Professional Documents
Culture Documents
Work Required:
Auxiliary Battery servicing for due capacity check. General visual inspection to be carried out cleaning to
be carried out electrolyte level to be check cap check to be carried out. Capacity check to be carried.
Disassembly and Assembly to be carried out.
General visual inspection carried out – okay and satisfactory cleaning carried out – okay and satisfactory
electrolyte level to be check – okay and satisfactory capacity check carried out okay –satisfactorily
Disassembly and Assembly carried out okay - satisfactorily and passed @ 57 minute/ 20vi.a.w AMP-39-
B-24-32-02-00A-200A-K Auxiliary battery (28 Ah) - Servicing, AMP-39-B-24-32-02-00A-530A-K Auxiliary
battery (28 Ah) - Disassemble procedure, and Amp-39-B-24-32-02-00A-710A-K Auxiliary battery (28 Ah) -
Assemble procedure IETP Rev 39.
Parts Used:
Part Number Description Serial # Qty Batch Number
Signed....................................Name...........,.......................Authority.....................................Date............................
The signature above “Certifies that the work specified was carried out i.a.w. Nig. CAR Part 6.5.1.7 and in
respect to that work the aircraft/aircraft component is considered approved for release to service”