You are on page 1of 4

PEMBANGUNAN FASILITAS

SAMBUNGAN LISTRIK PLN 20KV


RU V BALIKPAPAN
PT. PERTAMINA (PERSERO)
Document No. DRAWING REV. Pages:
TYPICAL STANDARD DETAIL POWER &
PLN20KV-EE-52-DWG-013 00I 1 of 4
LIGHTING INSTALLATION

PEMBANGUNAN FASILITAS SAMBUNGAN LISTRIK PLN 20KV


PROJECT :
RU V BALIKPAPAN PT. PERTAMINA (PERSERO)

OWNER : PT PERTAMINA (PERSERO) RU-V

LOCATION : BALIKPAPAN, EAST KALIMANTAN

Daniar R Agung Prijadi


19/11/2021

00I Issued for Construction 30-10-2021 SS/ALF JKS GWT


001 Issued for Approval 12-10-2021 SS/ALF JKS GWT
00A Issued for Review 17-09-2021 SS/ALF JKS GWT
REV. DESCRIPTION DATE PREPARED CHECKED APPROVED
PEMBANGUNAN FASILITAS
SAMBUNGAN LISTRIK PLN 20KV
RU V BALIKPAPAN
PT. PERTAMINA (PERSERO)
Document No. DRAWING REV. Pages:
TYPICAL STANDARD DETAIL POWER &
PLN20KV-EE-52-DWG-013 00I 2 of 4
LIGHTING INSTALLATION

REVISION SHEET

Rev. Date Description


No.

00A 17-09-2021 ISSUED FOR REVIEW

001 12-10-2021 ISSUED FOR APPROVAL

00I 30-10-2021 ISSUED FOR CONSTRUCTION


TYP.TAGGING CABLE
Scale: 1:25

TYP.INSTALL.RECEPTACLE OUTLET TYP.INSTALL.SWITCH LIGHTING


Scale: 1:25 Scale: 1:25

TYP.NAME TAG EQUIP.


Scale: 1:25

Daniar R Agung Prijadi


TYP.INSTALL. INDOOR LIGHTING TYP.INSTALL. OUTDOOR LIGHTING 19/11/2021
Scale: 1:20
Scale: 1:20

APPROVED DATE SIGNED REMARK

DRAWN

CHECK

JEKLIN S PEMBANGUNAN FASILITAS SAMBUNGAN LISTRIK PLN 20KV RU V BALIKPAPAN


SITE MANAGER PT.PERTAMINA (PERSERO)

GAWITNO
PROJECT MANAGER
BY PREPARED CHKD APVD
REV DATE DESCRIPTION
CONSULTANT AI
Daniar R Agung Prijadi
19/11/2021

TYP.LIGHTING POLE FOR TRAFFO


Scale: 1:20

APPROVED DATE SIGNED REMARK

DRAWN

CHECK

JEKLIN S PEMBANGUNAN FASILITAS SAMBUNGAN LISTRIK PLN 20KV RU V BALIKPAPAN


SITE MANAGER PT.PERTAMINA (PERSERO)

GAWITNO
PROJECT MANAGER
BY PREPARED CHKD APVD
REV DATE DESCRIPTION
CONSULTANT AI

You might also like