Professional Documents
Culture Documents
2 | Company Presentation
AGENDA
1 WHO WE ARE
Management, key figures, history
2 WHERE WE ARE
Footprint
3 WHAT WE DO
Core business and products
3 | Company Presentation
INVESTMENTS
CAPEX increased to
EUR 144m
5 | Company Presentation
Commencement
Founding of Installation of of industrial
Nordex in the 100th rotor blade
Denmark First company production
Nordex turbine
worlwide to Completion of the Installation
produce a world´s first series of the 2000th
MW-class turbine multi-MV turbine Nordex turbine
Launch of
Launch of Launch of Nordex and 4 MW platform
Gamma generation Delta generation Acciona Windpower Delta4000
become one company
AGENDA
1 WHO WE ARE
History and Key figures
2 WHERE WE ARE
Footprint
3 WHAT WE DO
Core business and products
8 | Company Presentation
GERMANY
Nacelle
Blade
SPAIN
Nacelle Nacelle (2)
Blade
INDIA
Towers (1) Nacelle
Towers (1)
Blade
BRAZIL
Nacelle
Towers (1) SOUTH AFRICA
Towers Towers (1)
(1)
Manufacturing sites
9 | Company Presentation
TURKEY 1,667 MW
PAKISTAN 250 MW
INDIA 78 MW
CHINA 1,053 MW
JAPAN 73 MW
SOUTH KOREA 65 MW
CANADA 203 MW AUSTRALIA 264 MW
USA 3,185 MW EGYPT 63 MW
MEXICO 989 MW SOUTH AFRICA 563,4 MW
COSTA RICA 50 MW OTHERS 330 MW
COLOMBIA 20 MW
BRAZIL 857 MW
URUGUAY 309 MW
CHILE 105 MW
© Nordex 2018
10 | Company Presentation
Northern
Europe
3.5 GW
Germany
North Medi- 2.8 GW
America terranean
2.6 GW 3.4 GW
Turkey &
Middle East
2.0 GW
Africa
Latin 0.5 GW
America
1.5 GW
© Nordex 2018
Hollich-Sellen wind farm, Northwestern Germany
12 | Company Presentation
AGENDA
1 WHO WE ARE
History and Key figures
2 WHERE WE ARE
Footprint
3 WHAT WE DO
Core business and products
13 | Company Presentation
Off-site
On-site
Selection of location
Ownership
Optimal siting
Wind measurements
Soil survey
Sound / shade emission
Economic viability
Grid connection
Special purpose registration
Environmental permitting
Building permitting
Project Development, Wind Farm Production and Wind Farm Services and
Marketing, Financing System Planning Technical Implementation Operations Maintenance
Leading company in Review customer Assemble WTG Offer additional Provide high quality
France micro-site planning services: increased service to minimize
Produce selected
demand due to new downtime and
Active also in India Support customers components (blades,
wind farm investors maximize yield
(co-development) to control systems)
interested in stable
receive approvals and
Install onsite cash flows
to optimise park layouts
Carry out initial operation
15 | Company Presentation
N133/4.8
4 MW +
N149/4.0-4.5
N100/3300 Optimum product defined by
N117/3000-3600
N131/3000-3900
AW116/3000
wind conditions, local content
3 MW +
AW125/3000-3150
AW132/3000-3465 regulations and regulatory
AW140/3000
AW148/3000
or logistic constraints
N90/2500
2 MW + N100/2500
N117/2400
© Nordex 2018
San Román wind farm. Texas, USA
Nordex Group