A A
PLANTA MURO Y JARDINERIA
MURO POSTE
MANUFACTURA EXISTENTE
CAJA DE EXISTENTE N°4
REGISTRO DE JARDINERA
DRENAJE A DEMOLER
CAJA DE
REGISTRO DE CALDERA
DRENAJE HRSG-01

POSTE
N°3
E 0.00 F POSTE
N°5
CONTINUA
SAC-BR008-Ø3/4"
EN LINEA SAC-BR010-Ø1"
PLANO: KC-ME-EER-031
B H 1419 5417 400 1315 219 H B

666
CALDERA
0.20 CONTENEDOR G-01 BUZON HRSG-02
SAC-BR007-Ø3/4" BZ-BT-08 SAC-B
0.00

1180
R001-
Ø1" SAC-BR006-Ø3/4"
CALDERA HRSG-01 SA
G C-
BR
00 3 /4
"
1-Ø

1279
SAC-BR004-Ø3/4" -Ø
SAC-BR007-Ø3/4" 1" 0 09
-B R

220
BUZON C
0.00 BUZON BZ-MT-04 SAC-BR008-Ø3/4" J J SA SA 3 /4
"
0.00 C- 5-Ø

SAC-BR009-Ø3/4"
BZ-MT-05 BR
SAC-BR006-Ø3/4" 00

1430
MURO Y JARDINERIA 00 BR
BUZON BUZON BUZON 2-Ø C-
681219 EXISTENTE 1" SA
C BZ-BT-04 BZ-BT-03 E BZ-MT-03 F SA
C- C
BR SAC-BR007-Ø3/4"

SAC-BR005-Ø3/4"
00

GENERADOR AUXILIAR
POSTE 2- Ø 1"
G N°2 G 1" 2-Ø
00
BR
SAC-BR003-Ø3/4" C-
SA
0.00
0.20 CONTENEDOR G-02
AREA
TALLER

SAC-BR009-Ø3/4"
0.00
VISTA 3D

10779
SALA ELECTRICA
BUZON
D ISLA DE BZ-BT-07 D
POSTE

G.E.AUX.
0.00 COGENERACION N°6

10025
BUZON
BZ-BT-06

SAC-BR005-Ø3/4"
F F
POSTE 681 219
POSTE N°1
N°11
VIA DE CIRCULACION

FOSA PARA

SAC-BR009-Ø3/4"
0.20
CALLE FACIALES

CONTENEDOR G-03 TANQUE


E 0.00 DE ACEITE E
0.20 SUCIO

I I
C

SAC-BR005-Ø3/4"
BUZON 0.00 BUZON D

1020
BZ-BT-01 BZ-BT-02 BUZON 0.00
G BUZON

3332
BZ-MT-02 BZ-BT-05
E BUZON 1416 5353 1782 E
BZ-MT-01
0.00 VALIDO PARA
SAC-BR003-Ø3/4"
CONSTRUCCION

956
F POSTE
CALDERA HRSG-02 H H F
N°10

SAC-BR002-Ø1"
3756
SAC-BR004-Ø3/4"
BUZON
0.20

2800

2800
EXISTENTE
681219
N°14 CONTENEDOR G-04
B SAC-BR003-Ø3/4"
0.00
0.00

269 931

269

745
POSTE
SAC-BR002-Ø1" SAC-BR002-Ø1"
N°8
D D

28
269 931

269 931

C D
0
8 0.00
873 POSTE
932

G A N°7 PLANOS DE REFERENCIA : G


SAC-BR001-Ø1" SAC-BR001-Ø1" SAC-BR001-Ø1" SAC-BR002-Ø1"
268

550 8182 14999 1330 8490 1449 KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
POSTE
1"
R0
01-
Ø N°9 B LEYENDA:
C- B
SA
932

BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1


268

AREA PTARI SEGUN CLASIFICACION AASHTO e = 150 mm


A
23°

CARPETA ASFALTICA EN CALIENTE e = 150 mm


H C C GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
CONTINUA
EN LINEA SAC-BR010-Ø1" SOLADO
PLANO: KC-ME-EER-031
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)

TIERRA ORIGINAL

TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE


100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm
26 27 28 29 30 31 32 33
PIPING DE SUMINISTRO DE AIRE COMPRIMIDO
I I
PLANTA NIVEL -0.00 NOTAS:
ESCALA 1: 75
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88 1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR DE AIRE COMPRIMIDO A
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR ISLA DE COGENERACION
DIBUJÓ ---
FECHA A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 2 6 1 --- KC-ME-EER-026 1/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

3243 3190
D 660 1923 660
D
1550 1640

4.07
A 3.93 A

132

4"
SA

3/
C-


B

04
660

R0

R0
04

-B
-
Ø

C
3.27

3/

SA
4"

SAC-BR004-Ø3/4"

SAC-BR004-Ø3/4"
3.05

871

650
B B
2.40 2.40 SAC-BR003-Ø3/4" SAC-BR003-Ø3/4"

SAC-BR003-Ø3/4"
CONTINUA CALDERA HRSG-02
EN LINEA SAC-BR010-Ø1" CALDERA HRSG-02

2133

2133
SAC-BR004-Ø3/4"

SAC-BR004-Ø3/4"
PLANO: KC-ME-EER-031

SAC-BR003-Ø3/4"
C D 1081
C
SAC-BR001-Ø1"

266
SAC-BR003-Ø3/4"

560
1000

1759 1923 74 2675


CANALIZACION CANALIZACION CANALIZACION CANALIZACION
DE TUBERIAS DE TUBERIAS 0.27 0.27
0.20 CONTENEDOR DE TUBERIAS DE TUBERIAS
1450

1200
G-04
300 70 730 300 269 931 269 931

269

269

269
0.00 0.00 0.00 0.00 0.00 255 345 SAC-BR003-Ø3/4"

SAC-BR001-Ø1" 585
450

450

450

450
D 370 1030 SAC-BR002-Ø1" SAC-BR002-Ø1" D
-0.45 -0.45 -0.45 -0.45

700
BUZON
BUZON -0.55 BZ-BT-05
269 931 BZ-MT-02 69
-0.75 -0.75

1300

1300

1300
-0.75 -0.75
1400

50
SAC-BR001-Ø1"
650

650

650

650
COLOCAR JUNTA CANALIZACION 150 300 150
-1.10 DE DILATACION TIPO -1.10 -1.10 -1.10 DE TUBERIAS SAC-BR003-Ø3/4"
TECNOPOR ESP. 20mm

200
-1.35 -1.35 -1.35 -1.35 -1.35

50

50

50
50

200 69 731 200 200 800 200


200 69 731 200 -1.35

E E
SECCION A-A SECCION B-B SECCION C-C SECCION D-D
ESCALA 1: 25 ESCALA 1: 25 ESCALA 1: 25
H ESCALA 1: 25
3243 3215

660 1923 660 1579 1636

4.07
3.93
VALIDO PARA
132

4"
SA

CONSTRUCCION
3/
C

Ø
-B

8-
660

F F
00
00

R
8-

-B
Ø

3.27
3/

SA
4"

3.05
SAC-BR008-Ø3/4"
SAC-BR008-Ø3/4"

145
871

650

650
2.40 2.40 SAC-BR007-Ø3/4" SAC-BR007-Ø3/4"

G PLANOS DE REFERENCIA : G
CALDERA HRSG-01
KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)

SAC-BR007-Ø3/4"
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
CALDERA HRSG-01
LEYENDA:
SAC-BR008-Ø3/4"

SAC-BR008-Ø3/4"
2133

2133

2133
BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1
SEGUN CLASIFICACION AASHTO e = 150 mm
531 1343 1063
CARPETA ASFALTICA EN CALIENTE e = 150 mm
H 636 427 GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H

563
1923 73 SAC-BR007-Ø3/4"
CANALIZACION SOLADO
BUZON 0.27 DE TUBERIAS 0.27
BZ-BT-03 0.17 0.17 CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)
0.00 0.00 0.00
269

269

269
SAC-BR007-Ø3/4"
TIERRA ORIGINAL
619

-0.30 -0.30 -0.30 TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE


-0.35 SAC-BR007-Ø3/4"
100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm

700
BUZON
-0.55
200

83 BZ-BT-08
PIPING DE SUMINISTRO DE AIRE COMPRIMIDO
-0.75 -0.75 -0.75
I I

50
150 NOTAS:
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
SECCION E-E SECCION F-F 2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION
ESCALA 1: 25 ESCALA 1: 25

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88 1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR DE AIRE COMPRIMIDO A
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR ISLA DE COGENERACION
DIBUJÓ ---
FECHA A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 2 6 1 --- KC-ME-EER-026 2/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

32
A A
1782

475 1307

2.40

SAC-BR003-Ø3/4"
B B
F G 2244

11455
CALDERA HRSG-02

2133
10025 1430

SAC-BR003-Ø3/4"
475
SAC-BR009-Ø3/4" SAC-BR009-Ø3/4"
500

C C
0.46

540
SAC-BR009-Ø3/4" SAC-BR009-Ø3/4"

962
CALDERA HRSG-01
0.27
0.18
BUZON 220 0.17
462

235 445
BZ-BT-07 0.00

269
0.00 0.00

70

619
-0.20

350
-0.30 -0.35 -0.35 -0.30
SAC-BR003-Ø3/4"

700
SAC-BR002-Ø1"
-0.55

200

200
CANALIZACION
70 SAC-BR006-Ø3/4" 69

1250
-0.75 -0.75 DE TUBERIAS
-0.55 -0.75

750
FOSA PARA

50
D TANQUE DE D
ACEITE SUCIO 150 600 150
-1.10

-1.35 -1.35 -1.35

50
150 600 150

SECCION G-G SECCION H-H


ESCALA 1: 25 ESCALA 1: 25
E E

32

2579 1307

3.05

VALIDO PARA
CONSTRUCCION

650
SAC-BR007-Ø3/4"
F 2.40
F

2133
32

SAC-BR007-Ø3/4"
DE CALDERA HRSG-01
G 479
PLANOS DE REFERENCIA : G
KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
SALA ELECTRICA 399

543
SAC-BR009-Ø3/4"
FOSA PARA TANQUE 0.27 CANALIZACION LEYENDA:
262

DE ACEITE SUCIO 0.20 DE TUBERIAS


1795 0.07 681 219 BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1

269
0.00 0.00 0.00
200

SEGUN CLASIFICACION AASHTO e = 150 mm

619
CARPETA ASFALTICA EN CALIENTE e = 150 mm
422

350
-0.30 SAC-BR006-Ø3/4" -0.35 -0.30
H -0.45 SAC-BR005-Ø3/4" GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
200

200

200
SOLADO
1064

1250
-0.75 20 -0.75 -0.75
-0.55
1400

750
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)
614

BUZON
BZ-MT-03
-1.06 SAC-BR006-Ø3/4"" SAC-BR005-Ø3/4" TIERRA ORIGINAL
-1.10
-1.25
186

-1.35 -1.35 TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE

50
135 100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm
682

50

150 600 150


SAC-BR005-Ø3/4"
250 1395 150
PIPING DE SUMINISTRO DE AIRE COMPRIMIDO
-1.75
I I

SECCION I-I SECCION J-J NOTAS:


ESCALA 1: 25 ESCALA 1: 25 1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88 1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR DE AIRE COMPRIMIDO A
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR ISLA DE COGENERACION
DIBUJÓ ---
FECHA A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 2 6 1 --- KC-ME-EER-026 3/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 4/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 5/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 6/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 7/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 8/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 9/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

2
C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 10/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 11/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

B B

2
C C

D D

E E

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 12/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14

You might also like