1. Determine the CN for a development on soils consisting of 30 % group A and 70 % group D.
The proposed land use is
32 % Residential which is 25 % impervious
18 % Residential which is 65 % impervious 15 % Paved Roads with curbs and storm sewers 17 % Open Land with 60 % fair cover and 40 % good cover 18 % Parking Lots, plazas, schools, etc.
2. A 1,400,000 m² watershed is to be developed. The CN for the proposed development is 80,
and 60 % of the hydraulic length will be modified by gutters and storm drains; 30 % of the area will be impervious. The average slope is 2 %. Compute the present and future peak runoff from a 75 mm rainfall. The present CN is 70.