Bahir Dar University

Bahir Dar Institute of Technology

Faculty: Computing

Department: Software Engineering

Course Title: Risk Management

Title on: Online Internship Placement

Prepared By:
Ewnetie Adane………………………………………….BDU 0904158UR
Asrat Tsega………………………………………………BDU 0903719 UR
Awoke Misganew………………………………………...BDU 0903736 UR

Submitted to: Habtamu .

Submission Date:30/05/2021
BAHIR DAR INSTITUTE OF TECHNOLOGY

1. Risks of our industry (Online Internship placement).

Types of risks that will face in our project


1). Lack of experience and training in laravel framework to develop the system.

2). Poor Quality Code


3). Loss of data and storage device
4). with our Lack of knowledge and experience to solve Local host server is not working in
laravel
5). Inappropriate version of Packages and Development tools

RISK ASSIGNMENT Page 2


BAHIR DAR INSTITUTE OF TECHNOLOGY

2.Risk Information sheet for each risk

ID RST01 Risk Information Sheet Identified:2/5/2021


Priority high Statement
Probability high Lack of experience and training to develop the online internship placement in
laravel frame work language; the project may not be completed on time and
may be inefficient
Time Frame near Origin: Group Class: Assigned to:
members Personnel experience mentor

Context
Laravel is a clean and well-structured web framework for PHP development .Laravel frame work is one
of the most important part of php frame used to develop web based projects. . We all have been studying
it from scratch means lack of experience and training how the MVC works but are complex; our project
may not be completed on time and may be inefficient.

Mitigation Strategy
1. Coding estimates and schedules to reflect the need for increased training how to MVC works of
laravel.
2. asking expertise programmers coding and quality of coding
3. Coordinate with mentors and get approval for changing schedule
4. Bring in outside training source for current programmers or viewing laravel series tutorials.
Contingency plan and trigger
Plan: we pay cost for programmer to develop our project will finish on time.
Trigger: if training is not onboard project is not completed on time.
Status Status date
Project finished on time 15/9/2021
Project has been delivered for testing on schedule. 4/8/2021

Approval : Closing date: 30/9/2021 Closing rationale


Group members Project delivered on time, Acceptance
test excellent. Risk is gone.

RISK ASSIGNMENT Page 3


BAHIR DAR INSTITUTE OF TECHNOLOGY

ID RST02 Risk Information Sheet Identified:10/6/2021


Priority high Statement
Probability moderate With our Poor quality of coding the code maybe difficult to read, It might have
been rushed and released without testing: full of bugs that could have been
prevented.

Time Frame far Origin : Group Class: Assigned to:


members Quality of code mentor

Context
 Poor quality code can mean a number of things. The code may be difficult to read, meaning it is
difficult for other developers to review or make changes. It might have been rushed and released without
testing, therefore full of bugs that could have been prevented.

Mitigation Strategy
1. Implementing User Acceptance Criteria to have stakeholders affirm the project is up to standard;
2. Code reviews;
3. Clear coding standards and guides;
4. Testing of all code;
Contingency plan and trigger
Plan: we will see free coding web sites for coding standardization.
We will pay for programmers to reduce poor quality code.

Trigger: if coding is difficult to read and maybe rushed full of bug may be prevented.

Status Status date


Code quality has been reviewed. 25/6/2021
Clear coding standards and guides has been required 15/6/2021
Code quality has been tested 3/7/2021

Approval : Closing date:10/7/2021 Closing rationale


Group members Code quality reviewed, code test
excellent. Risk is gone

RISK ASSIGNMENT Page 4


BAHIR DAR INSTITUTE OF TECHNOLOGY

ID RST03 Risk Information Sheet Identified:1/8/2021


Priority high Statement
Probability low It might be possible that the data stored might get lost due to damage of hard
disk.

Time Frame far Origin: Group Class: data storage and back up Assigned to:
members Data base
administrator

Context
Hard disk is space in computer which stores large amount of data .our project data is stored in hard
disk, if hard disk maybe falls or crushed; our project files may be lost.

Mitigation Strategy
1.project should be copy in USB flash
2. Data should store in cloud.

Contingency plan and trigger


Plan: work done should have at least two back up.

Trigger: if data is not backed up and our project lost.

Status Status date


Data are backed up 10/8/2021
Data are stored in cloud 5/6/2021

Approval : Closing date: 15/8/2021 Closing rationale


Group members Our project files backed up
completely.

RISK ASSIGNMENT Page 5


BAHIR DAR INSTITUTE OF TECHNOLOGY

ID RST04 Risk Information Sheet Identified:6/6/2021


Priority low Statement
Probability low With our Lack of knowledge and experience to solve Local host server is not
working in laravel; the browser may not process and display the page
Time Frame near Origin: Class: Assigned to:
Group members Personnel Group members
Knowledge And Experience
Context
Laravel comes with a command line interface called Artisan. We haven’t knowledge and experience
how can use Artisan to execute repetitive tasks; the browser may not process and display the page.

Mitigation Strategy
Search online how local host server working in laravel.
Ask expertise person in laravel.
Change port number 80 to other port number.

Contingency plan and trigger


Plan:
1. First restart xampp server and set port number.
2. Write php artisan serve on cmd command in laravel project folder.
3. Write localhost :8000 on web browser.
4. if number 2 is not working write php S localhost:8000 t public/

Trigger: if php artisan serve not working and the server does not run.

Status Status date


Localhost:8000 command displays the page on web browser completely 15/6/2021

Php S localhost :8000 t public/ command displays the page on web browser. 20/6/2021

Approval : Closing date: Closing rationale


Group members 21/6/2021 server is ran completely. Risk is done.

RISK ASSIGNMENT Page 6


BAHIR DAR INSTITUTE OF TECHNOLOGY

ID RST05 Risk Information Sheet Identified: 15/5/2021


Priority high Statement
Probability moderate With our use of inappropriate versions of packages and development tools in
laravel to develop project; installation of software may be create
incompatibility.
Time Frame far Origin: Class: Assigned to:
group members software packages and mentor
development tools
Context
The versions of packages and development tools are software which are used to develop the system in
laravel application based projects, there are different versions of packages in laravel frame .so we don’t
know appropriately versions of packages and development tools ; installation of software may be
create incompatibility.

Mitigation Strategy
Search compatible software and tools online
Ask expertise person for packages and development tools;
Watch/ see youtube tutorials.

Contingency plan and trigger


Plan:
Carefully select the specific versions of tools and components to use and ensure that every member will
adhere to the choice throughout the entire project.

Trigger: if appropriate versions of packages not installed and software incompatible.

Status Status date


Laravel packages and development tools installed. 25/5/2021

Approval : group members Closing date: 30/5/2021 Closing rationale


Appropriate versions of packages and
development tools used, risk done!

RISK ASSIGNMENT Page 7