You are on page 1of 3
SAy Ka Department of Environment and Natural Resources Enviroamental Management Bureau SS Regional Office No. IV - B MIMAROPA ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential decree 1586) ECC-R4B-1001-0005 Department of Environment and Natural Resources (DENR), through the Environmental Management Bureau, Region IV- MIMAROPA. SUBJECT ONLY to the conditions and restrictions set-out in this ECC and in the attached document labeled as Annex A and B. PROJECT DESCRIPTION ‘This ECC covers the Super M Pension House Project, having a total area of 300.00 square meters, covered by TCT No. T-125791, located at Morente St, Zone II, Pinamalayan, The project is a two-storey building with rooftop which has six (6) units rooms for accommodation and four (4) units rooms for staff and storage, small canteen and reception area located at the first floor while at the second floor has six (6) units rooms for ea promabong aay rropoeed 9010) ood ors Likewise, the rooftop is a This ECC is issued in compliance to the requirements of Presidential Decree No. 1586, in accordance to Department Administrative Order No. 200330. The Bureau, however, i not from reevaluating, adding, removing, and correcting any deficiencies or errors that may be found to be inconsistent with the Revised Procedural Manual of DAO 2003-30 after issuance of this ECC. Issued at EMB-MIMAROPA Region Manila, Philippines this Approved by: Zc enp soci 2 FOLENTINO, JR. Regional Foc a here Super M Poon Home Propet CC: The RED DENR Region IV-5 ‘The PENRO - Oriental Mindoro The CENRO- Socoro 6° Floor DENR by the Bay Bldg., 1515 Roxas Bivd., Ermita Manila RD’s Office 536-9786; Admin/Finance Division Telefax No. 400-5960 Annex A L CONDITIONS (A. ENVIRONMENTAL MANAGEMENT & MONITORING PLAN (EMMoP) 1. The proponent shall ensure that all _ commitments, 2. An Environmental Officer (EO)/ Pollution Control Officer (PCO) must be appointed to bene ervicormertal mnpsct menegemant related aspects of fie project as specked ire pac Management Pan (WP) and he Erwronnen Menorrg Pan Siacusratial poet bee Dae Renee ke Gato measures in the IEE; eee ee Oe 3. The proponent shall submit an Abandonment Plan to the EMB MIMAROPA Region ‘at least one year prior to the project's abandonment. The plan shall include rehabilitation , remediation of areas affected by the project and Proposed altemative projects in the area. GENERAL CONDITIONS 4. The project operations shall conform to the applicable provisions of PD 1586 (Philippine Environmental impact Statement System, DAO 2003-30), RA 6969 (Toxic Substances, Hazardous Waste Control Act of 1990), RA 8749 ( Philippine Clean Air Act of 1999), RA 9003 (Ecological Solid Waste Management Act of 2000), RA 9275 (Philippine 5. Abillboard containing this message : “ Notice to the Public, This project ( Super WM Pension House Project of { Ma. Mriem U. Felx) hes been Issued’ on Environmental Certificate Office within ninety (90) days from receipt of the Certificate; RESTRICTIONS 6. oar emer tea Chine Poteet ic shall be a sufficient cause for its cancellation or suspension and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos (Php 50,000.00) thereof; 7. In case of transfer of ownership/management tum-over of this project, these same conditions and restrictions shall apply unless otherwise revised in writing. In such case, Ms. Miriam L. Felix shall be required to notify the EMB ~ MIMAROPA Region within fifteen (15) days ©. R.No. Processing Fee : Php 4,000.00 Date A FCC-RaH. 1005 Sayer M Pranion Meme PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponent, other concemed govemment agencies and LGUs in the Of the project and for better coordination in mitigation on the impact of the project on its surrounding areas and to the environment. By way of recommendation, the following have been taken notice of by the EMB MIMAROPA 7. Ms. Miriam L. Felix shail ensure that socio-economic concems of various stakeholders are adequately Pinamalayan, Oriental Min addressed. 2 Ms. Miriam L. Felix should implement , | Pinamalayan, Oriental Min collection, recycling and disposal mechanism for solid | doro LGU waste in accordance with RA 9003. 3. The occupational ‘and safety , Oriental Min must be complied with by Ms. Miriam L. Felix. doro LGU 4. The adequate storm drainage canal, concrete culverts and | Pinamalayan, ‘Oriental other flood control measures need to be provided to | Mindoro LGU adequately receive and channel the run-off of silt laden rainwater to the nearby receiving body of water. 5. The structural design of component structures of the project | Pinamalayan, ‘Oriental shal conform wit the design gudelives of Buksng Code of | Mindoro LGU the Philippines. 6. Temporary Sanitary toilet facilities should be provided for the | Pinamalayan, ‘Oriental construction workers, and any waste should be property | Mindoro LGU disposed of so as not to cause nuisance to the immediate environment. 7. Ms. Miriam L. Felix shall secure permits/clearances from concemed agencies and shall submit to this Office prior to Project implementation. Proponent, __ Pinamalayan, Oriental Mindoro LGU and Other Goverment Agencies concemed B. Environmental Planning Recommendations for the Proponent 7. Ms. Miriam L. Felix shall undertake close monitoring in all stages of the project efficiency implementation to maintain a high level of environmental safety and performance and immediately address any environmental hazards. For dissemination and proper action of the parties concemed. ae Beyer tmate. Regional Director

You might also like