WindSCADA Requirements and Compliance
EEG 2017 and TR 10
Rev. 01 - EN 2019-06-19
imagination at work
© 2019 General Electric Company. All rights reserved.
- Original Document -
GE Renewable Energy
Visit us at
www.gerenewableenergy.com
All technical data is subject to change in line with ongoing technical development!
All documents are copyrighted within the meaning of the Copyright Act. We reserve all rights for the exercise of
commercial patent rights.
This document is public. GE and the GE Monogram are trademarks and service marks of
General Electric Company.
Other company or product names mentioned in this document may be trademarks or registered trademarks of
their respective companies.
imagination at work
WindSCADA_System_Requirements_and_Compliance_50Hz_EN_r01
- Original Document -
Table of Contents
1 Introduction ..................................................................................................................................................................................................... 5
2 Operating Data to be Maintained .......................................................................................................................................................... 5
2.1 Plant Parameters ................................................................................................................................................................................ 5
2.2 Wind Turbine Status Information ............................................................................................................................................... 5
2.3 Further Necessary Data ................................................................................................................................................................... 6
2.4 GE Scope and Customer Scope .................................................................................................................................................... 6
3 Classification and Certification of WindSCADA and WindCONTROL Status Codes ..................................................... 6
4 Calculation of Technical Availability ..................................................................................................................................................... 6
5 Data Storage .................................................................................................................................................................................................... 7
6 Data Protection .............................................................................................................................................................................................. 7
1 Introduction
The EEG 2017 and the FGW guideline TR 10 contain several requirements for turbine operational data and their
analysis. This document describes the different requirements and how these can be handled. EEG 2017 and TR
10 are obligations for the windfarm owner, GE Renewable Energy will assist the owner to fulfill these.
EEG 2017 means Renewable Energy Sources Act (Gesetz für den Ausbau erneuerbarer Energien (Erneuerbare-
Energien-Gesetz - EEG 2017) a law in Germany.
TR 10 stands for Technical Guideline Nr. 10 of the FGW e.V. (Fördergesellschaft Windenergie und andere
Dezentrale Energien).
Amount of yield and indication of the type and time period that has already been compensated for
in the evaluation period (e.g. billing of feed -in management, direct marketing)
Feed-in meter data of the relevant point of common coupling in at least monthly resolution;
Information on each additional generating unit connected to the same meter point:
Date of commissioning
Data of the plant-specific feed-in meter for the evaluation period in at least monthly
resolution, if available
Alternatively, if this feed-in data is unavailable, the billing key according to which the feed-in
energy was allocated to the individual or the sum of the remaining generating units is required
5 Data Storage
The often used windfarm compact SCADA server is not capable to store the necessary data for the periods
required by TR 10. The owner must ensure that data is downloaded and stored on a regular basis.
Data retention capabilities of different SCADA systems are detailed in the WindSCADA technical description
document.
6 Data Protection
EEG Annex 2 section 7.3 mandates that the owner must organize data management in a way that the turbine
operational data can be downloaded by qualified third parties in a way that the data cannot be manipulated
later. According to TR 10 such kind of protection can be reached by use of access rights restrictions.
GE Renewables Energy is evaluating the requirements and plans to offer solutions for customers around data
download, storage and protection against manipulation.