Biogas Calculator

Software Manual

August, 2018
Table of Contents
ACKNOWLEDGEMENT ........................................................................................................................ii
INTRODUCTION ................................................................................................................................ iii
BIOGAS CALCULATOR MANUAL ..........................................................................................................1
Interface .................................................................................................................................................... 1
Entering Initial Values ............................................................................................................................... 1
Biogas Calculations ................................................................................................................................... 2
Construction Details.................................................................................................................................. 3
Land Excavation Requirement and Material Quantities ........................................................................... 4
Calculated Bill of Quantities ...................................................................................................................... 5
ADMINISTRATION ..............................................................................................................................6
REPORTS............................................................................................................................................6
Sample Reports ......................................................................................................................................... 7
Materials Quantity ................................................................................................................................ 7
Bill of Quantities.................................................................................................................................... 9

i
ACKNOWLEDGEMENT
The project team would like to acknowledge the European Union for providing the funding to implement
this project.

The UN Agencies including UNEPs Regional Office for Africa, UNOPS and UNDP all gave their support in
the implementation of the project.

The Ghana National Cleaner Production Centre (GNCPC) acknowledges the support of the Energy
Commission for their initial input to the excel calculator when it was developed making sure the
calculations and formulae developed are properly done.

The team made up of Mr. Senyo Anipa the IT/software engineer, Mr. John Afari Idan of Biogas
Technologies Africa Ltd, Mr. Moses Pumpuni of Vulpec Ghana Ltd, Ing. Daniel Digber the Project Manager
for the Promotion of Biogas Technologies Project, Edmund Owusu-Nyarko of Ghana National Cleaner
Production Centre and Mr. Lambert Faabeluon Director of the Ghana National Cleaner Production Centre
all worked tirelessly to ensure the software worked well.

ii
INTRODUCTION
This manual provides step by step guide on the use of the biogas software/calculator. This
software was developed with funding from the European Union and support from UNEP, UNDP
and UNOPS.
The Ghana National Cleaner Production Centre developed this software through the
implementation of the Promotion of the Biogas Technologies Project under the SWITCH Africa
Green Programme. The Promotion of the Biogas Technologies Project was implemented over a
period of 33 months during which artisans were trained to construct the biogas digester. During
the commencement of the project, the GNCPC and its stakeholders saw the need to develop an
estimator or calculator that will provide a bill of quantity for the design and construction of the
biogas plant and serve as a reference point and guide to help both contractors and their clients.
This is also to provide an estimate of how much a biogas plant will cost using local raw materials.
Various steps have been put together to develop this software. The initial step was to identify
the key indicators and also the calculations that needed to be done in an excel format. The excel
calculator is rechecked to ensure that all required calculations are done to achieve the required
output. The team worked with an IT software developer to convert the Microsoft excel into a
software as the final outcome.

iii
BIOGAS CALCULATOR MANUAL
Interface
Install the software after which the interface will show in the diagram below.
Enter usurname and password

Entering Initial Values

Biogas Calculations  HFM Human Faecal Matter Menu


The Calculations Form has four (4) tabs
1. Biogas Calculations
2. Construction Details
3. Land Excavation Requirement
4. Calculate Bill Of Quantities

1
Biogas Calculations
Two (2) treatments are considered in the calculations

1. Black Water / Primary Treatment


a. Enter the Population
b. Enter the Cistern Size in Litres
c. Enter No. Of Flush per Person per Day
d. This will give us the Total Black water
2. Grey Water / Secondary Treatment
a. Check the Secondary Treatment Checkbox
b. Enter the Water Qty (L/day)
c. This and the Population will give you the Total Grey Water
3. Select the Hydraulic Retention Period to Calculate the Gas Volume
4. The above values will calculate the following

a. Estimated Volum of Digester, m3


b. Total influent in l/day
c. Estimated Gas Generated in litres
d. Equivalent LPG Volume, kg/day
e. Estimated Volume of Gas, m3 /day

2
5. Biogas Plant Specification

a. Enter No Of Plants needed


b. Enter the desired Design Pressure
c. Enter the % to charge for Workmanship
d. Enter % for Miscellaneous
e. Enter the % allowed Wastage for Concrete, Bricks, Mortar and Wiremesh.
f. Make sure the Concrete Specifications (Mix Ratios) are OK, Click on value to
change.
g. Make sure the Mortar Specifications are OK
6. Click on the Confirm Values to Calculate the Estimated Project Cost
7. Enter the Cost of a 17kg Cylinder to Calculate the Savings / year.

Construction Details

3
The values in the coloured rows in the above image can be altered on this form to calculate the
Bill of Quantities.
Click Confirm Values for B of Q Button to commit the changed values.

Land Excavation Requirement and Material Quantities


Click the Land Excavation Requirement Tab

Clicking the Button on the Construction Details page calculates the Land Requirement Excavation values.

4
Changing the values on line the 3, 5, 6 and 9 in the list will calculate the following
1. Actual Calculated Area to Construct Expansion Chamber
2. Actual Calculated Area to Construct Digester
3. Area Between Digester Wall and Expansion Chamber
4. The above three will give us the Total Land Area Required

Material Quantities Calculated

Calculated Bill of Quantities


This tab shows the Calculated Values of the items in the Bills of Quantities.

5
ADMINISTRATION

1. Click on Users to create users


2. Click on Prices to Set prices of Construction Materials

REPORTS

Samples Reports attached.

6
Sample Reports
Materials Quantity

S/No Digester Part Standard Standard Market Market Unit


Quantity Unit Quantity
A. Casting of Foundation Ring
1 Quantity of cement required to cast 0.93 mᶟ 25.00 Bags
Foundation Ring
2 Quantity of sand required to cast 1.87 mᶟ 101.08 Head Pans
Foundation Ring
3 Quantity of aggregate required to cast 3.73 mᶟ 101.00 Head Pans
Foundation Ring
4 Quantity of Lime required to cast 0 mᶟ 0.00 Bags
Foundation Ring

B. Casting of Digester Base Concrete


Slab
1 Quantity of cement required to cast 2.72 mᶟ 74.00 Bags
Digester Base Slab
2 Quantity of sand required to cast 8.17 mᶟ 441.62
Digester Base slab
3 Quantity of aggregate required to cast 16.33 mᶟ 441.00
Digester Base Slab
4 Quantity of Lime required to cast 0 mᶟ 0.00 Bags
Digester Base Slab

C. Casting of Expansion Chamber


Foundation Ring
1 Quantity of cement required to cast Exp. 0.33 mᶟ 9.00 Bags
Chamber Foundation Ring
2 Quantity of sand required to cast Exp. 0.99 mᶟ 53.51
Chamber Foundation Ring
3 Quantity of aggregate required to cast 1.97 mᶟ 53.00
Exp. Chamber Foundation Ring
4 Quantity of Lime required to cast Exp. 0 mᶟ 0.00 Bags
Chamber Foundation Ring

7
D. Casting of Expansion Chamber
Base Concrete Slab
1 Quantity of cement required to cast Exp. 0.87 mᶟ 24.00 Bags
Chamber Concrete Slab

2 Quantity of sand required to cast Exp. 2.62 mᶟ 141.62 Headpans


Chamber Concrete Slab
3 Quantity of aggregate required to cast 5.23 mᶟ 141.00 Headpans
Exp. Chamber Concrete Slab
4 Quantity of Lime required to cast Exp. 0 mᶟ 0.00 Bags
Chamber Concrete Slab

E. Constructing Digester Wall


1 Number of bricks needed to construct 7362 Bricks 7,362.00 Bricks
the digester wall
2 Quantity of cement required for 1 mᶟ 27.00 Bags
constructing digester wall

3 Quantity of sand required to lay bricks 3 mᶟ 162.16 Headpans

4 Quantity of Lime required to lay bricks 0 mᶟ 0.00 Bags

5 Quantity of cement required to plaster 3.78 mᶟ 102.00 Bags


the outside of the digester

F. Constructing Expansion Chamber


Wall
1 Number of bricks needed to construct 6 Bricks 6.00 Bricks
Expansion Chamber
2 Quantity of Cement required to construct 0.51 mᶟ 14.00 Bags
the Expansion Chamber
3 Quantity of sand required for 1.54 mᶟ 83.24 Headpans
constructing the Expansion Chamber
4 Quantity of Lime required to lay bricks 0 mᶟ 0.00 Bags

G. Plastering of Digester and


Expansion Chamber
1 Quantity of cement required to plaster 2.52 mᶟ 68.00 Bags
the outside of the digester and
Expansion Chamber
2 Quantity of Sand required to plaster the 7.57 mᶟ 409.19 Headpans
outside of the digester and Expansion
Chamber

8
3 Quantity of Lime required to plaster the 3.78 mᶟ 102.00 Bags
outside of the digester and Expansion
Chamber
4 Quantity of Cement required to plaster 2.11 mᶟ 57.00 Bags
the Inside of the digester and Expansion
Chamber
5 Quantity of Sand required to plaster the 6.32 mᶟ 341.62 Headpans
Inside of the digester and Expansion
Chamber
6 Quantity of Lime required to plaster the 3.16 mᶟ 85.00 Bags
Inside of the digester and Expansion
Chamber
1 Quantity of water proof cement required 0 mᶟ 1.00 Bags
to plaster the outside of the digester and
Expansion Chamber
1 Quantity of Water proof Cement required 2.11 mᶟ 57.00 Bags
to plaster the Inside of the digester and
Expansion Chamber

H. Dome Screeding
1 Quantity of Cement required to 2.11 mᶟ 57.00 Bags
plaster/screed the digester's dome
2 Quantity of smooth Sand required to 1.06 mᶟ 29.00 Headpans
plaster/screed the digester's dome
3 Quantity of Lime required to 2.11 mᶟ 57.00 Bags
plaster/screed the digester's dome
1 Quantity of Water Proof Cement 0 mᶟ 1.00 Bags
required to plaster/screed the digester's
dome

Cement bag 50kg,


Lime Bag 1kg

Bill of Quantities

Bill of Quantities for the construction of 1 No. 240 m3 CAMARTEC Biogas Plant

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


A
1 Preliminaries
Clearing of site to get it ready for 112.22 m2 0.00 0.00
commencement of work, provision of sheds for
keeping materials and the provision of security
for the site 37.19
Fencing the work area 37.19 112.22 m2 0.00 0.00

9
Sub Total Preliminaries 0.00
0.00

B
1 Excavation
Excavate pit for digester 5.01 m depth 368.89 mᶟ 11.26 6,823.11
including trench for concrete footing used as
foundation ring. Place excavated material min.
3m away from the edge of pit 0
Excavate pit for expansion chamber 2.11 m 26.35 mᶟ 11.26 2,489.92
depth including trench for concrete footing
used as foundation ring. Place excavated
material min. 3m away from the edge of pit 0
Backfill excavated material, well compacted 280.24 mᶟ 11.26 -1,694.40
around digester walls 0
Backfill excavated material, well compaced -40.08 mᶟ 11.26 2,489.92
around expansion chamber walls 0
Spread and compact surplus excavated 155.08 mᶟ 11.26 8,517.51
material and remove excess from site 0
Sub Total Excavation 18,626.07

2 Casting of Foundation Ring


Cement required to cast concrete 400 mm. 0.93 mᶟ 915.00 850.95
thick footing as foundation ring. 1:2:4 Agg. <
38mm
Sand required to cast concrete 400 mm thick 1.87 mᶟ 189.00 353.43
footing as foundation ring. Mixing Ratio is:
1:2:4 Agg. < 38mm
Aggregate required to cast concrete 400 mm 3.73 mᶟ 350.00 1,305.50
thick footing as foundation ring. Mixing Ratio
is: 1:2:4 Agg. < 38mm
Lime required to cast concrete 400 mm thick 0.00 mᶟ 5.00 0.00
footing as foundation ring. Mixing Ratio is:
1:2:4 Agg. < 38mm
Sub Total Casting of Foundation Ring 2,509.88

3 Casting Digester Base


Cement required to cast concrete slab 150 2.72 mᶟ 915.00 2,488.80
mm thick as digester base. Mixing Ratio is:
1:2:4 Agg. < 38mm
Sand required to cast concrete slab 150 mm 8.17 mᶟ 189.00 1,544.13
thick as digester base. Mixing Ratio is: 1:2:4
Agg. < 38mm
Aggregate required to cast concrete slab 150 16.33 mᶟ 350.00 5,715.50
mm thick as digester base. Mixing Ratio is:
1:2:4 Agg. < 38mm
Lime required to cast concrete slab 150 mm 0.00 mᶟ 5.00 0.00
thick as digester base. Mixing Ratio is: 1:2:4
Agg. < 38mm
Sub Total Casting Digester Base 9,748.43

4 Constructing Digester Wall

10
Quantity of bricks required to construct a 240 7,362.00 Bricks 2.00 14,724.00
m3 digester wall of
80 mm thick.
Cement required to make mortar to construct 1.00 mᶟ 915.00 915.00
digester wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Sand required to make mortar to construct 3.00 mᶟ 189.00 567.00
digester wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Lime required to make mortar to construct 0.00 mᶟ 5.00 0.00
digester wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Sub Total Constructing Digester Wall 16,206.00

5 Constructing Expansion Chamber


Wall
Quantity of bricks required to construct a 17 1,260.00 Bricks 2.00 824.00
m2 Expansion Chamber wall of 80 mm thick
Cement required to make mortar to construct 0.51 mᶟ 915.00 466.65
masonry wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Sand required to make mortar to construct 1.54 mᶟ 189.00 291.06
digester wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Lime required to make mortar to construct 0.00 mᶟ 5.00 0.00
digester wall of 80 mm thick. Mixing Ratio for
mortar, (cement: sand: lime:waterproof
cement) is ( 1:3:0 )
Sub Total Constructing Expansion Chamber Wall 1,581.71

6 Plastering of Digester and


Expansion Chamber Walls
Quantity of Cement required to plaster the 2.52 mᶟ 915.00 2,305.80
outside of the digester and Expansion
Chamber Walls 0
Quantity of Sand required to plaster the 7.57 mᶟ 189.00 1,430.73
outside of the digester and Expansion
Chamber Walls 0
Quantity of Lime required to plaster the 3.78 mᶟ 5.00 18.90
outside of the digester and Expansion
Chamber Walls 0
Quantity of Cement required to plaster the 2.11 mᶟ 915.00 1,930.65
inside of the digester and Expansion Chamber
Walls 0
Quantity of Sand required to plaster the inside 6.32 mᶟ 189.00 1,194.48
of the digester and Expansion Chamber Walls
0

11
Quantity of Lime required to plaster the inside 3.16 mᶟ 5.00 15.80
of the digester and Expansion Chamber Walls
0
Quantity of Water proof Cement required to 2.11 mᶟ 1.00 2.11
plaster the inside of the digester and
Expansion Chamber Walls 0
Quantity of Water proof Cement required to 0.00 mᶟ 1.00 0.00
plaster the outside of the digester and
Expansion Chamber Walls 0
Sub Total Plastering of Digester and Expansion Chamber Walls 6,898.47

7 Digester Dome & Expansion


Chamber Screeding
Quantity of cement required to plaster/ screed 2.11 mᶟ 915.00 1,930.65
the digester's dome (gas holding surface) and
the Expansion chamber 0
Quantity of smooth sand required to plaster/ 1.06 mᶟ 189.00 200.34
screed the digester's dome (gas holding
surface) and the expansion chamber 0
Quantity of Lime required to plaster/screed the 2.11 mᶟ 5.00 10.55
digester's dome and expansion chamber 0
Quantity of Water proof cement required to 0.00 mᶟ 1.00 0.00
plaster/ screed the digester's dome (gas
holding surface) and the Expansion chamber 0
Sub Total Digester Dome & Expansion Chamber Screeding 2,141.54

8 Reinforcements (Mild Steel and


Wiremesh)
Quantity of chicken wire mesh required to 170.74 m2 7.00 1,195.18
attach to the external surface of the digester
wall 0
Quantity of chicken wire mesh required to be 29.26 m2 7.00 204.82
placed on the Foundation Ring of the digester
0
Quantity of chicken wire mesh required to 42.00 m2 7.00 121.45
attach to the external surface of the Expansion
chamber wall 0
Sub Total Reinforcements (Mild Steel and Wiremesh) 1,521.45

9 Starting the Plant


Inoculation of the 240 CAMARTEC Biogas 1.00 Item 800.00 800.00
Plant
Sub Total Starting the Plant 800.00
60,033.55

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


1 Excavation cost 790.47 m3 11.26 15,672.02

2 Total Number of Cement Bags required 11.90 m3 915.00 10,888.50

12
3 Quantity of Sand Required 29.53 m3 189.00 5,581.17

4 Quantity of Aggregates Required 20.06 m3 350.00 7,021.00

5 Quantity of Lime Required 9.05 m3 5.00 45.25

6 Quantity of bricks Required 8,622.00 m3 2.00 17,244.00

7 Quantity of Wire Mesh Required 242.00 m2 7.00 1,521.45

8 Preliminaries 224.44 m3 0.00 0.00

Sub Total 57,973.39


9 Starting the Plant 1.00 800.00 800.00

10 Workmanship 0.35 57,973.39 20,290.69

11 Miscellaneous 0.30 57,973.39 17,392.02

12 Number Of Disgester units to be constructed 1.00 Unit/s 1.00 0.00

13 Total Number of Waterproof Cement required 2.11 m3 1.00 2.11

Sub Total 38,484.81


Total Cost of Constructing 1 No. 240 m3 CAMARTEC Biogas Plant 96,458.20