You are on page 1of 8

Resistance spot welding

Aim : To join two similar metal plates using resistance spot welding

Material requirements: Mild steel plates and mild steel electrodes

Equipment required:

Tools required:
Resistance spot welding

Theory:

Resistance welding schedule:

Procedure:

Precautions:

Observations:

Result:
Resistance spot welding – Observations – Group 1

Power input = 6KVA

Time of weld = 1.8sec


Resistance spot welding – Observations – Group 2

Power input = 6.5KVA

Time of weld = 1.4sec


Resistance spot welding – Observations – Group 3

Power input = 6.7KVA

Time of weld = 1.8sec


Resistance spot welding – Observations – Group 4

Power input = 6.9KVA

Time of weld = 1.92sec


Resistance spot welding – Observations – Group 5

Power input = 7.2KVA

Time of weld = 1.68 Sec


Resistance spot welding – Observations – Group 6

Power input = 7.3KVA

Time of weld = 1.43 sec