Professional Documents
Culture Documents
FABRICATION BOM
S.NO BUILDING
MATERIAL DESCRIPTION QTY
1 STORE BUILDING-TRUSS MATERIALS
2 ALL SLIDING DOORS
3 MAIN BUILDING-SHUTTERS,DOORS & GRILLS
4 MAIN GATE ZINC RICH PRIMER,MIO,FINISH PAINT
5 BOILER SHED- TRUSS
6 BOILER STRUCTURES-FEED WATER TANKS
7 TFH EXPANSION TANK
ms plate
AREA OF METAL
CHANNELS
CONTACT 9791315178
Subject:
Dear sir,
We have completed painting work for DG SHED and CRP shed column
Please release the payment for below mentioned
THANKING YOU,
LABOUR BILL
CONTRACTOR NAME Mr.Prabhakaran
SUBJECT
Labour bill for painting work
DETAILS
DATE NO OF LABOURS WORK DONE
CBR PRS line MS pipe aluminium painting
20.12.2021 2 L angles painting for SUHAN PRABHU-Wind bracings
Jigger pipe line columns painting
SUHAN POWERTECH pipe line supports painting
21.12.2021 2
CRP rafters cleaning
STENTER platform rust cleaning and primer painting
22.12.2021 2
SUHAN POWERTECH supports yellow primer painting
South end pipe rack touch-up and painting -3 nos
23.12.2021 3
SUHAN POWERTECH pipe column channels painting
South end pipe rack touch-up and painting -3 nos
24.12.2021 4
Mazzanine front cable support angles painting
TOTAL