Professional Documents
Culture Documents
26 27 28 29 30 31 32 33
A A
PLANTA MURO Y JARDINERIA
MURO POSTE
MANUFACTURA EXISTENTE
CAJA DE EXISTENTE N°4
REGISTRO DE JARDINERA
DRENAJE A DEMOLER
CAJA DE
REGISTRO DE CALDERA
DRENAJE HRSG-01
POSTE
N°3
E 0.00 F POSTE
N°5
CONTINUA
SAC-BR008-Ø3/4"
EN LINEA SAC-BR010-Ø1"
PLANO: KC-ME-EER-031
B H 1419 5417 400 1315 219 H B
666
CALDERA
0.20 CONTENEDOR G-01 BUZON HRSG-02
SAC-BR007-Ø3/4" BZ-BT-08 SAC-B
0.00
1180
R001-
Ø1" SAC-BR006-Ø3/4"
CALDERA HRSG-01 SA
G C-
BR
00 3 /4
"
1-Ø
1279
SAC-BR004-Ø3/4" -Ø
SAC-BR007-Ø3/4" 1" 0 09
-B R
220
BUZON C
0.00 BUZON BZ-MT-04 SAC-BR008-Ø3/4" J J SA SA 3 /4
"
0.00 C- 5-Ø
SAC-BR009-Ø3/4"
BZ-MT-05 BR
SAC-BR006-Ø3/4" 00
1430
MURO Y JARDINERIA 00 BR
BUZON BUZON BUZON 2-Ø C-
681219 EXISTENTE 1" SA
C BZ-BT-04 BZ-BT-03 E BZ-MT-03 F SA
C- C
BR SAC-BR007-Ø3/4"
SAC-BR005-Ø3/4"
00
GENERADOR AUXILIAR
POSTE 2- Ø 1"
G N°2 G 1" 2-Ø
00
BR
SAC-BR003-Ø3/4" C-
SA
0.00
0.20 CONTENEDOR G-02
AREA
TALLER
SAC-BR009-Ø3/4"
0.00
VISTA 3D
10779
SALA ELECTRICA
BUZON
D ISLA DE BZ-BT-07 D
POSTE
G.E.AUX.
0.00 COGENERACION N°6
10025
BUZON
BZ-BT-06
SAC-BR005-Ø3/4"
F F
POSTE 681 219
POSTE N°1
N°11
VIA DE CIRCULACION
FOSA PARA
SAC-BR009-Ø3/4"
0.20
CALLE FACIALES
I I
C
SAC-BR005-Ø3/4"
BUZON 0.00 BUZON D
1020
BZ-BT-01 BZ-BT-02 BUZON 0.00
G BUZON
3332
BZ-MT-02 BZ-BT-05
E BUZON 1416 5353 1782 E
BZ-MT-01
0.00 VALIDO PARA
SAC-BR003-Ø3/4"
CONSTRUCCION
956
F POSTE
CALDERA HRSG-02 H H F
N°10
SAC-BR002-Ø1"
3756
SAC-BR004-Ø3/4"
BUZON
0.20
2800
2800
EXISTENTE
681219
N°14 CONTENEDOR G-04
B SAC-BR003-Ø3/4"
0.00
0.00
269 931
269
745
POSTE
SAC-BR002-Ø1" SAC-BR002-Ø1"
N°8
D D
28
269 931
269 931
C D
0
8 0.00
873 POSTE
932
550 8182 14999 1330 8490 1449 KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
POSTE
1"
R0
01-
Ø N°9 B LEYENDA:
C- B
SA
932
TIERRA ORIGINAL
DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3243 3190
D 660 1923 660
D
1550 1640
4.07
A 3.93 A
132
4"
SA
3/
C-
-Ø
B
04
660
R0
R0
04
-B
-
Ø
C
3.27
3/
SA
4"
SAC-BR004-Ø3/4"
SAC-BR004-Ø3/4"
3.05
871
650
B B
2.40 2.40 SAC-BR003-Ø3/4" SAC-BR003-Ø3/4"
SAC-BR003-Ø3/4"
CONTINUA CALDERA HRSG-02
EN LINEA SAC-BR010-Ø1" CALDERA HRSG-02
2133
2133
SAC-BR004-Ø3/4"
SAC-BR004-Ø3/4"
PLANO: KC-ME-EER-031
SAC-BR003-Ø3/4"
C D 1081
C
SAC-BR001-Ø1"
266
SAC-BR003-Ø3/4"
560
1000
1200
G-04
300 70 730 300 269 931 269 931
269
269
269
0.00 0.00 0.00 0.00 0.00 255 345 SAC-BR003-Ø3/4"
SAC-BR001-Ø1" 585
450
450
450
450
D 370 1030 SAC-BR002-Ø1" SAC-BR002-Ø1" D
-0.45 -0.45 -0.45 -0.45
700
BUZON
BUZON -0.55 BZ-BT-05
269 931 BZ-MT-02 69
-0.75 -0.75
1300
1300
1300
-0.75 -0.75
1400
50
SAC-BR001-Ø1"
650
650
650
650
COLOCAR JUNTA CANALIZACION 150 300 150
-1.10 DE DILATACION TIPO -1.10 -1.10 -1.10 DE TUBERIAS SAC-BR003-Ø3/4"
TECNOPOR ESP. 20mm
200
-1.35 -1.35 -1.35 -1.35 -1.35
50
50
50
50
E E
SECCION A-A SECCION B-B SECCION C-C SECCION D-D
ESCALA 1: 25 ESCALA 1: 25 ESCALA 1: 25
H ESCALA 1: 25
3243 3215
4.07
3.93
VALIDO PARA
132
4"
SA
CONSTRUCCION
3/
C
Ø
-B
8-
660
F F
00
00
R
8-
-B
Ø
3.27
3/
SA
4"
3.05
SAC-BR008-Ø3/4"
SAC-BR008-Ø3/4"
145
871
650
650
2.40 2.40 SAC-BR007-Ø3/4" SAC-BR007-Ø3/4"
G PLANOS DE REFERENCIA : G
CALDERA HRSG-01
KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)
SAC-BR007-Ø3/4"
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
CALDERA HRSG-01
LEYENDA:
SAC-BR008-Ø3/4"
SAC-BR008-Ø3/4"
2133
2133
2133
BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1
SEGUN CLASIFICACION AASHTO e = 150 mm
531 1343 1063
CARPETA ASFALTICA EN CALIENTE e = 150 mm
H 636 427 GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
563
1923 73 SAC-BR007-Ø3/4"
CANALIZACION SOLADO
BUZON 0.27 DE TUBERIAS 0.27
BZ-BT-03 0.17 0.17 CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)
0.00 0.00 0.00
269
269
269
SAC-BR007-Ø3/4"
TIERRA ORIGINAL
619
700
BUZON
-0.55
200
83 BZ-BT-08
PIPING DE SUMINISTRO DE AIRE COMPRIMIDO
-0.75 -0.75 -0.75
I I
50
150 NOTAS:
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
SECCION E-E SECCION F-F 2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION
ESCALA 1: 25 ESCALA 1: 25
DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
32
A A
1782
475 1307
2.40
SAC-BR003-Ø3/4"
B B
F G 2244
11455
CALDERA HRSG-02
2133
10025 1430
SAC-BR003-Ø3/4"
475
SAC-BR009-Ø3/4" SAC-BR009-Ø3/4"
500
C C
0.46
540
SAC-BR009-Ø3/4" SAC-BR009-Ø3/4"
962
CALDERA HRSG-01
0.27
0.18
BUZON 220 0.17
462
235 445
BZ-BT-07 0.00
269
0.00 0.00
70
619
-0.20
350
-0.30 -0.35 -0.35 -0.30
SAC-BR003-Ø3/4"
700
SAC-BR002-Ø1"
-0.55
200
200
CANALIZACION
70 SAC-BR006-Ø3/4" 69
1250
-0.75 -0.75 DE TUBERIAS
-0.55 -0.75
750
FOSA PARA
50
D TANQUE DE D
ACEITE SUCIO 150 600 150
-1.10
50
150 600 150
32
2579 1307
3.05
VALIDO PARA
CONSTRUCCION
650
SAC-BR007-Ø3/4"
F 2.40
F
2133
32
SAC-BR007-Ø3/4"
DE CALDERA HRSG-01
G 479
PLANOS DE REFERENCIA : G
KC-EN-EER-008 ENCOFRADO DE CANALIZACIONES DE TUBERIAS (PÖYRY)
KC-ME-EER-029 SOPORTERIA DE PIPING GENERAL (PÖYRY)
KC-PD-EER-010 DISPOSICION GENERAL DE EQUIPOS (PÖYRY
SALA ELECTRICA 399
543
SAC-BR009-Ø3/4"
FOSA PARA TANQUE 0.27 CANALIZACION LEYENDA:
262
269
0.00 0.00 0.00
200
619
CARPETA ASFALTICA EN CALIENTE e = 150 mm
422
350
-0.30 SAC-BR006-Ø3/4" -0.35 -0.30
H -0.45 SAC-BR005-Ø3/4" GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
200
200
200
SOLADO
1064
1250
-0.75 20 -0.75 -0.75
-0.55
1400
750
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)
614
BUZON
BZ-MT-03
-1.06 SAC-BR006-Ø3/4"" SAC-BR005-Ø3/4" TIERRA ORIGINAL
-1.10
-1.25
186
50
135 100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm
682
50
DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 4/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 5/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 6/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 7/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 8/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 9/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
2
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 10/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 11/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A A
B B
2
C C
D D
E E
F F
G G
H H
I I
CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
ENTR.
0 03.12.2018 VERSION VALIDA PARA CONSTRUCCION APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO A
A 30.10.2018 VERSION INICIAL PARA REVISION DE KC APM SAM SCR ISLA DE COGENERACION
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 30.01.2019
K C ME E E R 0 2 6 1 REV. FECHA MODIF ICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-026 12/12
1 2 3 4 5 6 7 8 9 10 11 12 13 14