You are on page 1of 4

I&C - Sa

Sr. Notification
Work Order No.
No. No.

1 780117130
2 780117131
3 780117123
4 780117124
5 780117137

1 690028309 790024723
2 790024725
3 780116449
4 780116455
5 780116453
6

Sr.
Suborder (If Applicable)
No.

1
2
I&C - Safety Document Request

Description of Job to be Performed Safety Doc. Requirement

I&C - SDR 07-01-2022 Nigh


Calib. of LP-drum sat. steam CC analyzr LWP
Calib of HPdrum suprheatd steam CCanlyzr LWP
Calib of HP econmzr I/L sample PH anlyzr LWP
Calib of LP econmzr I/L sample PH anlyzr LWP
Calib of boiler HP-drum water PH analyzr LWP
I&C - SDR 08-01-2022 Day
NGC-1 suction TG tightining required. LWP
NGC1 oil leakage from gear box I/L line LWP
Checks of Oily Waste Water Circuit Instr LWP
Calibration of Oily Waste Water Pressure LWP
PM checks of Waste Water Circuit Instrum LWP

Description of Service Required Service Requested by

1 x helper for night I&C


2x helpers for day I&C
Document Request
Services
(Including Permit
Competent Person REMARKS Suborder Requirement
Number if Time
Applicable)

&C - SDR 07-01-2022 Night


Abdul Hafeez PM will be performed. 20:30
Abdul Hafeez PM will be performed. 20:30
Abdul Hafeez PM will be performed. 20:30
Abdul Hafeez PM will be performed. 20:30
Abdul Hafeez PM will be performed. 20:30
&C - SDR 08-01-2022 Day
Bilal TG will be checked and tightness will be performed. 8:30
Ahmed Leakage will be rectified. 8:30
Bilal PM will be performed. 8:30
Ahmed PM will be performed. 8:30
Ahmed PM will be performed. 8:30

Service
ervice Requested by Service to be Provided by required at :
Time
planning 12 Hrs
Planning 12 Hrs
Man Power Estimated
Requirement Duration

1CP+Helper 2 Hours
1CP+Helper 2 Hours
1CP+Helper 2 Hours
1CP+Helper 2 Hours
1CP+Helper 2 Hours

1CP+Helper 4 Hours
1CP+Helper 4 Hours
1CP+Helper 4 Hours
1CP+Helper 4 Hours
1CP+Helper 4 Hours

Service End Time Remarks