CE 141-2 CW3

Solve the following:

1. Determine the CN for a development on soils consisting of 30 % group A and 70 % group D.


The proposed land use is

32 % Residential which is 25 % impervious


18 % Residential which is 65 % impervious
15 % Paved Roads with curbs and storm sewers
17 % Open Land with 60 % fair cover and 40 % good cover
18 % Parking Lots, plazas, schools, etc.

2. A 1,400,000 m² watershed is to be developed. The CN for the proposed development is 80,


and 60 % of the hydraulic length will be modified by gutters and storm drains; 30 % of the
area will be impervious. The average slope is 2 %. Compute the present and future peak
runoff from a 75 mm rainfall. The present CN is 70.

Good luck!!!!!