during execution is the choice, The joint then the proper shear key must between the be provided in the center of the existing pour and structure along the length so that the bond is well maintained. the new pour, Still, to avoid leakage of any which is known slurry from the outer surface, a as the small formwork shutter should be continued from the bottom of the construction existing structure will prevent it. joint, is not well If a solution is to be obtained maintained after concreting, then a suitable grout mixture of GP2 has to be grouted using one of the grouting techniques so that any further damage is created Observation: The As the situation is joint area is where pertained post foam provided during shuttering is concreting, a suitable provided too deep and strong mortar has hence the foam is to be prepared and got stuck in the applied at the junction structure, and the binding wire is to bring back to surface exposed out thickness, and also the primary reason can binding wire will be be of covered with reinforcement cage shifted outside appropriate plaster thickness Observation: Curing is not Liner system of carried out, which leads to shrinkage curing or cracks because application of hydration reactions are already curing started since the pour of concrete compound has to be carried out if else the structure reliability comes down Observation: The Appropriate cover has main reinforcement bar has come out, to be checked at and the binding shutter bottom wire is tied out. middle and center so This is caused due to reinforcement that reinforcement cage shifted cage is according the given dimensions that confirms that there is no shift of further reinforcement