TASK #3
SIA-309 Perancangan Struktur Bawah

Sheet Pile Walls


(duration of task : 3 weeks)

Problem No 1
a) What are the used of sheet pile walls?
b) Several types of sheet pile are commonly used in construction. What are they? Please,
explain your answer!

Problem No 2 Cantilever Sheet Pile Walls (Penetrating on Sand)

In Figure 1, let L1 = 2,75, 3.00, 3.25 m,


L2 = 7.75, 8.00, 8.25 m,
 = 16, 16.5 kN/m3, sat = 18, 18.5 kN/m3,
w = 9.81 kN/m3 and ’= 30o, 32o

Questions:
a) Find the theoretical depth of penetration, D.
b) Increase of D by 30%. What length of sheet piles
is needed?
c) Determine the theoretical maximum moment in
the sheet pile.

Figure 1

Figure 1 Cantilever Sheet Piles Walls


(Penetrating on Sand)

Problem No 3 Cantilever Sheet Pile Walls (Penetrating on Clay)

In Figure 2, let L1 = 2,75, 3.00, 3.25 m,


L2 = 4.75, 5.00, 5.25 m,
 = 16, 16.5 kN/m3, sat = 18, 18.5 kN/m3,
w = 9.81 kN/m3, c = 30, 35 kN/m2 and ’= 30o, 32 o

Questions:
a) Find the theoretical depth of penetration, D.
b) Increase of D by 40%. What length of sheet
piles is needed?
c) Determine the theoretical maximum moment in
the sheet pile.

Figure 1

Figure 2 Cantilever Sheet Piles Walls


Task #3 Geotechnical Structure Engineering Page 1 of 2
(Penetrating on Clay)
Problem No 4 Anchored Sheet Piles Walls (Penetrating on Sand)

An anchored sheet pile bulkhead is shown in


Figure 3.
Let L1 = 3.75, 4.00, 4,25 m,
L2 = 7.75, 8.0, 8.25 m, l1 = 1.5m,
 = 17, 17.5 kN/m3, sat = 18.5, 19 kN/m3,
w = 9.81 kN/m3 and ’= 35o (assume that
soils are loose sand).

Questions:
a) Calculate the theoretical value of the
depth of embedment, D.
b) Draw the pressure distribution diagram.
c) Determine the anchor force per unit
length of the wall.
d) Determine the theoretical maximum
moment.
e) Using Rowe’s moment reduction
technique, choose a sheet pile section.

Figure 3 Anchored Sheet Piles Walls


(Penetrating Sand)

Assume that Dactual = 1.3 Dtheory, Use the free earth support method and take E = 172.500 MN/m2
and all = 210.000 kN/m2.

Problem No 5 Anchored Sheet Piles Walls (Penetrating on Clay)

An anchored sheet pile bulkhead is shown in


Figure 4.
Let L1 = 2.75, 3.00, 3,25 m,
L2 = 7.75, 8.0, 8.25 m, l1 = 1.5m,
 = 17, 17.5 kN/m3, sat = 19, 19.5 kN/m3,
w = 9.81 kN/m3, ’= 35o and c = 35, 40 kN/m2

Questions:
a) Calculate the theoretical value of the depth
of embedment, D.
b) Draw the pressure distribution diagram.
c) Determine the anchor force per unit length of
the wall.
d) Determine the theoretical maximum
moment.
e) Using Rowe’s moment reduction technique,
choose a sheet pile section.
Figure 4 Anchored Sheet Piles Walls
(Penetrating on Clay)

Assume that Dactual = 1.3 Dtheory, Use the free earth support method and take E = 172.500 MN/m2
and all = 210.000 kN/m2.

Task #3 Geotechnical Structure Engineering Page 2 of 2


LAMPIRAN (Tambahan Gambar)

Gambar 1.10 Tabel Standar Spesifikasi Sheet Pile

Gambar 1.11 (tambahan) Gambar Lapangan Sheet Pile