Package-01B

Date of Approval/Date
District Length in District
Sr. No. Stage Submission Date of Submission of Finalisation by From (Km.) To (Km.) No. of Village Remarks
Involved (Km.)
NHIDCL
24.07.2018 (Draft)
1 Inception Report IR with QAP Approved by Authority
20.07.2019 (Final)

2 Alignment Report
Existing RoW has been pending since
Alignment Report (PART-01) - Ri-Boi 0/000 22/000 22.000 12 Villages DC Office has not given any schedule
(a) Mawlyngkhung to Mawryngkneng( 48 km) yet.
Alignment Report (PART-02)
10.12.2021 EKH 22/000 48/000 26.000 04 Villages
From Km. 22/000 to Km. 48/000

Alignment Report (PART-01)


19.12.2021 - NGH 0/000 12/000 12.000 11 Villages
From Km. 0/000 to Km. 34/400
(b) Dainadubi to Darugiri (44.5 km)
Alignment Report will
Alignment Report (PART-02)
be shared by 31st EGH 12/000 44/500 32.500 12 Villages
From Km. 34/400 to Km. 44/500
December

(c) Darugiri to William Nagar (39 km) 27.12.2021 EGH 0/000 39/000 39.000 10 Villages

27.12.2021 EKH 0/000 8/500 8.500 02 Villages


(d) Mawryngkneng to West Jaintia Hills (16 km)
WJH 8/500 16/000 7.500 04 Villages

Alignment is being planned since


widening/Improvement is not easy
WJH 0/000 16/000 16.000 07 Villages
along the existing alignment. We will
(e) Jowai - Ratacherra (101 Km) share the Draft Alignment by 30th
December.

EJH 16/000 110/000 94.000 32 Villages

3 Feasibility Report (with Bidding Document)

4 LA & Clearances I Report

Utility Shifting Plan signed by PHE and MePDCL


(a)
Executive Engineer for Both District

Section-11 Published on 19th November (EKH


(b)
District) & 17th December (Ri-Bhoi District)

Estimates for Existing Structures (PWD Building)


(c)
is Being Prepared jointly with Department.

(d) Forest NOC Obtained.

5 Draft Detailed Project Report


6 Final DPR