Professional Documents
Culture Documents
Work Required:
Main Battery servicing for due capacity check. General visual inspection to be carried out cleaning
tobecarried out electrolyte level to be check cap check to be carried out. Capacity check to
becarried.Disassembly and Assembly to be carried out.
General visual inspection carried out – okay and satisfactory cleaning carried out – okay
andsatisfactoryelectrolyte level to be check – okay and satisfactory capacity check carried out okay -
satisfactorily, Disassembly and Assembly carried out okay - satisfactorily and passed @ 58 minute/ 20v
i.a.w Amp-39-B-24-32-01-00A-200A-K Main battery (44 Ah) - Servicing. Amp- 39-B-24-32-01-00A-530A-K,
Main battery (44Ah) Disassemble procedure, 39-B-24-32-01-00A-710A-K Main battery (44 Ah) - Assemble
procedure IETPRev 39
Parts Used:
Part Number Description Serial # Qty Batch Number
Signed....................................Name...........,.......................Authority.....................................Date............................
The signature above “Certifies that the work specified was carried out i.a.w. Nig. CAR Part 6.5.1.7 and in
respect to that work the aircraft/aircraft component is considered approved for release to service”