13.1 General
Contractor shall provide to Employer, not less than six weeks prior to the date of
commencement of the fire and gas system test, a detail schedule of the tests and sample test
record forms for approval. The tests shall not be undertaken until the test schedule and test
record forms are approved by Employer.
An operating and maintenance manual and final certified copy of "As-Built" drawings shall be
provided for the Employer exclusive use during final works testing and inspection.
Contractor shall provide Product Certificate of device and equipment supplied.
Contractor shall do integration test between Fire and Gas Local Control with Local SCADA
system during SIAT.
Piping for the gas extinguishing agent supply system shall be leakage check.
Integration test between F&G System and Local SCADA should be completed