You are on page 1of 5

Project

Name
XXXX Project

Document
Name
Configuration Management
Strategy

Document Configuration Management Strategy


Identifier

Version: 01_00 Draft

Date: 01 July 2010

Authorities Author: Author Name

Owner: Exec Name


XXXX Project Configuration Management Strategy

Client: Client Name

573438670.docx Page 2 of 5
XXXX Project Configuration Management Strategy

1 Introduction

2 Configuration Management Procedure

3 Issue and Change Control Procedure

4 Tools and Techniques

5 Records

6 Reporting

7 Timing of Activities

8 Roles and Responsibilities

9 Scales
9.1 Priority of Issues
These values are to be used in the Priority field in the Issue Register.

Value Interpretation

573438670.docx Page 3 of 5
XXXX Project Configuration Management Strategy

9.2 Severity of Issues


These values are to be used in the Severity field in the Issue Register.

Value Interpretation

573438670.docx Page 4 of 5
XXXX Project Configuration Management Strategy

Document History
Document This document is only valid on the day it was printed.
Location
The source of the document will be found in the XXXXX directory.

Template This document is based on the Configuration Management Strategy TP V01_00


template and Configuration Management Strategy PD V01_00 Product Description.

Revision
History

Version Revision
Number date Summary of Changes

01_00 01Jul2010 Original

Approvals This document requires the following approvals.

Signed approval forms are filed in the XXXXX directory.

Date of
Name Signature Title Issue Version

01Jul2010 01_00

Distribution This document has been distributed to:

Date of
Name Title Issue Version

01Jul2010 01_00

573438670.docx Page 5 of 5

You might also like