You are on page 1of 11

09J110015 KG-DWN-98/2 CLUSTER-II FPSO

OVERVIEW OF FLARE TOWER LIFTING


3M GREEN BUFFER 3M GREEN BUFFER

7.5M ROAD BUFFER

TYPE-B
Bulk Meter 50tx50m
7.5M ROAD BUFFER
15t x 100m

Powergrid Substation
(ESS)

Security Guard House


PLANTING

Substation
22KV
Transformer
Room
6.6KV Main Substation (MSS-2)
YD reserved for future development

Panel & Opening (New)


Hull Shop

YST 04 -9.00
YST D7
(255m x 110m) Switch Room
SSA-2
Switch Room
SSA-1
FLARE TOWER
YST 13
PICK-UP FROM YST03 1 300T GANTRY CRANE

-9.00
-9.00

Sub-Station #D

Sub-Station #C1
Diesel Station Diesel Station

Multi-function Building #5 400T GANTRY CRANE

Multi-function Building #4
(255m x 52m)

(255m x 52m)
+5.741

(350m x 66m)
(360m x 89m)
(350m x 66m)

(412m x 66m)
YST D6

YST D5

YST D2

YST D1
YST D4

YST D3

YST 03
YST 05
YST 12
YST 14
FLARE TOWER

-9.00
PICK-UP & UPBENDING 2 -8.00 -8.00

-12.00 -9.00 50T LLC


50tx50m
FLARE TOWER

-15.00 to -18.00
-15.00 to -18.00
15t x 100m

-9.00
LOADING
LEG 3

-8.50
-12.00

LEG 2

-8.50 -11.0 -8.50


Switch Room#6C

LEG 3

LEG 2

LEG 1
-9.00 -9.00 -9.00
-9.00

Switch Room#4B Switch Room#4C

YST 15
YST 16
YST 17

YST 02
YST 11

YST 10

YST 09

YST 08

YST 07

-9.00 YST 06
Switch Room#6B

-18.00 to -21.00

-18.00 to -21.00
Switch Room#4A
Switch Room#6A

UP

UP

LAY
DOWN

LAY
DOWN

-15.00 -15.00 -15.00


-25.00
-25.00
-25.00
YST 01 -12.00

M25 FLARE TOWER LIFTING ACTIVITIES

1. Position L3601 between distance marks 610m & 660m at


YST03.
2. Lift the flare tower (FT) from YST03 lay down area with the
forward starboard side hook.
3. Rotate flare tower 900 clock wise.
4. Transport L3601 together with FT to YST DD7 using tugs.
5. Position L3601 in front of dock gate and lower flare tower on
the keel blocks arranged in the dock floor.
6. Change rigging in the main hook blocks for the upending of
flare tower.
7. Rig up and lift the flare tower from the keel blocks and carry
out upending.
8. Transport L3601 to YST15 with aid of tugs. 09J110015
sembcorp KG-DWN-98/2
9. L3601 approach FPSO from the starboard side and position
marine CLUSTER-II FPSO
between frames 94 & 97.
10. Navigate L3601 in the forward direction of FPSO to align
FLARE TOWER LIFTING PLAN
flare tower between frames 102 & 104.
10. Orient L3601 30o clock wise to the CL of FPSO.
11. Lower flare tower on to the stools.
09J110015 KG-DWN-98/2 CLUSTER-II FPSO FLARE TOWER LIFTING
PICK UP AT YST03 (ELEVATION & SECTION VIEW)

27972
H1 H1 H1

11.3°
10.1°

SLING 115MM X 30M


MBL 1000MT (2 NOS.)

SLING 115MM X 45M


11° 28° MBL 1000MT (2 NOS.)

SPREADER BAR
49654

SWL 360MT X 12M

SHACKLE SWL 200MT


(2 NOS.)
6405 5787
B A
SLING 115MM X 20M
LEG 2 LEG 2 MBL 1000MT (2 NOS.) SHACKLE SWL 300MT
(2 NOS.)

SHACKLE SWL 300MT


(2 NOS.)
3.4° 3.4°

LEG 1 LEG 3 LEG 1


LEG 3