You are on page 1of 31

1.

 The TWO best contexts for using Container-Docker deployment in your


OCI deployment are -
(Choose all correct answers)
(0/1) Points
For responsive deployment and scaling
Packaged as containers with limited Choice of languages/frameworks
For proactive deployment and factoring
For fast and consistent delivery of an application
When Running less workloads on the same hardware
 Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

2. Which of the following Cloud service is included free of charge with any
Application Development Cloud service?
(0/1) Points
Oracle API Management Cloud Service
Oracle Developer Cloud Service
Oracle APEX
Oracle Visual Builder Cloud service
 Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

3. Your Customer bought Universal Credits to build a custom application but


would like to know if they need to budget for Oracle Developer Cloud
Services separately. Which of the following is CORRECT?
(1/1) Points
No separate budget is necessary - ODCS comes free of charge for all Oracle
Cloud Customers
Yes - ODCS requires a separate budget to be allocated based on usage
metrics
 Correct!

4. Which of the following is not a correct Use-Case for application


development using Oracle PaaS services?
(1/1) Points
Develop real-time file processing application using serverless functions
Develop a low code application using Oracle WebLogic
Lift and Shift WebLogic application using Container Engine for Kubernetes
Re-factor an existing Application using Microservices architecture
 Correct!

5. Which one of the following is NOT a characteristic of Oracle Functions?


(1/1) Points
Reduces all notion of Infrastructure
There are no servers in serverless
Built on open-source Function Project and Docker
Platform auto-scales functions. No servers to provision or manage
Pay for execution, not for idle time
 Correct!
6. Which of the following best explains Kubernetes?
(1/1) Points
It is a standardized unit of software used to develop, ship and deploy
applications
It is a drag and drop visual development tool with live WYSIWYG (What You
See Is What You Get) designer using Declarative Development approach
It is a rapidly growing movement where there is less concern with underlying
infrastructure and more focus on writing code.
It is the de-facto technology to create, manage and run containers
It is a Container orchestration tool, which automates the scaling of
workloads in the Containers
 Correct!

7. A methodology for developing, building and deploying web applications,


specifically SaaS apps is known as:
(1/1) Points
Agile Methodology
Cloud Delivery Methodology
DevOps Methodology
Oracle Unifed Methodology
12- Factor Methodology
 Correct!
8. You are scoping for a Digital Assistant Project for a Customer that is LIVE
with Oracle ERP Cloud. What would be the first step in identifying the scope
for the Digital Assistant Bot?
(0/1) Points
Identify the Use Cases
Identify the relevant Training data set
Identify the process to be automated
identify the input and output of the chatbot
Identify the Enterprise Skills
 Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

9. Select the THREE build possibilities that use Oracle Serverless


programming model (Functions)
(Choose all correct answers)
(1/1) Points
Digital Assistant
Blockchain
Real-time processing of Files, Streams
Web and Mobile Backends
API implementations
 Correct!

10. Which one of the following activities can a Project Manager DO with


ODCS (Oracle Developer Cloud Service)?
(1/1) Points
All of the above
User management and adding Team members
Storage of applications dependencies and libraries
Continuous Integration and Continuous Deployment (CI/CD)
Set up and create Wiki Components for documentation and collaboration
 Correct!
11. “This is how we do things here”- Is a typical statement from an On-
Premise E-Business Finance Super User highly focused on his requirements.
What positioning/ action would be most appropriate in SaaS Cloud Projects
context?
(0/1) Points
It is crucial for the success of the Project, that every user’s wants are
fulfilled. Develop customisations to meet Business requirements and
replicate existing processes.
To avoid this situation, undertake a detailed requirement gathering session
is an important Project activity.
By strictly following the traditional waterfall methodology and Good PM
Practices; obtain requirements sign off as a key milestone. This will set the
Cloud Project to success.
Review the requirements in detail, take Executive sponsorship to baseline
requirements as per existing practices.
Initial resistance is natural. It is important to do the benefit selling in any
Cloud Project. Showing the bigger picture and end results will help.
 Incorrect. Please review Organizational Change Management in Cloud Projects to find the
correct answer.

12. Your Delivery scope for Cloud Transformation Project includes


SaaS/PaaS/OCI components. Change Management is led by the Customer.
Which of the following Change Management activities are ESSENTIAL in the
Customer’s Change planning from the CLOUD Project perspective?
(1/1) Points
Identify Customer Change agents and Cloud champion(s) from Business and
IT to drive the technology and process Change
Identify key stakeholders and their roles and responsibilities in the Project

Prepare a Change Management and Communication plan


Align corporate vision, mission, objectives and KPIs of the organization with
employee goals
Depict the reasons for resisting Change and prepare mitigation activities
 Correct!

13. Which of the following activities should be part of a Change Management


Plan for Oracle SaaS CX Project with OIC integration to E-Business Suite?
(1/1) Points
Set up of Cloud communication notifications to target audience to embed the
new Cloud culture in the Customer organization
All of be above
For the SaaS applications, leverage the Oracle Modern Best Practices to
facilitate adoption and process change. For integrations, leverage integration
recipes
Train the Customer IT team on Cloud Environments Management, Cloud
console and portal usage
Conduct organizational impact assessment for shifting from On-Premise to
Cloud for the Business and IT operations departments
 Correct!

14. A Solution Driven approach typically compromises all of the following


except:
(1/1) Points
Predefined Distinct roles with Job roles, duties, roles and responsibility
matrix
Business process models (or Business flows) based on the Oracle Modern
Best Practices depicting the included functionality
Pre-determined setup values that enable a working application instance to
be established quickly for familiarization/mapping purposes
Requirement definition document to set up the application in minimum time

Pre-defined demo/test scripts based on the pre-defined setup values, which


may be used to demonstrate the functionality included.
 Correct!

15. Your Customer Project scope includes Fusion Engagement Cloud, Service


Cloud (RightNow), Field Service (TOA), Commerce (ATG), CPQ, Marketing
Eloqua and Responsys, integrated through OIC (Oracle Integration Cloud)
recipes. What implementation approaches apply for this scope?
(1/1) Points
Agile - Iterative and incremental approach
There is no one-size fit all. It is mostly Solution Driven; Except for OIC,
some parts of Service Cloud extensions and Marketing where configuration is
shaped by changing Business Strategy.
OIC - Requirement Driven; Marketing - Strategy Driven; Other CX Products -
Solution Driven
Requirement Driven Approach is appropriate for this scope
Solution Driven approach fits the entire scope as there are OIC recipes which
are plug and play
 Correct!
16. What is the exact order of the DevOps Cycle?
(0/1) Points
Plan - Code - Build - Test - Release -Deploy - Operate
Design - Code - Build - Test - Release - Operate - Monitor
Plan - Build - Test - Package - Release- Operate - Monitor
Plan - Build - code - Test - Package - Release- Operate - Monitor
Design - Build - Test - Deploy
 Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

17. Which one of the following is NOT considered as a benefit of DevOps?


(1/1) Points
Increased Release Velocity
Process metrics
Shorter Development Cycle
Reduced Defects
Environment Management
 Correct!

18. Build, Measure and Learn Faster is an agile approach that works for:
(1/1) Points
Consumable Product
MVP - Minimum Viable Product
MVF - minimum Viable feature
Working Software
MMP - Minimum Marketable Product
 Correct!

19. According to the Agile Manifesto, agile does not value which ONE of the
following principles?
(1/1) Points
Following a plan over responding to change
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
 Correct!

20. Compared to a traditional Waterfall Project, an agile Project is:


(0/1) Points
More predictable
Sometimes more predictable, but sometimes less predictable
As predictable as waterfall
Less predictable
 Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.
21. A Cloud Project Delivery Approach depends on several factors. Which
one of the following is NOT considered as a major factor?
(1/1) Points
Different geographies Data Centre locations and time zones mandating
specific approach of planning and control.
Different Technology Stack of SaaS Cloud Environments such as: PBCS,
Service Cloud, Field Service, Eloqua, Fusion, etc…
Customer pain areas, priorities, Business drivers and Project objectives
Customer approval hierarchy and Bureaucracy (Number of Organizations,
Departments, functions etc.)
Seasonality factors and other characteristics of certain industries (year –end
shipping, recruitment cycles etc.
 Correct!

22. You are preparing the Project governance structure for a multi-pillar


complex Project. Who should you include in the governance structure? Select
the THREE appropriate answers
(Choose all correct answers)
(0/1) Points
Oracle Stakeholders since there is a dependency for the services provided

Business Sponsors as they are funding the Project


Project Team Members
Health and Safety Contingent Workers
IT Management to support the Project
 Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.
23. You are Project Manager for a Greenfield (i.e. no legacy processes or
systems) SaaS Fusion ERP, HCM Project in a single country along with PaaS,
OCI Universal Credits available for third party integration and analytics.
What would be the key consideration to plan for this Project?
(0/1) Points
The Customer’s current IT infrastructure status (requiring modernization to
Cloud native tools, move and improve etc…
All of the above
Customer priorities, Business drivers and Project objectives
Dependency of modules and different non-Oracle Cloud technologies
Different geographies and time zones mandating specific approach of
planning and control.
 Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.

24. You are scoping for a SaaS Cloud Project. The Customer has subscribed
for Oracle Enterprise Resource Planning Cloud for 30 users. What would be
the FIRST most critical SCOPING ACTIVITY to look into:
(1/1) Points
The exact list of modules in scope as part of the Oracle Enterprise Resource
Planning Cloud bundle
The quantified features and functionalities to put boundaries in scope
Chart of Account Structure and the Set of Books for Financials
All of the above
The processes in scope for implementation.
 Correct!

25. You have prepared a Project Management Plan (PMP) for Oracle Cloud
Project that is transitioning an On-Premise System to Cloud with SaaS, PaaS
and OCI components. What is (are) the important topic (s) you would
highlight to the Customer while reviewing the PMP?
(1/1) Points
Emphasis on depicting Project objectives and KPIs to align with Business
goals and measure success
As there is a high dependency on Oracle, it is important to involve Oracle in
the Project Governance Structure
Organizational Change Management is a key differentiator in Cloud Project
hence it's important to plan for it accordingly
Cloud Environments Management is a new topic that needs be included in
Infrastructure Management
All of the above
 Correct!
26. A highly regulated Industry Customer requires to self-manage symmetric
storage encryption keys at scale. Considering the sensitivity of the data,
what Service is best positioned for this Project?
(1/1) Points
Vaults/Secrets Management
Cloud Access Security Broker
Vaults/Key Management
None. All Customer Data with any of Oracle Cloud Infrastructure Data
Services is encrypted by default and Customers cannot manage their own
keys
 Correct!

27. Customer wants to isolate different departments from each other, so


that the visibility and access to resources can be compartmentalized. What
would be the security solution for this use case?
(1/1) Points
Identity and Access Management: Compartments and IAM policies
Back-end Infrastructure: Secure isolation between Customer instances and
back-end hosts (Off box Network Virtualization)
Network: VCN and Subnets
Data: Data-at-rest encryption using Customer-controlled keys
Compute: Bare Metal Instances or VM Instances
 Correct!

28. You are engaged in a Project where the Customer has SSO (Single Sign
On) requirement between their Fusion Application and other third-party
vendors. How would you address this requirement?
(1/1) Points
Customer need to buy the SSO module, in order to integrate with Fusion
SSO.
Customer SSO can’t be integrated with Fusion applications SSO.
You should raise an SR after Go-Live
SSO should be activated during the UAT phase by logging an SR if it is part
of the pre-approved SSO list. Should it be out of 27 preapproved SSO list,
Project Managers should scope an integration effort to build the solution.
SSO should be planned and activated at the solution design phase. Customer
SSO should be part of the preapproved list – activation may be requested
via a Service Request (SR).
 Correct!

29. During your implementation, to manage the password policy what you


should do? Select the TWO appropriate answers:
(Choose all correct answers)
(0/1) Points
You should work with Customer to follow their password policy and ignore
the Fusion application password policy.
Fusion password policy is flexible enough to adopt to Customer security
needs.
You need to raise an SR, to activate the password policy
You can raise an SR to change the password policy to match Customer
security
You cannot change Passwords
 Incorrect. Please review Cloud Security

30. A partner is deploying an application on OCI. They would like to have


visibility to detect insecure OCI resources settings. Which Product caters for
such a requirement?
(0/1) Points
CASB
OCI Audit Service
Cloud users cannot have visibility into OCI resource misconfigurations
REST API
 Incorrect. Please review Cloud Security
31. A partner has moved an e-commerce application to Oracle Cloud
Infrastructure. The Project requires strict access control that restricts access
to data from certain geographical regions. What additional Cloud Security
Services will be required to achieve this level of access control?
(1/1) Points
Cloud Access Security Broker
Identity Cloud Service
OCI IAM
Web Application Firewall
 Correct!

32. Oracle Cloud Infrastructure’s security approach is based on seven core


pillars. Each pillar has multiple solutions designed to maximize the security
and compliance of the platform. Which of the following is NOT Considered
one of the pillars?
(0/1) Points
Disaster Recovery
Data Encryption
High Availability
Visibility
Customer Isolation
 Incorrect. Please review Cloud Security

33. What are the key use cases for ATP (Autonomous Transaction
processing) in a Project?
(1/1) Points
Modernize Oracle Forms
All of the above
Replace Spreadsheets
Extend Enterprise apps
Rapid app development for LOB
 Correct!

34. Your Telco Industry Customer requires their core CRM system available
24/7 and cannot afford any downtime as part of Transition to the new CX
Cloud Application. To cater for this requirement, which of the following
strategies allows you to move Data and maintain future Data changes using
Real-Time Processes?
(0/1) Points
Trickle Data Migration Strategy
Phased Data Migration Strategy
Big Bang Data Migration Strategy
Transformative Data Migration Strategy
This Approach is Not Possible
 Incorrect. Please review Data Management and Migration Plan to find the correct answer.

35. Customer would like to delete certain data from their environments.


What guidance would you provide for the feasibility of the requirement?
(1/1) Points
Run the delete Scripts and delete the data for the Customer
This is a paid service performed by Oracle – so request must be made
through My Oracle Support
Engage the Oracle Cloud technologist team with Customer to run a detailed
workshop for the requirements
Guide the partner through the Cloud hosting and delivery policy
documentation for the Customer’s Services on oracle.com to understand the
feasibility
Customer can never delete/block any data stored in Cloud environments.
 Correct!
36. The tool(s) that may be used to migrate data into Oracle SaaS Cloud
is/are -
(1/1) Points
WebServices (REST and Public APIs)
All of the above
File based (e.g. FBDI)
ADF Desktop Integrator
ODI Cloud Services
 Correct!

37. Your Customer requires the application software to remain up and


running during the Data Migration process. What tool is best suited to
perform the Data Migration?
(0/1) Points
Remote cloning with ADG
MV2ADB
Data Import, Export with Oracle Data Pump or PDB Import/Export
Oracle SQL Developer
Maximum availability Architecture
 Incorrect. Please review Data Management and Migration Plan to find the correct answer.

38. Which of the following is NOT considered as a key principle and goal for
a Move and Improve Project?
(0/1) Points
The target hosting Environment is mostly SaaS and PaaS
All the above
The target hosting environment is mostly SaaS and IaaS
The target hosting Environment is mostly IaaS and PaaS
 Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

39. Your Customer’s back office Finance and HRMS is run on E-Business


Suite at their Data Centre. The application is heavily customised to meet
legislative requirements and the hosting servers will be going out of support
in the near future. They are keen to move to Cloud but require an interim
and long-term strategy to achieve their Cloud First vision, safe-guarding the
legislative interests. What approach is suggested in this case?
(1/1) Points
Split the journey in 2 sequential phases (a) Move and Improve EBS to OCI,
(b) Migrate EBS-ERP to Oracle ERP Cloud and EBS-HRMS to Oracle HCM
Cloud
A big bang migration of Finance & HRMS to Oracle Cloud, discard all
customisations
Split the journey in 2 parallel phases (a) Move and Improve EBS-FINANCE to
OCI, (b) Move and Improve EBS-HRMS to OCI
Split the journey in 2 sequential phases (a) Move EBS to OCI, (b) Improve
EBS by converting the database tier to Autonomous
 Correct!

40. As a Project Manager, you are defining the scope of a Move and Improve
to OCI Project along with your architects. What are the dimensions that
drive the scope definition for such a Project?
(0/1) Points
Current CPUs, Target Cloud, Networking
Workload nature, Deployment environments, Target Architecture
All the above
Technologies, Databases, Packaged Apps
 Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
41. A Customer calls for an open tender for ‘Lift and Shift’ of their PeopleSoft
applications running on Oracle Databases. You’d like to submit a competitive
bid with accelerated implementation timelines. What might your proposal
leverage?
(0/1) Points
All the above
Make a proposal to host the Database tier on Autonomous and the
application tier on OCI
Leverage Oracle Cloud Manager to accelerate the Move of PeopleSoft to OCI

Leverage terraform scripts to decrease the time allocated for provisioning


Cloud resources
 Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

42. Select the TWO knowledge components that are relevant to an IMPROVE


extension of a MOVE Project
(Choose all correct answers)
(0/1) Points
Location and Connectivity
Multi-Cloud and OCI
All of the above
Oracle Management Cloud
Oracle Autonomous fundamentals
 Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

43. A Customer is moving their On-Premise PeopleSoft to PeopleSoft on OCI.


This is a Move and Improve Project
(1/1) Points
TRUE
FALSE
 Correct!

44. A retailer’s eCommerce On-Premise application is experiencing heavy


performance issues during peak demand periods of the year (Promotions,
Sales etc). IT maintenance costs and Business Continuity have therefore
become major pain points for this Customer. What is the key Value
Proposition to justify a ‘Move and Improve’ Project to address this
Customer’s pain points?
(0/1) Points
In OCI there is a guaranteed level of minimum service availability. You can
extend your architecture to easily scale-out and build your D/R without any
upfront investments and without any downtime
Oracle Autonomous Database is a self-healing, self-optimized database to
enhance your eCommerce system
Oracle Management Cloud is a component that can help you do preventive
actions in order to protect from eCommerce downtime
Oracle Cloud operates in multiple regions across the world
 Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

45. What are the TWO initial things to consider when you decide to migrate
a legacy application to Cloud
(Choose all correct answers)
(1/1) Points
Assess the Business need
Provision the Cloud resources and install the application package
Perform analysis to verify the Cloud compatibility and estimate migration
effort
Discard the old legacy application and adopt a new and modern Cloud based
application offering the same functionalities
 Correct!
46. You are engaged in a CX project with Sales Cloud, Service Cloud, CPQ,
Field Service (TOA) in Scope and want to use the Modern Business Processes
(MBP) as a basis of your information gathering workshops and map activity
level Business Processes. What challenges might you encounter in leveraging
the assets?
(0/1) Points
Information gathering can happen regardless of the available MBPs provided
the requirements are not in conflict with the company’s overall mission and
objectives
None of the above
MBPs are only applicable for Fusion products. They include the base
functionality complemented by analytics ONLY.
The MBP diagrams are only at Level 2 and some features are spread across
different applications
Some of the CX Cloud Services don’t have Level 3 Process diagrams
published yet – so not all areas have assets that may be re-used.
 Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.

47. A University SaaS Cloud Transformation Project has Oracle ERP,


Procurement, HCM (including Payroll) and Student Cloud in scope. The
Customer IT Team have detailed Business Process diagrams from existing
On-Premise systems but are open any improvements and count on you for
Project Approach advise. What SaaS Application Implementation approach
would you suggest?
(1/1) Points
As the Customer is open to improvements and new methods, follow a Show
& Tell approach for the entire Project based on the modern best practices
and the Level 3 diagrams as applicable.
Show and Tell approach won`t work for any of the processes in scope
Leverage their existing Process Maps, follow an “ASK & DO” approach to
identify Gaps and use PaaS to extend applications.
Leverage their existing Process Maps, map them to the SaaS Standard
Application flows for solution design and identify gaps. Engage C-Level
stakeholders for Change Management
 Correct!

48. Your Customer refers to an RFP (Request for Proposal) appendix matrix


listed with system requirements for SaaS Finance, HCM and Procurement in
5 countries. Planning and preparing for CRP (Conference Room Pilot)
sessions, what is the Best Practice approach to mitigate any Solution Gaps
you may encounter?
(0/1) Points
Review the Customer objectives and pain areas. Walk through the Modern
Best Practice (MBP) diagrams during the CRPs to identify solution Gaps.
Conduct detailed Requirements gathering workshops and create a
traceability matrix following the CRPs. Design a global solution based on the
traceability Matrix to address Customer requirements.
Leverage a Set Up questionnaire mapped to MBP to capture necessary
information to Configure the system activities and identify Gaps.
Engage appropriate key users and stakeholders at the early phases of the
Project to reinforce a No customization approach for SaaS Solutions.
 Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.

49. For a 3 years' Cloud subscription service, which of the following prove a


successful Cloud Implementation from the Customer's perspective?
(0/1) Points
All of the above
Project finished on Time - on Budget
The Customer has realized the benefits & value of their Cloud investment
Customer celebrated the Go-Live event and is planning to renew in a few
years’ time.
Customer success story with a reference
 Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.

50. What is/are the most important Cloud knowledge area(s) for a Project
Manager to be familiar with, for Cloud Projects Delivery readiness?
(1/1) Points
Cloud Environments Management
High level understanding of how the Cloud Services in SaaS/PaaS/OCI work

All of the above


The Cloud mindset and Cloud products like Integration, PaaS, Fusion
Applications at a high level
Cloud Security Management
 Correct!
51. You are documenting the lessons learned following delivery of a Cloud
Project. What high level Project Management ''habits'' would you document
as Best Practices for future Projects?
(1/1) Points
Integrate the Environment and Instance Management activities with the
Project Plan
Ensure the Project objectives and the Business goals/KPIs are aligned
throughout the Project
All of the above
Project Delivery in shorter sprints bring quick win benefits to better realise
Cloud investment for Customers – a point to consider for future Project
proposals
Ensure that there is a proper Change Management Plan driven by the
Customer
 Correct!

52. You can optimise Implementation timelines for ERP, SCM and WMS
Cloud Integrations by leveraging -
(0/1) Points
ERP Connectivity Packages
Prebuilt Adapters
Integration Recipes
REST and SOAP APIs to build adapters
Integration Extensions
 Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

53. You are engaged in a Project to identify all possible Integration Use


Cases for scoping purposes. Which of the following Use Cases may be
eliminated for Integration Scope?
(1/1) Points
File Transfers
Stream Processing using Streaming Analytics
None of the options listed may be eliminated– All of them are potential
Scope areas.
Business Decisions (Business Rules)
Process Automation and Case Management
 Correct!

54. A Customer’s footprint includes E-Business Suite Applications integrated


with Siebel and Salesforce Cloud through SOA suite. They wish to ‘Move and
Improve’ E-Business Suite, to OCI but keep Seibel on-premise. How do you
handle the integrations in such scenario?
(0/1) Points
Use SOA Cloud Service and retire On-Premise SOA Service
Keep SOA On-Premise and provision OIC
Continue using SOA On-Premise. This will serve the purpose.
Keep SOA On-Premise and provision SOA Cloud Service in order for the
integrations to work
Use Oracle Integration Cloud for compatibility
 Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

55. Your Project scope includes On-Premise Database migration to the Cloud


using Data Integration Platform Cloud Services (DIPC). What are the TWO
pre-requisite Services to be activated to use DIPC and therefore to be
considered as part of the Universal Credits Project costs?
(Choose all correct answers)
(1/1) Points
Oracle Integration Cloud
Database Cloud Service
Storage Cloud
Cloud Computing
Analytics Cloud
 Correct!
56. What is the major initial Differentiator for the API - First Lifecycle from
Traditional Approach?
(0/1) Points
It uses the approach of Documenting and publishing APIs for reuse
Prototyping quickly to collaborate and align faster
Creating APIs and checking against the contracts
It is a Flexible gateway deployment and has built-in security
Conducting many Iterations of design, build, test, Redesign
 Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

57. For a Cloud Project to be successful in the longer run, the Sustainment


Plan and Adoption Strategy should include the following:
(1/1) Points
A detailed Customer Support plan with detailed SLAs to address issues
through tracking tools and ensure Customer satisfaction
Ensure that KPIs set at the beginning of the Project are met at the end of
the Project and the Customer realized the benefit for their investments
Focus on Business value realization and value assessment with periodical
Business review workshops
Proactive and reactive Customer engagement to address issues, help
Customer realize value and progressively update solution to adopt new
features and Best Practices
Oracle provides the needful Customer support for the Cloud services
subscribed through MOS - My Oracle Support and Cloud Portal; A reference
to this should be enough.
 Correct!

58. What are the main influencing factors in defining and planning ongoing
Support and Sustainment for Cloud Projects?
(1/1) Points
Cloud Services Entitlements, Environments Management and working with
My Oracle Support (MOS)
All of the above
Release upgrade cycles of the different Cloud applications (like Fusion, CPQ,
EPM, Field Service etc)
The Business Operations Key Events/Processes and dates
Number of Cloud distinct Environments (PROD /TEST) and the Data Centre
locations
 Correct!

59. The Customer Project Manager calls for a meeting to discuss skills and
knowledge capabilities required to manage, maintain and evolve the Cloud
environments of SaaS/PaaS/OCI on an ongoing basis. Which of the following
should be considered for forming BAU (Business as Usual) Operations team
for the Customer?
(1/1) Points
Lifecycle, Configuration and Release Management; Continuous Validation and
Testing
User Adoption and Change Management; Solution Management;
Cloud Infrastructure Architecture; Cloud Administration
All of the above
Issue Management (MOS/Hlepdesk), Environments Management and
Monitoring
 Correct!
60. Which of the following Post Go-Live handover activities form part of your
‘Train the Trainer’ and ‘Transition’ activities for Customer IT team in a Cloud
Project?
(1/1) Points
Functional flows overview and configuration walkthroughs
Cloud Operations and Security review; hands on set up documentation for
the OCI/PaaS/SaaS applications
All of the above
Technical overview on the application customizations, integrations and
analytical reporting tools along with respective documentation
Orientation to data Conversion tools and processes
 Correct!
61. Your Project scope includes Cloud ERP, HCM, Payroll, Talent Management
with OIC integrations to On-Premise Time recording System. Oracles
Analytics Cloud is used for reporting. The Customer PM would like to identify
Customer Business SMEs that will require training. Who do you classify as
Business trainees?
(0/1) Points
Train everyone in the organization on Cloud
Train all the Key Users, IT Applications development team, Infrastructure
team and Help desk teams
Train the Infrastructure team on migrating E-Business to Cloud and on how
to monitor integrations
Identify the impacted departments ONLY and train the key SMEs. Manage
the overall Change with needful communication
Train all HR Key Users for system use. Train IT team to develop the
applications, integrations, and build reporting dashboards.
 Incorrect. Please review Training and Knowledge Transfer Strategy and Plan to find the correct
answer.

62. You are assigned to a Customer Project in EMEA region who has


subscribed to SaaS Applications of Fusion ERP, SCM, Sales and HCM.
Customer has not activated the services yet. What considerations should be
made before activation of the Services?
(1/1) Points
Language Packs
Timezones
Data Centre location in view of Data Residency requirements
All of the above
Geographic locations
 Correct!

63. A Customer has completed the UAT of a Cloud Fusion ERP and HCM
Project and is close to Go-Live. The Customer insists to have a Gold Instance
- i.e. have a back-up of the Production Instance to restore from in case
PROD Data Migration went wrong. Is this possible?
(0/1) Points
Ask the Customer to buy an extra environment which will serve as Gold
instance, to carry out this activity
There are alternative solutions in PaaS/OCI to be explored
No need for Gold Instance, conduct a P2T after production configuration and
the Test Instance may be used to restore to PROD if necessary
This is an on-premise strategy and may be used for Cloud implementations.

Back-Up and Restore is unavailable for Fusion SaaS Projects as in On-


Premise Projects. All activities must be thoroughly tested prior to Production
Migration as instance restore is not a service entitlement.
 Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

64. What is the Welcome E-mail that Oracle sends to its Cloud Customers?
(1/1) Points
It’s a declaration sent to Customer administrator informing that Oracle has
initiated the provisioning of instances
It’s a declaration sent to Customer administrator informing that Oracle has
received the Order from the Sales Manager.
It’s a declaration sent to Customer administrator informing that Oracle has
completed provisioning and the instance is ready to be used.
It’s a declaration sent to Customer administrator informing that Oracle is
about to start the provisioning.
It has important list of action the Cloud admin should do.
 Correct!

65. Following Production Configuration of Fusion Cloud Applications, it is a


Best Practice to take a Back-Up copy of the application to a hard-disk or
local Storage.
(1/1) Points
True
False
 Correct!
66. A Customer implementing Fusion Cloud ERP, HCM, Engagement Cloud,
Field service, CPQ has concluded the UAT phases and is going Live in 4
weeks’ time. What is the key Environment Management activity to be
scheduled across the Products?
(1/1) Points
Sizing and concurrent patching
Mainly P2T as concurrent patching is not available for all Cloud services
P2T and Concurrent Patching
Concurrent patching
T2P
 Correct!

67. A Cloud Customer buys Universal Credits to implement Oracle Analytics


Cloud. Which of the following influence the Universal Credits’ usage levels
and therefore should be considered as part of Project costs?
(1/1) Points
All of the above
Number of Business Analytics instances that will be created and used
The type of the OAC subscription: Standard or Enterprise Edition
The number of instances and the Number of CPUs used.
No. of Dashboards and reports that will be created
 Correct!

68. The best approach to monitor OCI workloads costs for a Project is to


leverage:
(1/1) Points
Group each workload under one Policy
Avoid using compartments
None of the above
Build Subnets
Tagging feature
 Correct!
69. You have just concluded UAT for a Fusion Cloud Project and received a
Quarterly Update notification which has new functionality and some bug
fixes. What mitigation planning/action should be carried out?
(0/1) Points
Test the known issues and bug fixes and opt-in to enable all the new
features for the Customer
Update cycles are mandatory and predictable; hence all planning should
have been done. Execute Update activities as planned. (Regression tests
followed by implementing mandatory features)
Log an SR to skip the update
Conduct a pros and cons analysis whether to carry out the Update
Log an SR with Oracle and request postponing the Update to next month as
the System Sign-Off is complete and Configuration is baselined.
 Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

70. The accelerated activation experience in a Cloud Project context gives


the Customers the ability to be able to:
(0/1) Points
Access the environments when the account activation email is sent
Take control of Environment Provisioning by choosing the Data Centre
location, language packs etc. and kick-off the provisioning process.
Activate order and configure services through the Cloud administrator
Send the Welcome email with URL and credentials to the instance
Receive Cloud Account activation email
 Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
71. Data Model presents the sources in a Dimensional fact Model for
business analysis. Which one of the following is NOT considered as a
Relation Type to model the data in Oracle Analytics Cloud data modeler?
(0/1) Points
Star
Denormalized
Tabular
Snow Flaked
Normalized
 Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
72. Your Customer would like to conduct exploratory analysis using real data
through the DV content packs to generate analytics. Which tool may be
leveraged to meet this requirement?
(1/1) Points
Data Visualization
Data Ingest
Data Blending
Data Enrichment
Data Augmentation
 Correct!

73. The Analytics Category that enables Businesses to optimise their end-to-


end processes by providing an enterprise wide view of Data, including a
trend over a period of time is known as -
(0/1) Points
Operational Analytics
Augmented Analytics
Strategic Analytics
Visual Analytics
Transactional Analytics
 Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.

74. Your Customer Use-Cases context for Analytics Scope includes –


Publishing Pixel-Perfect Reports along with Modelling Data and Scenario
based analysis. Which Edition of Oracle Analytics Cloud caters these Use
Cases?
(1/1) Points
Professional Edition
Special Edition
Enterprise Edition
Essbase Edition
Standard Edition
 Correct!
75. Which of the following reporting tools may be used to leverage the pre-
built ETL to extract data from operational tables and load it into a
Datawarehouse
(1/1) Points
Oracle Transactional Business Intelligence
Oracle Business Intelligence Enterprise Edition
Oracle Analytics Cloud
Oracle Business Intelligence Application
Oracle Business Intelligence Publisher
 Correct!
76. Cloud Products receive continuous updates around the year, with slightly
variant time tables across the Product sets. In multi-Cloud Projects, Project
Managers can minimise risk to TIMELINES and COSTS by
(0/1) Points
Considering relocation of the Data Center for latency
Factoring the number of patching cycles over the duration of the Project
Logging an SR and postponing all the updates for after Go-Live.
Scheduling Concurrent Patching for all the Environments across Product Sets

Skip the Environment refresh activities in the Project


 Incorrect. Please review Cloud Risk Management to find the correct answer.

77. Your Customer has raised a concern and Risk regarding Constraints on


Security testing for SaaS Products. Which of the following would provide
further information on standard security testing coverage as part of the
Service, that you may point to the Customer to address their concerns?
(1/1) Points
Oracle Advanced Customer Services Contracts
Cloud Services and Service Descriptions
Oracle Moat Services
Cloud Support Service agreements
Cloud Services Hosting and Delivery Policies
 Correct!

78. As you approach Go-Live, you encounter an unexpected issue with the
application. You’ve raised an SR with Support as Sev 2, however you are not
getting the expected response – what is the next step as per the Support
Process?
(1/1) Points
Update the SR every 4 hours
Call the regional support Hub, request an escalation and a Manager call
back.
Postpone the Go-Live and inform the Customer to speak to Oracle Sales
account Manager.
Call Oracle Sales Account Manager and ask him to escalate the issue.
 Correct!

79. Your team opened an SR (Service Request), the Support Engineer added


Product Development to this SR by raising a Bug. This means the following:
(0/1) Points
A Bug with Oracle support means a code change is expected involving a full
QA and release process.
The Support engineer has identified a product malfunction and hence
engaged development to fix it.
The Support engineer engaged Product Development for further research
and investigation. It may end up with no code change
 Incorrect. Please review Cloud Risk Management to find the correct answer.

80. Which of the following is NOT considered as an operating model for


Enterprise Architecture Strategy analysis with the two-dimensional matrix of
Business process integration and Standardization?
(0/1) Points
Collaboration
Coordination
Unification
Replication
Diversification
 Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.
81. In a joint Enterprise Architecture analysis with your Project Architect,
you identify that the Customer has globally integrated Business Processes
with centralised management and IT Decision Making. The Customer is keen
to take up global design approach by Standardising Business Processes.
What is this Operating Model classified as?
(1/1) Points
Diversification
Standardization
Replication
Coordination
Unification
 Correct!

82. In a joint Enterprise Architecture review with your Project Architect, you
identify that the Customer Departments seldom share Customers or
Suppliers. Departmental transactions are unique to individual Business Units
with independent Business Processes and little Data Standards. What is this
Operating Model classified as?
(0/1) Points
Unification
Standardization
Replication
Diversification
Coordination
 Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

83. Which of the following statements is NOT considered as a key


differentiator for Enterprise Architecture in the Context of Cloud
(0/1) Points
Resource elasticity, application scalability, expandability
Auditability and Accountability
Agility, availability, adaptability, and autonomy
Usability, Sustainability, Sociability
Better visibility, traceability, flexibility
 Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

84. A Retail Distribution company has embarked an Oracle Cloud Journey.


The CIO expects to leverage role-based Security and other governance
standards to achieve improvements with: -Compliance and Security; Lesser
costs & effort; Reduced Data Breaches and Reduced Security breaches.
Which of the below Project KPIs would you define to align with the CIO’s
Business Goals?
(1/1) Points
(A) and (C) ONLY
(A), (B) and (C)
(C) Average cost per cybersecurity record and Number of data breaches
(B) % of sensitive records utilizing encryption, data masking, or security
policy
(A) Annual Audit and Compliance Costs
 Correct!

85. You are assigned as the PM of a new win Oracle Cloud Project. As part of
the Bid to Delivery transition, which of the following needs prioritising over
other activities to ensure alignment between Sales & Delivery?
(1/1) Points
Review the contract and scope of work internally first and then with the
Client so that there is a common understanding of the scope, timelines, cost
and terms and conditions
Understand Client’s objectives and Business strategies
Validate Cloud services subscribed, establish the Project infrastructure and
collaborative environment
Start compiling the Project Management Plan and agree Project approach
with the Customer
Don’t hesitate to re-engage the sales or management team to reset
expectations.
 Correct!
86. Setting Project objectives and KPIs is important in the context of Cloud
Implementations because:
(1/1) Points
Customers might measure ROI based on Project Objectives
Subscription based Cloud model relies on successful Projects with
measurable Objectives linking back to Business Goals
All of the above
If the Project delivers the desired outcome the Customer might not renew
the contract.
Shifting from CAPEX to OPEX budget might be impacted by Project failure
 Correct!
87. Cloud Services Entitlements impact the Testing Strategy & Plan. What
are the key points to take into consideration for Test activity planning?
(0/1) Points
All of the above
Lead times to Enable additional Cloud Services e.g. IP Whitelisting, VPN,
SSO, etc…
Lead times for Provisioning ATE (Additional Test Environments)
Lead times for Sizing evaluation & Concurrent patching requests
 Incorrect. Please review Continuous Testing Strategy and Plan to find the correct answer.

88. What is (are) the advantage(s) of considering and adopting a Risk Based


Testing approach after going Live for Cloud Projects?
(1/1) Points
Risk Based Testing approach optimises testing through prioritization
All of the Above
Risk Based Testing Approach expedites software regression and validation
testing without substantial increase in risk to the enterprise
Risk Based Testing is based on factors of Business and quality impact
Risk Based Testing suggests what to test when faced with schedule
constraints
 Correct!

89. The Customer security profiles may be configured in Production ONLY


but not during CRP or UAT.
(1/1) Points
True
False
 Correct!

90. To avoid any delays during the UAT, it’s advised that the partner team
runs the testing scenario in a lab in-front of the Customer. Customer may
practice using the application during Training or after Go live. Is this a Best
Practice?
(1/1) Points
True
False
 Correct!