You are on page 1of 2

InfraPrime and InstantOn in Partnership to Launch Net Zero PowerShell® Sites To

Accelerate 24/7 Net Zero Data Center Projects Nationwide with The Electric Grid Providers

InfraPrime InstantOn Take Action Towards The Race to Net Zero to Address The Digital
Transformation Quickening Trend for Market Adoption of Cost-Efficient Net Zero Data Centers
Rapid Commercial On Deployment (COD).

Europe is expected to be Climate Neutral by 2030 with the data center pioneers’ new load
absorption across the regions. InfraPrime’s Clean Hydrogen Partnership with the New Consortium
of seven members; Equinix, InfraPrime, RISE, Snam, SolidPower, Tec4Fuels, Vertiv) lead Low
Carbon Fuel Cell Development with Data Center with the European Union sponsored projects.
InfraPrime InstantOn are in partnership to provide Net Zero PowerShell® sites nationwide with
the Electric Grid Providers to align with the ambition of the Carbon Neutral Data Center Pact for
site selection of prominent Clean Energy Grid locations; each site has access of clean energy
grid in duality with InfraPrime Carbon Free Energy (CFE) services on premise and emission
decarbonization reporting; all optimized for efficiency by InstantOn leading microgrid services to
minimize per kilowatt/hour energy spend InfraPrime InstantON in collaboration with numerous
nationwide electric utilities in the west, south and east regions to take action for carbon neutrality
pathways towards net positive results.

In North America, there is an expected need for 20–40-Gigawatt net zero load absorption by
2030. The aim of the Net Zero PowerShell® is to be 75% carbon neutral by 2025 and 100% by
2030 for energy consumption across our national footprint. This pledge includes cloud
infrastructure, private enterprise operations and colocation locations.

This is a shift from conventional data center build practice. InfraPrime InstantOn aims to invert
the status quo, embrace a Life Cycle Assessment, and deploy a holistic approach towards taking
action in Sustainability. The primary delivery is a green grid operating 24/7 by electric grid
operators with clean energy capacity, InfraPrime provides carbon free energy (CFE) design on
premise to reduce GHG. Each of these locations has the potential for on-site renewable energy
generation and by kilowatt hour zero emission reporting for energy sources to support
simultaneous resiliency uptime performance for the low-latency network interconnection and
power reliability. Specifically, the power available for all IT operations at each site allows for no
more than 5 minutes of downtime per annum to meet 99.999% uptime expectations. InfraPrime
InstantON PowerShell® is led by industry leading co-location providers at local regions with a
standard operating Service Level Agreement (SLA) guarantee. These include a minimum annual
uptime of 99.999%. The Net Zero PowerShell® sites are chosen for its site attributes and track
record by the electric grid providers, maintaining 99.99999% for the past decade, and can
continue to meet the Data Center reliability requirement through 2030 and beyond.

“Our work to protect families, communities and businesses has been catapulted by the many
challenges they are facing. The path to carbon negative cannot be planned haphazardly. It will
take ambition and action. By teaming up with industry innovators and experts, we can take the
steps in the right direction." said AJ Perkins, President of Instant ON. “Working with the team at
InfraPrime to bring a solution like the Net Zero PowerShell® to this segment at a time like this is
critical.”

“InfraPrime InstantOn working as one team addresses the Net Zero Data Center requirements
with the Net Zero PowerShell®, '' said Susanna Kass and Dr. Alberto Ravagni, InfraPrime co-
founders”, “the speed of deployment shall accelerate the Net Positive results to tackle Climate
Change by 2030”. “We are excited to work with the InstantON leadership and team on market
adoption to drive new deployments of POD that provides a varied rack density at kilowatt, and
scales up in 250-500 kW modules. PowerShell® is available to support 200-400 megawatts
campus deployment with a Net Zero Pathway to meet the Carbon Neutrality (Positive) results.”

InfraPrime (infra-prime.com) Instant ON

You might also like