION 8,366,060.00

EARTHWORKS (CONT'D)

31-3 FILLING

Supply and install filling material arround


31-3-1 basement walls on layers as per M³ 4,800 -
Specifications.

Supply and install(filter) material under


31-3-2 M³ 9,900 -
foundations on layers as per Specifications.

Supply and apply of separation layer of


non-woven geotextile sheet 300 gr/sqm,
31-3-3 loose laid between backfilling arround M² 1,800 -
basement wall and filter material as per
sepcifications.
31-4 REMOVAL OF EXCESS MATERIALS

Removal of excess material not used to


31-4-1 disposalareas as designated by the local M³ 3,600 -
authorities.

SECTION 31 31 00 - SOIL TREATMENT

31-5 TERMITE CONTROL

Provide soil treatment for termite, complete


31-5-1 all in accordance with the specifications M² 46,356 10.00 463,560.00
and as directed by the Engineer.

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 31-EW/Page375
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EARTHWORKS
BUILDING : GENERAL BASEMENT DIVISION 31

No. Description Unit Qty Price Amount (SR)

TOTAL CARRIED TO COLLECTION 463,560.00

COLLECTIONS:

DIVISION 31 : 1 / 2 8,366,060.00

DIVISION 31 : 2 / 2 463,560.00

746413405.xlsx/Div- 31-EW/Page376
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EARTHWORKS
BUILDING : GENERAL BASEMENT DIVISION 31

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY 8,829,620.00

746413405.xlsx/Div- 31-EW/Page377
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXTERIOR IMPROVEMENTS
BUILDING : GENERAL BASEMENT DIVISION 32

No. Description Unit Qty Price Amount (SR)

SECTION 32 30 00 - BOUNDARY
WALLS / FENCE / GATES

32-1 SUBSTRUCTURE

Unreinforced cast in-situ-concrete 75mm


thick plain concrete under foundation with
cement type according to the
recommendation of Geotechnical report,
minimum 28 days cylinder compressive
32-1-1 M³ 30 700.00 21,000.00
strength Fc' = 20 Mpa.The work shall
include soil compaction,concrete casting
and curing for concrete and all required
equipment and material for finish the work
according to drawings and specifications.

32-2 INFRASTRUCTURE CONCRETE

Cast-In-Place Reinforced Concrete type of


cement ASTM Type-V.and maximum water
cement ratio:0.55. Minimum concrete
Cover of fdn. 75mm.

Strip Foundation variable


thickness ,Reinforced concrete Fc’=35
MPa, with cement type according to the
recommendation of Geotechnical report.
32-2-1 M³ 105 1,200.00 126,000.00
The price shall include formworks, steel
reinforcement bars, mixing, conveying,
placing, curing and testing according to
specifications.

Reinforced concrete Retaing wall as per


32-2-2 speccification. (f'c=35 Mpa) Cost shall M³ 190 1,200.00 228,000.00
include the formwork, reinforcement.

SECTION 32 14 16 - UNIT PAVING

32-3 PARKING WHEEL STOPPER

Installation of Precast Concrete Wheel


Stop, color and finish to match curbs,
32-3-1
complete; all in accordance with drawings
and specifications.
at Basement
References:
Wheel Stop Detail, X1B9-EC-030 (B)
Curb Type (Upstand) EC-030 No 867 200.00 173,400.00

746413405.xlsx/Div- 32 EXIMP/Page378
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXTERIOR IMPROVEMENTS
BUILDING : GENERAL BASEMENT DIVISION 32

No. Description Unit Qty Price Amount (SR)


548,400.00

SECTION 32 17 23 - PAVEMENT
MARKING

32-4 PARKING LINES & MARKING

Supply & application of 100mm Utility


marking paint with yellow color or as
per approved sample for parking lines
marking; all in accordance with
drawings and specifications.

32-4-1 100mm Parking Lines LM 3,775 40.00 151,000.00

32-5 HANDICAP PARKING SIGN MARKING

Supply & application of Utility marking


paint with Blue color or as per approved
sample for Handicap parking sign
marking; all in accordance with
drawings and specifications.

32-5-1 Handicap Parking Sign Nos 44 150.00 6,600.00

DRIVEWAY DIRECTIONAL ARROW


32-6
MARKING

Supply & application of 100mm Utility


marking paint with Green color or as per
approved sample for Handicap parking
sign marking; all in accordance with
drawings and specifications.

2m Length Driveway directional arrow


32-6-1 Nos 200 80.00 16,000.00
marking

NB: The Contractor is referred to the


Specifications and Drawings for all
details related to this Division of the
Works and the Contractor shall include
for complying with all requirements
contained herein, whether or not they
are specifically mentioned within the
items descriptions.

746413405.xlsx/Div- 32 EXIMP/Page379
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXTERIOR IMPROVEMENTS
BUILDING : GENERAL BASEMENT DIVISION 32

No. Description Unit Qty Price Amount (SR)

173,600.00

COLLECTIONS:

DIVISION 32 : 1 / 2 548,400.00

DIVISION 32 : 2 / 2 173,600.00

746413405.xlsx/Div- 32 EXIMP/Page380
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA EXTERIOR IMPROVEMENTS
BUILDING : GENERAL BASEMENT DIVISION 32

No. Description Unit Qty Price Amount (SR)

722,000.00

746413405.xlsx/Div- 32 EXIMP/Page381
BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA OPTIONAL PROVISIONAL ITEMS
BUILDING : GENERAL BASEMENT

No. Description Unit Qty Price Amount (SR)

OPTIONAL PROVISIONAL ITEMS

The bidders are hereby advised to price the


below items including profit and
attendance. These items will be considered
as provisional optional items which will be
executed depending upon the sole
discretion of Employer / Engineer.
However, the bidders are requested to
make required provisions in the time
program for LS risks.

Excavation Perimeter Shoring/Retention


System

Design, supply, install and maintain


completeexcavation perimeter/shoring
system as necessary,to accept and protect
the excavation, inaccordance with the
drawings, specification and
Soilinvestigation report.

Shoring system with all required ancilaries


LM 948
for excavation height 3.5m

Provision of porta cabin (optional) No 2

746413405.xlsx/Optional Provisional Items/Page382


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA OPTIONAL PROVISIONAL ITEMS
BUILDING : GENERAL BASEMENT

No. Description Unit Qty Price Amount (SR)


TOTAL CARRIED TO COLLECTION

COLLECTIONS:

OPTIONAL PROVISIONAL ITEMS : 1 / 1

746413405.xlsx/Optional Provisional Items/Page383


BILL OF QUANTITIES

PROJECT : LA PORTO MIXED USE DEVELOPMENT PROJECT


OWNER : AL AKARIA OPTIONAL PROVISIONAL ITEMS
BUILDING : GENERAL BASEMENT

No. Description Unit Qty Price Amount (SR)

TOTAL TO SUMMARY

746413405.xlsx/Optional Provisional Items/Page384