Indian Standard
METHOD OF MEASUREMENT OF
WORKS IN RIVER VALLEY PROJECTS
(DAMS AND APPURTENANT STRUCTURES )
PART 9 LINING
Chorrmon Rcprcscntwg
SHIU s. P. C4Pl<lHAN Kedecon ( India ) Pvt I.td, New Delhi
Members
Snw MAQIIO~I, A~lnlleu Kashmir Irrigation & E’. C. Department, Srinagar
SIIICI K. D. Ancwr Engineers India Ltd, New Delhi
SIIRI G. K. NATRAJAN ( Alternate )
SUHI Mna,\v~s BIUAYI\RIA Ferro-Concrete Consultants Pvt Ltd. Indore
Snw ASHOK BI~A%uu.\ ( Aflernalr )
SHRI ‘l-. K. Brsw \s Irrigation Department, Government of West
Bengal, Calcutta
CHIEF ENOINEXR ( NSF ) irrigation Department, Government of Andhra
Pradesh, Hyderabad
CI~I~B ENOILNI~EIL( TGP ) ( Al~ernatc)
GllIlW ENOINllER ( ~ILO.TldWS ) Water & Power ( Irrigation ) Department,
Governruent of Kerala, Trivandrum
Dspor~ CHIIXX ENUINEXX
( II<RlonTro~ ) (Altamale)
SHRI M. B. I)!.;s~~nrrilcn Irrigation Department, Government of
Maharashtra, Bombay
D~~ec:~oll. ( CM ) Cent<.ral Water Commission, New Delhi
KUMARI E. DIVATI \ National Hydro-Electric Power Corporation Ltd,
New Delhi
SHRI S. M. NARANO (Alternote)
SHRI OM PKAR.+SH GUPTA Irrigation Department, Government of Uttar
Pradesh, Lucknow
SHRI D. G KA~KA~E Jaiprakash Associates Pvt Ltd, New Delhi
SIIRI R. K. JAIN ( Alternate )
( Conlinucd on page 2 )
Q Copyright 1987
BUREAU OF INDIAN STANDARDS
This publication is protected under the Indian Copyright Act ( XIV of 1957 ) and
reproduction in whole or in part by any means except with written permission of the
1publisher d-d be deemed to be an infringement of copvripht under the said Act. I
IS : 9401 ( Part 9 ) - 1987
Mmbcrs Repenting
PBOB S. KRXBHNAXOORTEY Indian Institute of Technology, New Delhi
SHRI D. J. KETKAR Cemindia Company Limited, Bombay
SHRI A. N. GHOSR ( Altcrnatc )
SRBI B. N. MATRUR Irrigation Department, Government of
Rajasthan, Jaipur
SHRI R. C. PATI~,L Irrigation Department, Government of Gujarat,
Gandhinagar
SERI V. S. PATIL Karnataka Power Corporation Ltd, Bangalore
SHRI K. V. RAMACEANDRA RAO Institution of Surveyors, Delhi
SHRI N. RAMACHAND~AIAH Irrigation Department, Government of
Karnataka, Bangalore
SHRI P. S. RAO Haryana Irrigation Department, Chandigarh
SERI D. M. SAVUR Hindustan Construction Co Ltd, Bombay
SHRI P. S. SURRAMANIAM Tarapore & Company, Madras
SHRI K. N. TANEJ~ National Projects Construction Corporation Ltd,
New Delhi
SHRI G. RAMAN, Director General, BIS ( Ex-c&o Member)
Director ( Civ Engg )
Secretav
SHRI K. M. MATHUR
Joint Director ( Civ Engg ), BIS
IS : 9401 ( Part 9 ) - 1987
hdian Standard
METHOD OF MEASUREMENT OF
WORKS IN RIVER VALLEY PROJECTS
( DAMS AND APPURTENANT STRUCTURES )
PART 9 LINING
0. FOREWORD
0.1 This Indian Standard ( Part 9 ) was adopted by the Indian
Standards Institution on 15 February 1987, after the draft finalized by
the Measurement of Works of River Valley Projects Sectional
Committee had been approved by the Civil Engineering Division
Council.
0.2 In measurement of quantities in construction of river valley projects,
a large diversity of methods exist at present according to local practices.
This lack of uniformity creates complication regarding measurements
and payments. This standard is intended to provide guidance regard-
ing a uniform basis for measurement of lining of canals and other
structures in river valley projects.
0.3 In reporting the results of measurement made in according with
this standard, if the final value, observed or calculated, is to be rounded
off, it shall be done in accordance with IS : 2-1960*.
1. SCOPE
1.1 This standard covers the method of measurement of lining of canals
and other structures in river valley projects works.
2. GENERAL RULES
2.1 Clubbing of Items - Items may be clubbed together provided
these are on the basis of the detailed description of items stated in this
standard.
3
IS : 9401 ( Part 9 ) - 1987
2.6 Bill of Quantities - The bills of quantities shall fully describe the
materials and workmanship, and accurately represent the work to be
executed.
3. METHOD OF MEASUREMENT
4
IS : 9401 ( Part 9 ) - 1987
3.3 Sleeper beams, fillets, lip and coping shall be measured in cubic
metres.
3.4 Iron work like fixing iron rungs in lined slopes shall be measured
separately.
3.5 If fillers, bitumen paper or any other fill are used, they shall be
fully described and measured in square metre stating thickness.
3.6 All types of valves and porous blocks shall be fully described and
measured in numbers.
5
INTERNATIONAL SYSTEM OF UNITS ( SINUITS )
Base Units
Supplementary Units
QUANTITY UNIT SYMBOL
Plane Angle radian rad
Solid angle steradian ar
Derived Units
QVANTITY UNIT SYMBOL DEFINITION
Force newton N 1N = 1 kg.m/s’
Energy joule J 1J = 1 N.m
Power watt W 1w - 1 JP
Flux weber Wb 1 Wb = 1 V.s
Flux density tesla T 1T = 1 Wb/m*
Frequency hertz Hz 1 Hz = 1 c/s (s-1)
Electric conductance siemens s 1S = 1 A/V
Electromotive force volt V 1V = 1 W/A
Pressure, stress Pascal Pa 1 Pa = 1 N/m’