Required Workstation
S/N WORK NAME Material Tool capacity
Person/line number
STATIO Per Per 8
N hour hour
outline Remove the tapping screw from the Material box electronic
2 1 Outline2
work Back Cabinet 1pcs screwdriver
Remove the tapping screw from the Material box electronic
3 1 Outline3
Plastic Boss bracket 1pcs screwdriver
EVA Sponge
Stick the EVA Sponge on the Front
4 425*8*1 2pcs 1 Outline4
cabinet
290*8*1 2pcs
350 Tv
44 Tv
High Voltage
Take the LED Screen and High Voltage connection
Assembling line
Main board
1pcs
electronic
12 Fix the Main board TR3*8 4pcs 1 8
screwdriver
Sericalnumber
paper:1pcs
Down Terminal
bracket 1pcs
Fix the Down Terminal bracket and TR3*6 1pcs electronic
13 1 9
Side Terminal bracket Side Terminal screwdriver
bracket 1pcs
TR3*6 1pcs
14 Insert the cables-1 1 10
Back cabinet 1
Cover the Back cabinet and Fix the electronic
16 pcs 2 12
Back cabinet screwdriver
TR3*10 10 pcs
Fix the Back cabinet and Terminal
17 M3*8 4pcs Screwdriver 1 13
bracket
Fix the Back cabinet and Plastic boss TR3*10 4pcs
18 Screwdriver 1 14
bracket Flat head
USB 1pcs
22 USB and SCART test SCART test 1 TEST 2
machine 1pcs
23 HDMI and YPbPr test 1 TEST 3
24 AV test 1 TEST 4
26 Check 1 TEST 6
Ties the Power cord/Stick the serial
27 2 Pack-1
number paper
Pack the television and put the top
28 1 Pack-2
foams
Stick the Serial number paper and cartoon box
29 1 Pack-3
carton box sticker sticker:1pcs
Pack
30
ing in storehouse 1 Pack-4
31 line Repair 2
Required Production
Workstation
S/N WORKSTATION NAME Material Tool Person/lin capacity
number
e Per Per 8
hour hour
37 300
1 Take the SKD box 1 Outline1 Tv Tv
Remove the
electronic
2 tapping screw from Material box 1pcs 1 Outline2
screwdriver
outline work the Back Cabinet
Remove the
tapping screw from electronic
3 Material box 1pcs 1 Outline3
the Plastic Boss screwdriver
bracket
Stick the EVA EVA Sponge 525*8*1
4 Sponge on the 2pcs 1 Outline4
Front cabinet 290*8*1 2pcs
5 Assembling line Take the LED High Voltage 1 1
Screen and High connection wire 121L
Voltage connection Panel wire E
wire 121L/Panel
wire E and insert it
on the LED Screen
Tapping
Fix the Press-panel
screw(TR3*10) Flat
6 bracket on the Screwdriver 1 2
month and has
Front cabinet
washer D=7
20*14*8 2pcs
7 Stick the EVA Mat 20*14*12 1pcs 1 3
20*14*16 1pcs
Electronic
TR3*10 4pcs
Fix the Plastic boss screwdriver
TR3*6 4pcs
8 bracket on the 1pcs 2 4
Plastic boss bracket
front cabinet screwdriver
1pcs
1pcs
Power board bracket
1pcs electronic
Fix the Top Power
9 TR3*10 1pcs Screwdriver 1 5
board bracket
TR3*8 2pcs 1pcs
M3*5 1pcs
Fix the Power
electronic
board and insert Power board 1pcs
10 screwdriver 1 6
the High Voltage M3*5 4pcs
1pcs
connect wire 121L
USB 1pcs
USB and SCART
19 SCART test machine 1 TEST 2
Testing and test
1pcs
checking Line HDMI and YPbPr
20 1 TEST 3
test
21 AV test 1 TEST 4
23 Check 1 TEST 6
27 in storehouse 1 Pack-4
28 Repair 2
Pack the Remote
29 2 Pack-6
control
Side Terminal
Fix the Side bracket:1pcs electronic
12 terminal bracket Main board: screwdriver:1p 1 9
and Main board 1pcs cs
M3*6: 4pcs
Fix the Down Down terminal
terminal bracket bracket: 1pcs
screwdriver:
13 and stick the M3*6: 2pcs 1 10
1pcs
serial number serial number
paper paper: 1pcs
Fix the wall wall mount
mount bracket bracket:2pcs screwdriver:1
14 1 11
and stick the M4*8: 4pcs pcs
EVA Mat EVA :2pcs
120*10*1mm
Stick the EVA
2pcs
16 Sponge on the 1 Outline3
220*10*1mm
Back cabinet
1pcs
Insert the
Speaker
17 cable/Power wire ties:2pcs 1 13
cord/Function
key board cable
Fix the Back
Back
cabinet and
cabinet:1pcs screwdriver:2
18 Front cabinet 2 14
TR4*10: 10pcs pcs
and Terminal
M3*6:3pcs
bracket
19 Updata and aging USB 1pcs 1 15
Testing and
20 checking Line AC and DC test 1 TEST 1
29 in storehouse 1 Pack-4
30 Repair 2
Pack the Remote
31 2 Pack-6
control
Workstation for LED 42’’ TV
Production
Required
WORKSTATIO Workstation capacity
S/N NAME Material Tool Person/lin
N number Per
e Per
8
hour
hour
Power board:
Fix the Power electronic
11 1pcs 1 8
board screwdriver:1pcs
M3*6: 4pcs
Side Terminal
Fix the Side bracket:1pcs
electronic
12 terminal bracket Main board: 1pcs 1 9
screwdriver:1pcs
and Main board M3*6: 2pcs
M3*6:4pcs
Down terminal
Fix the Down
bracket: 1pcs
terminal bracket
13 M3*6: 2pcs screwdriver: 1pcs 1 10
and stick the serial
serial number
number paper
paper: 1pcs
USB 1pcs
USB and SCART
20 Testing and SCART test 1 TEST 2
test
checking Line machine 1pcs
HDMI and YPbPr
21 1 TEST 3
test
22 AV test 1 TEST 4
23 TV and VGA test 1 TEST 5
24 Check 1 TEST 6
Ties the Power
25 Packing cord/Stick the
2 Pack-1
serial number
paper
Pack the television
26 and put the top 1 Pack-2
foams
Stick the Serial
cartoon box
27 number paper and 1 Pack-3
Line carton box sticker
sticker:1pcs
28 in storehouse 1 Pack-4
29 Repair 2
Pack the Remote
30 2 Pack-6
control