Slope Stability Analysis Summary – Rockfill/Backfill Replacement Thickness Optimization

Gravel Replacement Backfill Type I Thickness Factor of Safety


Retaining
Zone Thickness Required Under Required Under the Scenario 1: Scenario 2: Scenario 3: Rapid Scenario 3: Rapid Drawdown
Wall Section
the Wall Base [m] Gravel Replacement [m] HAT LAT Drawdown + Seismic Condition
Zone 1 Section 04 2.0 2.0 1.488 1.483 1.302 1.229
Zone 2 Section 04 1.5 1.5 1.495 1.503 1.309 1.237
Zone 1 – Section 4
Case: Rapid Drawdown
Safety Factor
0.000
15

0.250
0.500
0.750
1.000
1.250 1.302
1.500
20.00 kN/m2 10.00 kN/m2
10

1.750
2.000
2.250
2.500
2.750
3.000
12.000
3.250
5

3.500 W (Initial)
3.750
4.000 W (Final)
1.590
4.250
2.000
4.500 4.800
4.750
0

3.060
5.000 2.000
Unit Weight Cohesion Phi
5.250 Material Name Color Strength Type Water Surface Hu Type Ru
(kN/m3) (kPa) (deg)
5.500
Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant
5.750
6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 31 Water Surface Constant
-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company


1:226
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ Rapid Drawdown Analysis

Project Summary

File Name: Section 04 ‐ Drawdown ‐ Zone 1
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ Rapid Drawdown Analysis
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: Rapid Drawdown
Rapid Drawdown Method: Effective Stress using B‐Bar

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___

Infinite 
Strength Type Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion [kPa] 0 0 0 0 0 0 100
Friction Angle 
29 31 38 40 32 40 45
[deg]
Water Surface Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Hu Value 1 1 1 1 1 1 1
Ru Value 0
Rapid Drawdown 
Undrained  Yes Yes
Behaviour
RD Shear Strength 
CR: 0 CR: 0
Envelope 
PhiR: 0 PhiR: 0
Properties

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
Global Minimums

Method: bishop simplified
FS: 1.301590
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 1.260
Resisting Moment=11358.8 kN‐m
Driving Moment=8726.85 kN‐m
Total Slice Area=111.025 m2

Method: gle/morgenstern‐price
FS: 1.307570
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 1.260
Resisting Moment=11411 kN‐m
Driving Moment=8726.85 kN‐m
Resisting Horizontal Force=628.77 kN
Driving Horizontal Force=480.869 kN
Total Slice Area=111.025 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32218
Number of Invalid Surfaces: 17782

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐113 reported for 230 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32093
Number of Invalid Surfaces: 17907

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐108 reported for 5 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐112 reported for 120 surfaces
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
Error Code ‐113 reported for 230 surfaces

Error Codes

The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐105 = More than two surface / slope intersections with no valid slip surface.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving force 
is very small (0.1 is an arbitrary number).
‐109 = Soiltype for slice base not located. This error should occur very rarely, if at all. It may occur if a very low number of slices is 
combined with certain soil geometries, such that the midpoint of a slice base is actually outside the soil region,even though the slip 
surface is wholly within the soil region.
‐112 = The coefficient M‐Alpha = cos(alpha)(1+tan(alpha)tan(phi)/F) < 0.2 for the final iteration of the safety factor calculation. This 
screens out some slip surfaces which may not be valid in the context of the analysis, in particular, deep seated slip surfaces with many 
high negative base angle slices in the passive zone.
‐113 = Surface intersects outside slope limits.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.30159
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 7.2495 9.43588 15.1006 0 15.1006
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 18.5101 24.0926 38.5562 0 38.5562
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 32.1535 41.8507 54.2687 4.39299 49.8758
4 0.985288 107.754 Gravel Replacement 0 40 40.9372 53.2835 78.5772 15.0765 63.5007
5 0.985288 127.534 Gravel Replacement 0 40 48.4396 63.0485 99.0654 23.927 75.1384
Backfill (Compacted 
6 0.876531 134.85 0 32 47.581 61.9309 130.119 31.0086 99.1099
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 49.3645 64.2524 139.504 36.6787 102.825
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 45.8747 59.7101 137.096 41.5398 95.5559
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 16.4116 21.3612 79.8647 45.6796 34.1851
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 16.2202 21.1121 83.8924 48.7559 35.1365
11 0.807066 71.6365 Sand / Silt 1b 0 31 16.3619 21.2965 83.7226 48.2792 35.4434
12 0.807066 70.028 Sand / Silt 1b 0 31 16.3414 21.2698 82.7143 47.3154 35.3989
13 0.807066 67.7695 Sand / Silt 1b 0 31 16.1585 21.0317 80.8895 45.8869 35.0026
14 0.807066 64.8843 Sand / Silt 1b 0 31 15.8114 20.5799 78.2609 44.0102 34.2507
15 0.807066 61.9575 Sand / Silt 1b 0 31 15.3745 20.0113 75.5308 42.2265 33.3043
16 0.807066 60.2766 Sand / Silt 1b 0 31 14.6078 19.0134 74.295 42.6515 31.6435
17 0.807066 58.1427 Sand / Silt 1b 0 31 13.7375 17.8806 72.4097 42.6515 29.7582
18 0.807066 55.4144 Sand / Silt 1b 0 31 12.6745 16.497 69.6821 42.2265 27.4556
19 0.807066 52.0864 Sand / Silt 1b 0 31 11.4046 14.8441 66.0774 41.3726 24.7048
20 0.807066 48.148 Sand / Silt 1b 0 31 9.90903 12.8975 61.5474 40.0824 21.465

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
21 0.807066 43.5829 Sand / Silt 1b 0 31 8.16309 10.625 56.027 38.344 17.683
22 0.807066 38.3677 Sand / Silt 1b 0 31 6.13428 7.98432 49.4289 36.1408 13.2881
23 0.807066 32.4714 Sand / Silt 1b 0 31 3.77862 4.91822 41.6359 33.4506 8.18534
Backfill (Compacted 
24 0.199396 7.03818 0 32 2.22678 2.89835 36.2155 31.5771 4.63836
Sand)
25 0.358721 11.4556 Grouted Riprap 100 45 117.285 152.657 83.0634 30.406 52.6574

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.30757
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 6.91403 9.04058 14.4679 0 14.4679
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 16.9948 22.2219 35.5625 0 35.5625
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 29.2284 38.2182 49.9397 4.39299 45.5467
4 0.985288 107.754 Gravel Replacement 0 40 36.513 47.7433 71.9746 15.0765 56.8981
5 0.985288 127.534 Gravel Replacement 0 40 43.0003 56.2259 90.9343 23.927 67.0073
Backfill (Compacted 
6 0.876531 134.85 0 32 41.5682 54.3533 117.992 31.0086 86.9837
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 43.5089 56.8909 127.724 36.6787 91.0449
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 40.8209 53.3762 126.96 41.5398 85.4198
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 12.387 16.1969 71.6001 45.6796 25.9205
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 13.1825 17.2371 77.4433 48.7559 28.6874
11 0.807066 71.6365 Sand / Silt 1b 0 31 14.6027 19.0941 80.0572 48.2792 31.778
12 0.807066 70.028 Sand / Silt 1b 0 31 16.0395 20.9728 82.22 47.3154 34.9046
13 0.807066 67.7695 Sand / Silt 1b 0 31 17.4048 22.758 83.7626 45.8869 37.8757
14 0.807066 64.8843 Sand / Silt 1b 0 31 18.5937 24.3125 84.4731 44.0102 40.4629
15 0.807066 61.9575 Sand / Silt 1b 0 31 19.6118 25.6438 84.9049 42.2265 42.6784
16 0.807066 60.2766 Sand / Silt 1b 0 31 20.1655 26.3678 86.535 42.6515 43.8835
17 0.807066 58.1427 Sand / Silt 1b 0 31 20.3097 26.5564 86.8487 42.6515 44.1972
18 0.807066 55.4144 Sand / Silt 1b 0 31 19.8311 25.9305 85.3821 42.2265 43.1556
19 0.807066 52.0864 Sand / Silt 1b 0 31 18.647 24.3823 81.9516 41.3726 40.579
20 0.807066 48.148 Sand / Silt 1b 0 31 16.7214 21.8644 76.4709 40.0824 36.3885
21 0.807066 43.5829 Sand / Silt 1b 0 31 14.0732 18.4017 68.9697 38.344 30.6257
22 0.807066 38.3677 Sand / Silt 1b 0 31 10.7782 14.0932 59.5958 36.1408 23.455
23 0.807066 32.4714 Sand / Silt 1b 0 31 6.96201 9.10331 48.6011 33.4506 15.1505
Backfill (Compacted 
24 0.199396 7.03818 0 32 4.60039 6.01533 41.2037 31.5771 9.62657
Sand)
25 0.358721 11.4556 Grouted Riprap 100 45 120.221 157.198 87.6038 30.406 57.1978

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.30159
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 27.9317 0 0
3 ‐5.41595 3 71.65 0 0
4 ‐4.43067 1.80439 104.881 0 0
5 ‐3.44538 0.821908 141.78 0 0
6 ‐2.46009 0 175.516 0 0
7 ‐1.58356 ‐0.621826 214.756 0 0
8 ‐0.707028 ‐1.156 246.043 0 0
9 0.169503 ‐1.61286 268.5 0 0
10 1.04603 ‐2 285.045 0 0
11 1.8531 ‐2.2997 297.108 0 0
12 2.66017 ‐2.54846 304.741 0 0
13 3.46723 ‐2.74887 308.14 0 0
14 4.2743 ‐2.90287 307.567 0 0
15 5.08136 ‐3.01191 303.351 0 0
16 5.88843 ‐3.07695 295.638 0 0
17 6.6955 ‐3.09857 284.271 0 0
18 7.50256 ‐3.07695 269.413 0 0
19 8.30963 ‐3.01191 251.422 0 0
20 9.11669 ‐2.90287 230.76 0 0
21 9.92376 ‐2.74887 208.008 0 0
22 10.7308 ‐2.54846 183.892 0 0
23 11.5379 ‐2.2997 159.322 0 0
24 12.345 ‐2 135.447 0 0
25 12.5444 ‐1.91774 129.804 0 0
26 12.9031 ‐1.76123 44.772 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.30757
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 26.7728 1.4072 3.00874
3 ‐5.41595 3 67.1244 6.96287 5.92216
4 ‐4.43067 1.80439 97.9711 14.5861 8.46809
5 ‐3.44538 0.821908 132.63 25.2825 10.7925
6 ‐2.46009 0 164.908 37.5996 12.8441
7 ‐1.58356 ‐0.621826 201.763 51.8312 14.4073
8 ‐0.707028 ‐1.156 231.768 65.1558 15.702
9 0.169503 ‐1.61286 253.912 76.2399 16.713
10 1.04603 ‐2 270.749 85.0033 17.43
11 1.8531 ‐2.2997 283.296 91.0902 17.8245
12 2.66017 ‐2.54846 291.4 94.4648 17.9614
13 3.46723 ‐2.74887 294.904 94.9095 17.8398
14 4.2743 ‐2.90287 293.726 92.389 17.4605
15 5.08136 ‐3.01191 287.897 87.0648 16.8262
16 5.88843 ‐3.07695 277.329 79.2171 15.9416
17 6.6955 ‐3.09857 261.696 69.2131 14.8143
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
18 7.50256 ‐3.07695 241.175 57.7012 13.4551
19 8.30963 ‐3.01191 216.343 45.5065 11.8787
20 9.11669 ‐2.90287 188.065 33.514 10.1043
21 9.92376 ‐2.74887 157.48 22.5709 8.1564
22 10.7308 ‐2.54846 125.97 13.3836 6.0646
23 11.5379 ‐2.2997 95.0993 6.42203 3.8633
24 12.345 ‐2 66.5526 1.84865 1.59111
25 12.5444 ‐1.91774 60.0235 1.07239 1.02355
26 12.9031 ‐1.76123 44.772 0 0

List Of Coordinates

Water Table
X Y
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 7
‐0.3 7
‐0.3 6.7
‐1.5 7
‐22.7 7
‐25 7

Material Boundary
X Y
‐4.5 3
‐13.7 3
‐6.962 0
‐2.47 ‐2

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐13.7 3

Material Boundary
X Y
‐25 ‐2
‐2.47 ‐2

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
‐25 ‐6
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
25 ‐6

Material Boundary
X Y
‐0.3 6.7
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐2.47 ‐2
12.75 ‐2

Material Boundary
X Y
0 2.7
1 2.7
7.75 0
12.75 ‐2

Material Boundary
X Y
12.75 ‐2
13 ‐2.1

Material Boundary
X Y
‐6.962 0
7.75 0

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 1.slim
Zone 1 – Section 4
Zone 1 – Section 4
Case: Rapid Drawdown + Seismic Load
Safety Factor
0.000
15

0.250
0.025
0.500
0.750
1.000
1.250 1.229
1.500
20.00 kN/m2 10.00 kN/m2
10

1.750
2.000
2.250
2.500
2.750
3.000
3.250
5

3.500 W (Initial)
3.750
4.000 W (Final)
1.590
4.250
4.500 2.000

4.750
0

3.060
5.000 2.000
Unit Weight Cohesion Phi
5.250 Material Name Color
(kN/m3)
Strength Type
(kPa) (deg)
Water Surface Hu Type Ru
5.500
Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant
5.750
6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 31 Water Surface Constant
-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company


1:226
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ Rapid Drawdown Analysis + Seismic Load

Project Summary

File Name: Section 04 ‐ Drawdown+Seismic ‐ Zone 1
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ Rapid Drawdown Analysis + Seismic Load
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: Rapid Drawdown
Rapid Drawdown Method: Effective Stress using B‐Bar

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

Seismic Load Coefficient (Horizontal): 0.025
2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Infinite 
Strength Type Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion [kPa] 0 0 0 0 0 0 100
Friction Angle 
29 31 38 40 32 40 45
[deg]
Water Surface Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Hu Value 1 1 1 1 1 1 1
Ru Value 0
Rapid Drawdown 
Undrained  Yes Yes
Behaviour
RD Shear Strength 
CR: 0 CR: 0
Envelope 
PhiR: 0 PhiR: 0
Properties

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
Global Minimums

Method: bishop simplified
FS: 1.229210
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 1.260
Resisting Moment=11238.1 kN‐m
Driving Moment=9142.47 kN‐m
Total Slice Area=111.025 m2

Method: gle/morgenstern‐price
FS: 1.238960
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 1.260
Resisting Moment=11327.1 kN‐m
Driving Moment=9142.47 kN‐m
Resisting Horizontal Force=626.459 kN
Driving Horizontal Force=505.634 kN
Total Slice Area=111.025 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32218
Number of Invalid Surfaces: 17782

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐113 reported for 230 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 31770
Number of Invalid Surfaces: 18230

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐108 reported for 6 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐111 reported for 1 surface
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
Error Code ‐112 reported for 441 surfaces
Error Code ‐113 reported for 230 surfaces

Error Codes

The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐105 = More than two surface / slope intersections with no valid slip surface.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving force 
is very small (0.1 is an arbitrary number).
‐109 = Soiltype for slice base not located. This error should occur very rarely, if at all. It may occur if a very low number of slices is 
combined with certain soil geometries, such that the midpoint of a slice base is actually outside the soil region,even though the slip 
surface is wholly within the soil region.
‐111 = safety factor equation did not converge
‐112 = The coefficient M‐Alpha = cos(alpha)(1+tan(alpha)tan(phi)/F) < 0.2 for the final iteration of the safety factor calculation. This 
screens out some slip surfaces which may not be valid in the context of the analysis, in particular, deep seated slip surfaces with many 
high negative base angle slices in the passive zone.
‐113 = Surface intersects outside slope limits.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.22921
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 7.4483 9.15552 14.6519 0 14.6519
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 19.1166 23.4983 37.6052 0 37.6052
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 33.1834 40.7894 53.0039 4.39299 48.6109
4 0.985288 107.754 Gravel Replacement 0 40 42.3651 52.0756 77.1376 15.0765 62.0611
5 0.985288 127.534 Gravel Replacement 0 40 50.2502 61.7681 97.5394 23.927 73.6124
Backfill (Compacted 
6 0.876531 134.85 0 32 49.6353 61.0122 128.648 31.0086 97.6397
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 51.5793 63.4018 138.143 36.6787 101.464
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 48.0065 59.0101 135.976 41.5398 94.4359
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 17.1997 21.142 79.5139 45.6796 33.8343
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 17.0277 20.9306 83.5903 48.7559 34.8344
11 0.807066 71.6365 Sand / Silt 1b 0 31 17.1984 21.1405 83.4628 48.2792 35.1836
12 0.807066 70.028 Sand / Silt 1b 0 31 17.1988 21.1409 82.4998 47.3154 35.1844
13 0.807066 67.7695 Sand / Silt 1b 0 31 17.0283 20.9313 80.7224 45.8869 34.8355
14 0.807066 64.8843 Sand / Silt 1b 0 31 16.6844 20.5086 78.1421 44.0102 34.1319
15 0.807066 61.9575 Sand / Silt 1b 0 31 16.2452 19.9688 75.4602 42.2265 33.2337
16 0.807066 60.2766 Sand / Silt 1b 0 31 15.4568 18.9996 74.2722 42.6515 31.6207
17 0.807066 58.1427 Sand / Silt 1b 0 31 14.5572 17.8938 72.4319 42.6515 29.7804
18 0.807066 55.4144 Sand / Silt 1b 0 31 13.4516 16.5349 69.7451 42.2265 27.5186
19 0.807066 52.0864 Sand / Silt 1b 0 31 12.124 14.9029 66.1751 41.3726 24.8025
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
20 0.807066 48.148 Sand / Silt 1b 0 31 10.5529 12.9717 61.6709 40.0824 21.5885
21 0.807066 43.5829 Sand / Silt 1b 0 31 8.71064 10.7072 56.1637 38.344 17.8197
22 0.807066 38.3677 Sand / Silt 1b 0 31 6.55997 8.06358 49.5608 36.1408 13.42
23 0.807066 32.4714 Sand / Silt 1b 0 31 4.05077 4.97925 41.7375 33.4506 8.28686
Backfill (Compacted 
24 0.199396 7.03818 0 32 2.3929 2.94138 36.2843 31.5771 4.70721
Sand)
25 0.358721 11.4556 Grouted Riprap 100 45 128.015 157.357 87.7632 30.406 57.3572

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.23896
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 7.0751 8.76576 14.0282 0 14.0282
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 17.4276 21.5921 34.5545 0 34.5545
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 29.9189 37.0683 48.5692 4.39299 44.1762
4 0.985288 107.754 Gravel Replacement 0 40 37.3765 46.308 70.2642 15.0765 55.1877
5 0.985288 127.534 Gravel Replacement 0 40 44.049 54.575 88.9671 23.927 65.0401
Backfill (Compacted 
6 0.876531 134.85 0 32 42.6804 52.8793 115.633 31.0086 84.6249
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 44.6983 55.3794 125.305 36.6787 88.626
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 41.9692 51.9982 124.754 41.5398 83.2143
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 12.3809 15.3395 70.2279 45.6796 24.5483
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 13.3016 16.4802 76.1835 48.7559 27.4276
11 0.807066 71.6365 Sand / Silt 1b 0 31 14.9246 18.491 79.0534 48.2792 30.7742
12 0.807066 70.028 Sand / Silt 1b 0 31 16.6072 20.5756 81.559 47.3154 34.2436
13 0.807066 67.7695 Sand / Silt 1b 0 31 18.249 22.6098 83.516 45.8869 37.6291
14 0.807066 64.8843 Sand / Silt 1b 0 31 19.7273 24.4413 84.6875 44.0102 40.6773
15 0.807066 61.9575 Sand / Silt 1b 0 31 21.0364 26.0633 85.603 42.2265 43.3765
16 0.807066 60.2766 Sand / Silt 1b 0 31 21.8514 27.073 87.7085 42.6515 45.057
17 0.807066 58.1427 Sand / Silt 1b 0 31 22.2044 27.5104 88.4364 42.6515 45.7849
18 0.807066 55.4144 Sand / Silt 1b 0 31 21.8458 27.0661 87.2721 42.2265 45.0456
19 0.807066 52.0864 Sand / Silt 1b 0 31 20.6717 25.6114 83.9971 41.3726 42.6245
20 0.807066 48.148 Sand / Silt 1b 0 31 18.6349 23.0879 78.5071 40.0824 38.4247
21 0.807066 43.5829 Sand / Silt 1b 0 31 15.7571 19.5224 70.8347 38.344 32.4907
22 0.807066 38.3677 Sand / Silt 1b 0 31 12.131 15.0298 61.1545 36.1408 25.0137
23 0.807066 32.4714 Sand / Silt 1b 0 31 7.91176 9.80236 49.7645 33.4506 16.3139
Backfill (Compacted 
24 0.199396 7.03818 0 32 5.31426 6.58415 42.114 31.5771 10.5369
Sand)
25 0.358721 11.4556 Grouted Riprap 100 45 131.198 162.55 92.9556 30.406 62.5496

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.22921
X  Y  Interslice  Interslice  Interslice 
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 27.2222 0 0
3 ‐5.41595 3 70.2444 0 0
4 ‐4.43067 1.80439 102.987 0 0
5 ‐3.44538 0.821908 139.743 0 0
6 ‐2.46009 0 173.611 0 0
7 ‐1.58356 ‐0.621826 213.492 0 0
8 ‐0.707028 ‐1.156 245.788 0 0
9 0.169503 ‐1.61286 269.378 0 0
10 1.04603 ‐2 287 0 0
11 1.8531 ‐2.2997 300.129 0 0
12 2.66017 ‐2.54846 308.808 0 0
13 3.46723 ‐2.74887 313.218 0 0
14 4.2743 ‐2.90287 313.607 0 0
15 5.08136 ‐3.01191 310.29 0 0
16 5.88843 ‐3.07695 303.4 0 0
17 6.6955 ‐3.09857 292.776 0 0
18 7.50256 ‐3.07695 278.566 0 0
19 8.30963 ‐3.01191 261.123 0 0
20 9.11669 ‐2.90287 240.903 0 0
21 9.92376 ‐2.74887 218.483 0 0
22 10.7308 ‐2.54846 194.591 0 0
23 11.5379 ‐2.2997 170.144 0 0
24 12.345 ‐2 146.307 0 0
25 12.5444 ‐1.91774 140.662 0 0
26 12.9031 ‐1.76123 44.772 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.23896
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 26.1222 1.48099 3.24489
3 ‐5.41595 3 65.8631 7.36935 6.38421
4 ‐4.43067 1.80439 96.4216 15.4845 9.12332
5 ‐3.44538 0.821908 131.218 26.9805 11.619
6 ‐2.46009 0 164.004 40.3345 13.8169
7 ‐1.58356 ‐0.621826 201.763 55.9077 15.4878
8 ‐0.707028 ‐1.156 233.101 70.6844 16.8691
9 0.169503 ‐1.61286 256.733 83.1499 17.9459
10 1.04603 ‐2 274.947 93.1102 18.7086
11 1.8531 ‐2.2997 288.827 100.173 19.1279
12 2.66017 ‐2.54846 298.204 104.274 19.2734
13 3.46723 ‐2.74887 302.859 105.136 19.1442
14 4.2743 ‐2.90287 302.645 102.681 18.741
15 5.08136 ‐3.01191 297.535 97.0562 18.0664
16 5.88843 ‐3.07695 287.384 88.5454 17.1245

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
17 6.6955 ‐3.09857 271.834 77.5487 15.9224
18 7.50256 ‐3.07695 251.05 64.7877 14.4704
19 8.30963 ‐3.01191 225.638 51.1942 12.7832
20 9.11669 ‐2.90287 196.524 37.7758 10.8807
21 9.92376 ‐2.74887 164.942 25.4997 8.78824
22 10.7308 ‐2.54846 132.383 15.1712 6.53762
23 11.5379 ‐2.2997 100.526 7.32239 4.16611
24 12.345 ‐2 71.1484 2.13174 1.71618
25 12.5444 ‐1.91774 64.4382 1.24181 1.10403
26 12.9031 ‐1.76123 44.772 0 0

List Of Coordinates

Water Table
X Y
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 7
‐0.3 7
‐0.3 6.7
‐1.5 7
‐22.7 7
‐25 7

Material Boundary
X Y
‐4.5 3
‐13.7 3
‐6.962 0
‐2.47 ‐2

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐13.7 3

Material Boundary
X Y
‐25 ‐2
‐2.47 ‐2

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
‐25 ‐6
25 ‐6

Material Boundary
X Y
‐0.3 6.7
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐2.47 ‐2
12.75 ‐2

Material Boundary
X Y
0 2.7
1 2.7
7.75 0
10.25 ‐1
12.75 ‐2

Material Boundary
X Y
12.75 ‐2
13 ‐2.1

Material Boundary
X Y
‐6.962 0
7.75 0

Project
531 C75 - RW - Section 04_Zone 1 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 1.slim
Zone 1 – Section 4
Case: HAT
Safety Factor
0.000
15

0.250
0.500
0.750
1.000
1.250 1.489
1.500
20.00 kN/m2 10.00 kN/m2
10

1.750
2.000
2.250
2.500
2.750
3.000
3.250
5

3.500 W
3.750
4.000
4.250
4.500 2.000
4.650
4.750
0

5.000 2.000
Unit Weight Cohesion Phi
5.250 Material Name Color
(kN/m3)
Strength Type
(kPa) (deg)
Water Surface Hu Type Ru
5.500
Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant
5.750
6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 31 Water Surface Constant
-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company


1:226
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ HAT

Project Summary

File Name: Section 04 ‐ HAT ‐ Zone 1
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ HAT
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: None

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Strength  Infinite 
Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
Type strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion 
0 0 0 0 0 0 100
[kPa]
Friction 
29 31 38 40 32 40 45
Angle [deg]
Water 
Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Surface
Hu Value 1 1 1 1 1 1 1
Ru Value 0

Global Minimums

Method: bishop simplified
Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
FS: 1.489000
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 2.850
Resisting Moment=11646.3 kN‐m
Driving Moment=7821.52 kN‐m
Total Slice Area=111.025 m2

Method: gle/morgenstern‐price
FS: 1.488490
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 2.850
Resisting Moment=11642.3 kN‐m
Driving Moment=7821.52 kN‐m
Resisting Horizontal Force=638.369 kN
Driving Horizontal Force=428.87 kN
Total Slice Area=111.025 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32218
Number of Invalid Surfaces: 17782

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐113 reported for 230 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32217
Number of Invalid Surfaces: 17783

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐108 reported for 1 surface
Error Code ‐109 reported for 4 surfaces
Error Code ‐113 reported for 230 surfaces

Error Codes

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐105 = More than two surface / slope intersections with no valid slip surface.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving 
force is very small (0.1 is an arbitrary number).
‐109 = Soiltype for slice base not located. This error should occur very rarely, if at all. It may occur if a very low number of slices is 
combined with certain soil geometries, such that the midpoint of a slice base is actually outside the soil region,even though the slip 
surface is wholly within the soil region.
‐113 = Surface intersects outside slope limits.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.489
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 6.78281 10.0996 16.1627 0 16.1627
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 17.1089 25.4752 40.7688 0 40.7688
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 29.7688 44.3257 57.2182 4.39299 52.8252
4 0.985288 107.754 Gravel Replacement 0 40 37.6592 56.0746 81.9033 15.0765 66.8268
5 0.985288 127.534 Gravel Replacement 0 40 44.3141 65.9837 102.563 23.927 78.6362
Backfill (Compacted 
6 0.876531 134.85 0 32 42.9811 63.9989 133.428 31.0086 102.42
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 44.4304 66.1569 142.552 36.6787 105.873
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 41.1483 61.2698 139.592 41.5398 98.0517
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 14.6725 21.8473 80.6426 45.6796 34.963
Sand)
10 0.807066 73.0122 Sand / Silt 1b 0 31 14.54 21.65 85.0802 49.0485 36.0317
11 0.807066 74.4285 Sand / Silt 1b 0 31 14.5328 21.6394 87.7526 51.7387 36.0139
12 0.807066 75.376 Sand / Silt 1b 0 31 14.4739 21.5516 89.8098 53.9419 35.8679
13 0.807066 75.6735 Sand / Silt 1b 0 31 14.2717 21.2505 91.047 55.6803 35.3667
14 0.807066 75.3441 Sand / Silt 1b 0 31 13.9253 20.7347 91.4789 56.9705 34.5084
15 0.807066 74.4044 Sand / Silt 1b 0 31 13.4324 20.0009 91.1114 57.8244 33.287
16 0.807066 72.8651 Sand / Silt 1b 0 31 12.7891 19.0429 89.9422 58.2494 31.6928
17 0.807066 70.7313 Sand / Silt 1b 0 31 11.9893 17.8521 87.9604 58.2494 29.711
18 0.807066 68.0029 Sand / Silt 1b 0 31 11.0251 16.4164 85.1458 57.8244 27.3214
19 0.807066 64.6749 Sand / Silt 1b 0 31 9.88556 14.7196 81.4681 56.9705 24.4976
20 0.807066 60.7366 Sand / Silt 1b 0 31 8.55675 12.741 76.8849 55.6803 21.2046
21 0.807066 56.1714 Sand / Silt 1b 0 31 7.02008 10.4529 71.3385 53.9419 17.3966
22 0.807066 50.9563 Sand / Silt 1b 0 31 5.25144 7.81939 64.7524 51.7387 13.0137
23 0.807066 45.06 Sand / Silt 1b 0 31 3.21837 4.79216 57.024 49.0485 7.97549
Backfill (Compacted 
24 0.199396 10.1483 0 32 1.88725 2.81011 51.6721 47.175 4.49706
Sand)
25 0.358721 17.0509 Grouted Riprap 100 45 96.3483 143.463 89.4664 46.0039 43.4625

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.48849
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 6.49651 9.66999 15.4752 0 15.4752
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 15.808 23.53 37.656 0 37.656
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 27.1717 40.4448 52.5933 4.39299 48.2003
4 0.985288 107.754 Gravel Replacement 0 40 33.7361 50.2158 74.9212 15.0765 59.8447
5 0.985288 127.534 Gravel Replacement 0 40 39.4578 58.7325 93.9216 23.927 69.9946
Backfill (Compacted 
6 0.876531 134.85 0 32 37.7876 56.2465 121.022 31.0086 90.0134
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 39.3299 58.5422 130.366 36.6787 93.687
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 36.6965 54.6223 128.954 41.5398 87.4138
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 11.2927 16.809 72.5796 45.6796 26.9
Sand)
10 0.807066 73.0122 Sand / Silt 1b 0 31 12.0051 17.8694 78.7882 49.0485 29.7397
11 0.807066 74.4285 Sand / Silt 1b 0 31 13.0569 19.435 84.0839 51.7387 32.3452
12 0.807066 75.376 Sand / Silt 1b 0 31 14.246 21.205 89.2329 53.9419 35.291
13 0.807066 75.6735 Sand / Silt 1b 0 31 15.3992 22.9215 93.8281 55.6803 38.1478
14 0.807066 75.3441 Sand / Silt 1b 0 31 16.4286 24.4538 97.6686 56.9705 40.6981
15 0.807066 74.4044 Sand / Silt 1b 0 31 17.2334 25.6518 100.516 57.8244 42.6918
16 0.807066 72.8651 Sand / Silt 1b 0 31 17.7064 26.3558 102.113 58.2494 43.8634
17 0.807066 70.7313 Sand / Silt 1b 0 31 17.7431 26.4104 102.204 58.2494 43.9543
18 0.807066 68.0029 Sand / Silt 1b 0 31 17.2525 25.6802 100.563 57.8244 42.739
19 0.807066 64.6749 Sand / Silt 1b 0 31 16.1677 24.0654 97.0221 56.9705 40.0516
20 0.807066 60.7366 Sand / Silt 1b 0 31 14.4551 21.5162 91.4893 55.6803 35.809
21 0.807066 56.1714 Sand / Silt 1b 0 31 12.1209 18.0418 83.9685 53.9419 30.0266
22 0.807066 50.9563 Sand / Silt 1b 0 31 9.21289 13.7133 74.5616 51.7387 22.8229
23 0.807066 45.06 Sand / Silt 1b 0 31 5.81698 8.65852 63.4587 49.0485 14.4102
Backfill (Compacted 
24 0.199396 10.1483 0 32 3.66915 5.4615 55.9151 47.175 8.74006
Sand)
25 0.358721 17.0509 Grouted Riprap 100 45 98.9029 147.216 93.2198 46.0039 47.2159

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.489
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 30.9417 0 0
3 ‐5.41595 3 79.8057 0 0
4 ‐4.43067 1.80439 118.958 0 0

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
5 ‐3.44538 0.821908 162.412 0 0
6 ‐2.46009 0 203.154 0 0
7 ‐1.58356 ‐0.621826 248.542 0 0
8 ‐0.707028 ‐1.156 285.84 0 0
9 0.169503 ‐1.61286 313.635 0 0
10 1.04603 ‐2 332.026 0 0
11 1.8531 ‐2.2997 345.639 0 0
12 2.66017 ‐2.54846 354.651 0 0
13 3.46723 ‐2.74887 358.858 0 0
14 4.2743 ‐2.90287 358.228 0 0
15 5.08136 ‐3.01191 352.807 0 0
16 5.88843 ‐3.07695 342.713 0 0
17 6.6955 ‐3.09857 328.132 0 0
18 7.50256 ‐3.07695 309.327 0 0
19 8.30963 ‐3.01191 286.64 0 0
20 9.11669 ‐2.90287 260.502 0 0
21 9.92376 ‐2.74887 231.454 0 0
22 10.7308 ‐2.54846 200.165 0 0
23 11.5379 ‐2.2997 167.467 0 0
24 12.345 ‐2 134.4 0 0
25 12.5444 ‐1.91774 126.31 0 0
26 12.9031 ‐1.76123 104.297 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.48849
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 29.594 1.33351 2.58001
3 ‐5.41595 3 74.65 6.63846 5.08182
4 ‐4.43067 1.80439 110.711 14.1307 7.27367
5 ‐3.44538 0.821908 151.02 24.6799 9.28131
6 ‐2.46009 0 189.267 36.9953 11.0599
7 ‐1.58356 ‐0.621826 231.34 50.9486 12.4201
8 ‐0.707028 ‐1.156 266.442 64.2144 13.5503
9 0.169503 ‐1.61286 293.133 75.4562 14.4353
10 1.04603 ‐2 311.315 83.7913 15.0643
11 1.8531 ‐2.2997 325.042 89.5985 15.411
12 2.66017 ‐2.54846 334.285 92.9026 15.5314
13 3.46723 ‐2.74887 338.511 93.3968 15.4244
14 4.2743 ‐2.90287 337.349 90.9677 15.0911
15 5.08136 ‐3.01191 330.531 85.6935 14.5345
16 5.88843 ‐3.07695 317.929 77.8546 13.7598
17 6.6955 ‐3.09857 299.592 67.9285 12.7751
18 7.50256 ‐3.07695 275.786 56.5658 11.591
19 8.30963 ‐3.01191 247.022 44.5447 10.2221
20 9.11669 ‐2.90287 214.076 32.7051 8.6861
21 9.92376 ‐2.74887 177.981 21.8689 7.00494

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
22 10.7308 ‐2.54846 140.012 12.7527 5.20431
23 11.5379 ‐2.2997 101.653 5.88495 3.3133
24 12.345 ‐2 64.5457 1.53704 1.36414
25 12.5444 ‐1.91774 55.7487 0.853883 0.87751
26 12.9031 ‐1.76123 104.297 0 0

List Of Coordinates

Water Table
X Y
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load

X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
13 ‐1.8
1 3
0 3
0 7
‐0.3 7
‐0.3 6.7
‐1.5 7
‐22.7 7
‐25 7

Material Boundary
X Y
‐4.5 3
‐13.7 3
‐6.962 0
‐2.47 ‐2

Material Boundary

X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐13.7 3

Material Boundary
X Y
‐25 ‐2
‐2.47 ‐2

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
‐25 ‐6
25 ‐6

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
Material Boundary

X Y
‐0.3 6.7
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐2.47 ‐2
12.75 ‐2

Material Boundary
X Y
0 2.7
1 2.7
7.75 0
12.75 ‐2

Material Boundary
X Y
12.75 ‐2
13 ‐2.1

Material Boundary
X Y
‐6.962 0
7.75 0

Project
531 C75 - RW - Section 04_Zone 1 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 1.slim
Zone 1 – Section 4
Case: LAT
Safety Factor
0.000
15

0.250
0.500
0.750
1.000
1.250 1.483
1.500 20.00 kN/m2 10.00 kN/m2
10

1.750
2.000
2.250
2.500
2.750
3.000
5

3.250
3.500
3.750
4.000
4.250 W
2.000
4.500
0

4.750
2.000
5.000 2.000
Unit Weight Cohesion Phi
5.250 Material Name Color Strength Type Water Surface Hu Type Ru
(kN/m3) (kPa) (deg)
5.500
Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant
5.750
6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 31 Water Surface Constant
-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company


1:226
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ LAT

Project Summary

File Name: Section 04 ‐ LAT ‐ Zone 1
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 1 ‐ LAT
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: None

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Strength  Infinite 
Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
Type strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion 
0 0 0 0 0 0 100
[kPa]
Friction 
29 31 38 40 32 40 45
Angle [deg]
Water 
Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Surface
Hu Value 1 1 1 1 1 1 1
Ru Value 0

Global Minimums

Method: bishop simplified
Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
FS: 1.485780
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 0.200
Resisting Moment=13738.6 kN‐m
Driving Moment=9246.71 kN‐m
Total Slice Area=89.2541 m2

Method: gle/morgenstern‐price
FS: 1.482790
Center: 6.695, 11.977
Radius: 15.076
Left Slip Surface Endpoint: ‐7.535, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.535 7.000
Right Slope Intercept: 12.903 0.200
Resisting Moment=13711 kN‐m
Driving Moment=9246.71 kN‐m
Resisting Horizontal Force=760.115 kN
Driving Horizontal Force=512.623 kN
Total Slice Area=89.2541 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32218
Number of Invalid Surfaces: 17782

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐113 reported for 230 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32206
Number of Invalid Surfaces: 17794

Error Codes:

Error Code ‐99 reported for 17533 surfaces
Error Code ‐105 reported for 15 surfaces
Error Code ‐108 reported for 11 surfaces
Error Code ‐109 reported for 4 surfaces
Error Code ‐111 reported for 1 surface
Error Code ‐113 reported for 230 surfaces

Error Codes

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐105 = More than two surface / slope intersections with no valid slip surface.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving 
force is very small (0.1 is an arbitrary number).
‐109 = Soiltype for slice base not located. This error should occur very rarely, if at all. It may occur if a very low number of slices is 
combined with certain soil geometries, such that the midpoint of a slice base is actually outside the soil region,even though the slip 
surface is wholly within the soil region.
‐111 = safety factor equation did not converge
‐113 = Surface intersects outside slope limits.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.48578
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 6.79172 10.091 16.1489 0 16.1489
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 17.1341 25.4575 40.7404 0 40.7404
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 31.2857 46.4837 55.3971 0 55.3971
4 0.985288 107.754 Gravel Replacement 0 40 43.1695 64.1404 76.4398 0 76.4398
5 0.985288 127.534 Gravel Replacement 0 40 53.579 79.6066 94.8716 0 94.8716
Backfill (Compacted 
6 0.876531 134.85 0 32 51.4832 76.4927 127.426 5.01206 122.414
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 53.2185 79.071 137.222 10.6822 126.54
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 50.1965 74.581 134.897 15.5433 119.354
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 23.9249 35.5471 76.5703 19.6831 56.8872
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 23.5166 34.9405 81.2027 23.052 58.1507
11 0.807066 71.6365 Sand / Silt 1b 0 31 22.668 33.6796 81.7946 25.7422 56.0524
12 0.807066 70.028 Sand / Silt 1b 0 31 21.6233 32.1275 81.4146 27.9454 53.4692
13 0.807066 67.7695 Sand / Silt 1b 0 31 20.3853 30.288 80.0914 29.6838 50.4076
14 0.807066 64.8843 Sand / Silt 1b 0 31 18.9537 28.1611 77.8419 30.974 46.8679
15 0.807066 61.3887 Sand / Silt 1b 0 31 17.3264 25.7432 74.6717 31.8279 42.8438
16 0.807066 57.2934 Sand / Silt 1b 0 31 15.4981 23.0267 70.5759 32.2529 38.323
17 0.807066 52.6037 Sand / Silt 1b 0 31 13.4609 20 65.5384 32.2529 33.2855
18 0.807066 47.5075 Sand / Silt 1b 0 31 11.3011 16.7909 59.7727 31.8279 27.9448
19 0.807066 43.694 Sand / Silt 1b 0 31 9.90799 14.7211 55.4741 30.974 24.5001
20 0.807066 39.7557 Sand / Silt 1b 0 31 8.57657 12.7429 50.8915 29.6838 21.2077
21 0.807066 35.1905 Sand / Silt 1b 0 31 7.03671 10.455 45.3454 27.9454 17.4
22 0.807066 29.9754 Sand / Silt 1b 0 31 5.26414 7.82135 38.7591 25.7422 13.0169
23 0.807066 24.0791 Sand / Silt 1b 0 31 3.22635 4.79365 31.03 23.052 7.97802
Backfill (Compacted 
24 0.199396 4.96475 0 32 1.89204 2.81115 25.6773 21.1785 4.49879
Sand)

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
25 0.358721 7.72537 Grouted Riprap 100 45 96.6276 143.567 63.5748 20.0074 43.5674

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.48279
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.05947 22.4832 0 32 6.40269 9.49384 15.1933 0 15.1933
Sand)
Backfill (Compacted 
2 1.05947 60.624 0 32 15.371 22.7919 36.4748 0 36.4748
Sand)
3 0.985288 82.0283 Gravel Replacement 0 40 27.9717 41.4762 49.4294 0 49.4294
4 0.985288 107.754 Gravel Replacement 0 40 38.749 57.4567 68.4743 0 68.4743
5 0.985288 127.534 Gravel Replacement 0 40 48.76 72.3009 86.1645 0 86.1645
Backfill (Compacted 
6 0.876531 134.85 0 32 45.9589 68.1474 114.07 5.01206 109.058
Sand)
Backfill (Compacted 
7 0.876531 147.791 0 32 47.9726 71.1333 124.519 10.6822 113.837
Sand)
Backfill (Compacted 
8 0.876531 141.11 0 32 45.9253 68.0976 124.522 15.5433 108.979
Sand)
Backfill (Compacted 
9 0.876531 76.352 0 32 21.1087 31.2998 69.7733 19.6831 50.0902
Sand)
10 0.807066 72.5637 Sand / Silt 1b 0 31 21.6739 32.1379 76.5384 23.052 53.4864
11 0.807066 71.6365 Sand / Silt 1b 0 31 21.9757 32.5854 79.9734 25.7422 54.2312
12 0.807066 70.028 Sand / Silt 1b 0 31 22.208 32.9298 82.7498 27.9454 54.8044
13 0.807066 67.7695 Sand / Silt 1b 0 31 22.2899 33.0512 84.6901 29.6838 55.0063
14 0.807066 64.8843 Sand / Silt 1b 0 31 22.1245 32.806 85.5723 30.974 54.5983
15 0.807066 61.3887 Sand / Silt 1b 0 31 21.6069 32.0385 85.1489 31.8279 53.321
16 0.807066 57.2934 Sand / Silt 1b 0 31 20.6353 30.5978 83.1763 32.2529 50.9234
17 0.807066 52.6037 Sand / Silt 1b 0 31 19.1246 28.3578 79.4483 32.2529 47.1954
18 0.807066 47.5075 Sand / Silt 1b 0 31 17.1442 25.4213 74.1361 31.8279 42.3082
19 0.807066 43.694 Sand / Silt 1b 0 31 15.7948 23.4204 69.9522 30.974 38.9782
20 0.807066 39.7557 Sand / Silt 1b 0 31 14.1275 20.9481 64.5473 29.6838 34.8635
21 0.807066 35.1905 Sand / Silt 1b 0 31 11.8418 17.5589 57.1682 27.9454 29.2228
22 0.807066 29.9754 Sand / Silt 1b 0 31 9.02353 13.38 48.0103 25.7422 22.2681
23 0.807066 24.0791 Sand / Silt 1b 0 31 5.80748 8.61128 37.3836 23.052 14.3316
Backfill (Compacted 
24 0.199396 4.96475 0 32 3.84343 5.699 30.2988 21.1785 9.12032
Sand)
25 0.358721 7.72537 Grouted Riprap 100 45 100.023 148.313 68.3201 20.0074 48.3127

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.48578
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 30.9026 0 0
3 ‐5.41595 3 79.7007 0 0

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
4 ‐4.43067 1.80439 115.197 0 0
5 ‐3.44538 0.821908 147.884 0 0
6 ‐2.46009 0 173.219 0 0
7 ‐1.58356 ‐0.621826 207.458 0 0
8 ‐0.707028 ‐1.156 234.243 0 0
9 0.169503 ‐1.61286 252 0 0
10 1.04603 ‐2 260.732 0 0
11 1.8531 ‐2.2997 266.143 0 0
12 2.66017 ‐2.54846 268.248 0 0
13 3.46723 ‐2.74887 267.162 0 0
14 4.2743 ‐2.90287 263.091 0 0
15 5.08136 ‐3.01191 256.325 0 0
16 5.88843 ‐3.07695 247.238 0 0
17 6.6955 ‐3.09857 236.292 0 0
18 7.50256 ‐3.07695 224.042 0 0
19 8.30963 ‐3.01191 210.984 0 0
20 9.11669 ‐2.90287 196.059 0 0
21 9.92376 ‐2.74887 179.393 0 0
22 10.7308 ‐2.54846 161.695 0 0
23 11.5379 ‐2.2997 143.846 0 0
24 12.345 ‐2 126.957 0 0
25 12.5444 ‐1.91774 123.077 0 0
26 12.9031 ‐1.76123 18.8667 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.48279
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.53489 7 0 0 0
2 ‐6.47542 4.64209 29.0241 1.84206 3.6315
3 ‐5.41595 3 72.5928 9.09252 7.13933
4 ‐4.43067 1.80439 104.062 18.7075 10.1914
5 ‐3.44538 0.821908 133.062 30.6277 12.9624
6 ‐2.46009 0 155.718 42.8708 15.3928
7 ‐1.58356 ‐0.621826 186.265 57.7782 17.2336
8 ‐0.707028 ‐1.156 210.625 71.4976 18.75
9 0.169503 ‐1.61286 227.158 82.3591 19.9288
10 1.04603 ‐2 235.621 89.3236 20.7616
11 1.8531 ‐2.2997 241.023 93.5779 21.2189
12 2.66017 ‐2.54846 243.137 95.1734 21.3773
13 3.46723 ‐2.74887 241.753 93.9472 21.2365
14 4.2743 ‐2.90287 236.761 89.9231 20.797
15 5.08136 ‐3.01191 228.191 83.3271 20.0604
16 5.88843 ‐3.07695 216.247 74.5859 19.0299
17 6.6955 ‐3.09857 201.349 64.302 17.7112
18 7.50256 ‐3.07695 184.158 53.2018 16.1136
19 8.30963 ‐3.01191 165.39 42.0069 14.251
20 9.11669 ‐2.90287 144.079 31.003 12.1438

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
21 9.92376 ‐2.74887 120.783 20.9031 9.81854
22 10.7308 ‐2.54846 96.7965 12.4179 7.31047
23 11.5379 ‐2.2997 73.582 5.99997 4.66166
24 12.345 ‐2 52.6866 1.76714 1.92101
25 12.5444 ‐1.91774 48.0349 1.03627 1.23587
26 12.9031 ‐1.76123 18.8667 0 0

List Of Coordinates

Water Table

X Y
‐25 0.2
25 0.2

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load

X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
25 ‐1.8
13 ‐1.8
1 3
0 3
0 7
‐0.3 7
‐0.3 6.7
‐1.5 7
‐22.7 7
‐25 7

Material Boundary
X Y
‐4.5 3
‐13.7 3
‐8.085 0.5
‐6.962 0
‐4.716 ‐1
‐2.47 ‐2

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐13.7 3

Material Boundary

X Y
‐25 ‐2
‐2.47 ‐2

Material Boundary

X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
‐25 ‐6
25 ‐6

Material Boundary
X Y
‐0.3 6.7
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary

X Y
‐2.47 ‐2
12.75 ‐2

Material Boundary
X Y
0 2.7
1 2.7
6.5 0.5
7.75 0
10.25 ‐1
12.75 ‐2

Material Boundary
X Y
12.75 ‐2
13 ‐2.1

Material Boundary

X Y
‐6.962 0
Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
7.75 0

Project
531 C75 - RW - Section 04_Zone 1 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 1.slim
Zone 2 – Section 4
Case: Rapid Drawdown
Safety Factor
0.000
0.250
15

0.500
0.750
1.000
1.250 1.309
1.500
1.750 20.00 kN/m2 10.00 kN/m2
10

2.000
2.250
2.500
2.750
3.000
3.250
5

3.500 W (Initial)
3.750
4.000 W (Final)
4.250
1.500
4.500
4.750
0

1.500
5.000
Unit Weight Cohesion Phi
5.250 Material Name Color
(kN/m3)
Strength Type
(kPa) (deg)
Water Surface Hu Type Ru
5.500
5.750 Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant

6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 33 Water Surface Constant


-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company


1:228
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ Rapid Drawdown Analysis

Project Summary

File Name: Section 04 ‐ Drawdown ‐ Zone 2
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ Rapid Drawdown Analysis
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: Rapid Drawdown
Rapid Drawdown Method: Effective Stress using B‐Bar

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___

Infinite 
Strength Type Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion [kPa] 0 0 0 0 0 0 100
Friction Angle 
29 33 38 40 32 40 45
[deg]
Water Surface Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Hu Value 1 1 1 1 1 1 1
Ru Value 0
Rapid Drawdown 
Undrained  Yes Yes
Behaviour
RD Shear Strength 
CR: 0 CR: 0
Envelope 
PhiR: 0 PhiR: 0
Properties

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
Global Minimums

Method: bishop simplified
FS: 1.309110
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 1.260
Resisting Moment=11395.4 kN‐m
Driving Moment=8704.73 kN‐m
Total Slice Area=109.003 m2

Method: gle/morgenstern‐price
FS: 1.326830
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 1.260
Resisting Moment=11549.7 kN‐m
Driving Moment=8704.73 kN‐m
Resisting Horizontal Force=637.632 kN
Driving Horizontal Force=480.566 kN
Total Slice Area=109.003 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32555
Number of Invalid Surfaces: 17445

Error Codes:

Error Code ‐99 reported for 17445 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32461
Number of Invalid Surfaces: 17539

Error Codes:

Error Code ‐99 reported for 17445 surfaces
Error Code ‐108 reported for 7 surfaces
Error Code ‐112 reported for 87 surfaces

Error Codes

The following errors were encountered during the computation:
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving force 
is very small (0.1 is an arbitrary number).
‐112 = The coefficient M‐Alpha = cos(alpha)(1+tan(alpha)tan(phi)/F) < 0.2 for the final iteration of the safety factor calculation. This 
screens out some slip surfaces which may not be valid in the context of the analysis, in particular, deep seated slip surfaces with many 
high negative base angle slices in the passive zone.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.30911
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.705 7.46847 11.9521 0 11.9521
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 13.4347 17.5875 28.1459 0 28.1459
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 20.5691 26.9272 43.0925 0 43.0925
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 31.6038 41.3729 52.5724 3.26608 49.3063
5 0.800058 81.6297 Gravel Replacement 0 40 38.6317 50.5731 72.3124 12.0417 60.2707
6 0.800058 94.0885 Gravel Replacement 0 40 44.1342 57.7765 88.422 19.5667 68.8553
Backfill (Compacted 
7 0.72498 98.1015 0 32 41.6125 54.4754 112.996 25.8178 87.1785
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 47.842 62.6304 131.252 31.0223 100.229
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 49.1962 64.4033 138.682 35.6155 103.066
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 52.3346 68.5118 145.543 40.0439 105.499
11 0.883557 78.4408 Sand / Silt 1b 0 33 18.0995 23.6942 80.7334 44.2474 36.486
12 0.883557 77.5955 Sand / Silt 1b 0 33 16.7741 21.9591 81.5986 47.7846 33.814
13 0.883557 76.5389 Sand / Silt 1b 0 33 16.8327 22.0358 81.535 47.6028 33.9322
14 0.883557 74.5046 Sand / Silt 1b 0 33 16.7945 21.9858 80.3333 46.4782 33.8551
15 0.883557 71.6271 Sand / Silt 1b 0 33 16.5489 21.6643 78.1629 44.8028 33.3601
16 0.883557 67.9372 Sand / Silt 1b 0 33 16.0918 21.066 75.0357 42.5969 32.4388
17 0.883557 64.6857 Sand / Silt 1b 0 33 15.4253 20.1934 72.3424 41.2472 31.0952
18 0.883557 62.4715 Sand / Silt 1b 0 33 14.5115 18.9971 70.7353 41.4822 29.2531
19 0.883557 59.4978 Sand / Silt 1b 0 33 13.3629 17.4935 68.148 41.2104 26.9376
20 0.883557 55.7439 Sand / Silt 1b 0 33 11.9506 15.6446 64.5196 40.429 24.0906
21 0.883557 51.1972 Sand / Silt 1b 0 33 10.248 13.4157 59.7882 39.1299 20.6583
22 0.883557 45.8555 Sand / Silt 1b 0 33 8.23147 10.7759 53.8924 37.2989 16.5935
23 0.883557 39.895 Sand / Silt 1b 0 33 5.99167 7.84376 46.9938 34.9155 12.0783
24 0.883557 33.1108 Sand / Silt 1b 0 33 3.36853 4.40977 38.7414 31.951 6.79042
25 0.3624 11.2661 Grouted Riprap 100 45 115.155 150.75 80.3092 29.5589 50.7503

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.32683
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.48079 7.27208 11.6378 0 11.6378
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 12.4727 16.5492 26.4843 0 26.4843
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 18.6564 24.7539 39.6144 0 39.6144
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 28.6048 37.9537 48.4975 3.26608 45.2314
5 0.800058 81.6297 Gravel Replacement 0 40 34.3557 45.5842 66.3669 12.0417 54.3252
6 0.800058 94.0885 Gravel Replacement 0 40 38.875 51.5805 81.0379 19.5667 61.4712
Backfill (Compacted 
7 0.72498 98.1015 0 32 35.7307 47.4085 101.687 25.8178 75.8694
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 41.4804 55.0375 119.101 31.0223 88.0784
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 42.9999 57.0536 126.92 35.6155 91.3048
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 46.8172 62.1185 135.698 40.0439 95.6543
11 0.883557 78.4408 Sand / Silt 1b 0 33 13.8902 18.43 72.6271 44.2474 28.3797
12 0.883557 77.5955 Sand / Silt 1b 0 33 13.561 17.9932 75.4918 47.7846 27.7072
13 0.883557 76.5389 Sand / Silt 1b 0 33 15.102 20.0378 78.4583 47.6028 30.8555
14 0.883557 74.5046 Sand / Silt 1b 0 33 16.7862 22.2724 80.7747 46.4782 34.2965
15 0.883557 71.6271 Sand / Silt 1b 0 33 18.3538 24.3524 82.3021 44.8028 37.4993
16 0.883557 67.9372 Sand / Silt 1b 0 33 19.6499 26.0721 82.7443 42.5969 40.1474
17 0.883557 64.6857 Sand / Silt 1b 0 33 20.5903 27.3198 83.316 41.2472 42.0688
18 0.883557 62.4715 Sand / Silt 1b 0 33 21.0367 27.9121 84.463 41.4822 42.9808
19 0.883557 59.4978 Sand / Silt 1b 0 33 20.7477 27.5287 83.6009 41.2104 42.3905
20 0.883557 55.7439 Sand / Silt 1b 0 33 19.5776 25.9761 80.4288 40.429 39.9998
21 0.883557 51.1972 Sand / Silt 1b 0 33 17.4593 23.1655 74.8017 39.1299 35.6718
22 0.883557 45.8555 Sand / Silt 1b 0 33 14.4239 19.1381 66.769 37.2989 29.4701
23 0.883557 39.895 Sand / Silt 1b 0 33 10.7223 14.2267 56.8226 34.9155 21.9071
24 0.883557 33.1108 Sand / Silt 1b 0 33 6.41953 8.51762 45.067 31.951 13.116
25 0.3624 11.2661 Grouted Riprap 100 45 116.493 154.566 84.125 29.5589 54.5661

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.30911
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 15.9203 0 0
3 ‐6.22911 4.0443 42.0954 0 0
4 ‐5.50181 3 72.1503 0 0
5 ‐4.70175 2.03413 97.6654 0 0
6 ‐3.9017 1.21087 126.317 0 0
7 ‐3.10164 0.5 153.895 0 0
8 ‐2.37666 ‐0.0635653 187.434 0 0
9 ‐1.65168 ‐0.561069 218.078 0 0
10 ‐0.926698 ‐1 243.315 0 0
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
11 ‐0.0431408 ‐1.4639 264.631 0 0
12 0.840416 ‐1.85697 280.388 0 0
13 1.72397 ‐2.18505 292.35 0 0
14 2.60753 ‐2.4525 299.298 0 0
15 3.49109 ‐2.66261 301.35 0 0
16 4.37465 ‐2.81779 298.87 0 0
17 5.2582 ‐2.91972 292.313 0 0
18 6.14176 ‐2.9695 281.805 0 0
19 7.02532 ‐2.96763 267.151 0 0
20 7.90887 ‐2.91408 248.77 0 0
21 8.79243 ‐2.80832 227.235 0 0
22 9.67599 ‐2.64922 203.289 0 0
23 10.5595 ‐2.43504 177.868 0 0
24 11.4431 ‐2.1633 151.971 0 0
25 12.3267 ‐1.83066 127.048 0 0
26 12.6891 ‐1.67562 42.2707 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.32683
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 15.5423 0.572646 2.11007
3 ‐6.22911 4.0443 40.2648 2.94841 4.18804
4 ‐5.50181 3 68.0324 7.39422 6.20294
5 ‐4.70175 2.03413 91.9332 13.4316 8.3122
6 ‐3.9017 1.21087 119.017 21.5772 10.2758
7 ‐3.10164 0.5 145.446 31.0867 12.0645
8 ‐2.37666 ‐0.0635653 176.786 42.4876 13.5138
9 ‐1.65168 ‐0.561069 205.893 54.342 14.7851
10 ‐0.926698 ‐1 230.353 65.4747 15.8671
11 ‐0.0431408 ‐1.4639 251.836 76.599 16.9178
12 0.840416 ‐1.85697 268.081 85.3706 17.6641
13 1.72397 ‐2.18505 280.837 91.7877 18.0993
14 2.60753 ‐2.4525 288.445 94.9456 18.2197
15 3.49109 ‐2.66261 290.548 94.5417 18.0244
16 4.37465 ‐2.81779 287.063 90.5931 17.515
17 5.2582 ‐2.91972 278.094 83.4091 16.6956
18 6.14176 ‐2.9695 263.512 73.4455 15.5741
19 7.02532 ‐2.96763 243.01 61.3209 14.1623
20 7.90887 ‐2.91408 217.222 48.0672 12.4774
21 8.79243 ‐2.80832 187.214 34.8449 10.5434
22 9.67599 ‐2.64922 154.462 22.7856 8.39152
23 10.5595 ‐2.43504 120.773 12.8229 6.06059
24 11.4431 ‐2.1633 87.9984 5.53187 3.59707
25 12.3267 ‐1.83066 58.2588 1.07126 1.05343
26 12.6891 ‐1.67562 42.2707 0 0

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
List Of Coordinates

Water Table
X Y
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 6.8
‐0.3 6.8
‐0.3 6.5
‐1.5 7

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
‐22.7 7
‐25 7
‐25 ‐1

Material Boundary
X Y
‐4.5 3
‐12.91 3
‐7.29696 0.5
‐3.92913 ‐1
10.25 ‐1
6.5 0.5
1 2.7
0 2.7

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐12.91 3

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
‐25 ‐6
25 ‐6

Material Boundary
X Y
‐0.3 6.5
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐25 ‐1
‐3.92913 ‐1

Material Boundary
X Y
10.25 ‐1
13 ‐2.1

Material Boundary
X Y
‐7.29696 0.5
6.5 0.5

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown - Zone 2.slim
Zone 2 – Section 4
Case: Rapid Drawdown + Seismic Load
Safety Factor
0.000
0.250
15

0.025
0.500
0.750
1.000
1.250 1.237
1.500
1.750 20.00 kN/m2 10.00 kN/m2
10

2.000
2.250
2.500
2.750
3.000
3.250
5

3.500 W (Initial)
3.750
4.000 W (Final)
1.590
4.250
1.500
4.500
4.750
0

1.500 3.060
5.000
5.250 Unit Weight Cohesion Phi
Material Name Color Strength Type Water Surface Hu Type Ru
(kN/m3) (kPa) (deg)
5.500
5.750 Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant

6.000+ Sand / Silt 1b 17 Mohr‐Coulomb 0 33 Water Surface Constant


-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company


1:228
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ Rapid Drawdown Analysis + Seismic Load

Project Summary

File Name: Section 04 ‐ Drawdown+Seismic ‐ Zone 2
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ Rapid Drawdown Analysis + Seismic Load
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: Rapid Drawdown
Rapid Drawdown Method: Effective Stress using B‐Bar

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

Seismic Load Coefficient (Horizontal): 0.025
2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Infinite 
Strength Type Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion [kPa] 0 0 0 0 0 0 100
Friction Angle 
29 33 38 40 32 40 45
[deg]
Water Surface Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Hu Value 1 1 1 1 1 1 1
Ru Value 0
Rapid Drawdown 
Undrained  Yes Yes
Behaviour
RD Shear Strength 
CR: 0 CR: 0
Envelope 
PhiR: 0 PhiR: 0
Properties

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
Global Minimums

Method: bishop simplified
FS: 1.237350
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 1.260
Resisting Moment=11280 kN‐m
Driving Moment=9116.2 kN‐m
Total Slice Area=109.003 m2

Method: gle/morgenstern‐price
FS: 1.259380
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 1.260
Resisting Moment=11480.8 kN‐m
Driving Moment=9116.2 kN‐m
Resisting Horizontal Force=636.045 kN
Driving Horizontal Force=505.046 kN
Total Slice Area=109.003 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32555
Number of Invalid Surfaces: 17445

Error Codes:

Error Code ‐99 reported for 17445 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32192
Number of Invalid Surfaces: 17808

Error Codes:

Error Code ‐99 reported for 17445 surfaces
Error Code ‐108 reported for 6 surfaces
Error Code ‐112 reported for 357 surfaces

Error Codes

The following errors were encountered during the computation:
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving force 
is very small (0.1 is an arbitrary number).
‐112 = The coefficient M‐Alpha = cos(alpha)(1+tan(alpha)tan(phi)/F) < 0.2 for the final iteration of the safety factor calculation. This 
screens out some slip surfaces which may not be valid in the context of the analysis, in particular, deep seated slip surfaces with many 
high negative base angle slices in the passive zone.

Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.23735
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.8566 7.24667 11.5971 0 11.5971
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 13.8453 17.1315 27.4161 0 27.4161
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 21.2573 26.3027 42.0932 0 42.0932
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 32.6063 40.3454 51.3479 3.26608 48.0818
5 0.800058 81.6297 Gravel Replacement 0 40 39.9453 49.4263 70.9457 12.0417 58.904
6 0.800058 94.0885 Gravel Replacement 0 40 45.7251 56.578 86.9937 19.5667 67.427
Backfill (Compacted 
7 0.72498 98.1015 0 32 43.3412 53.6282 111.64 25.8178 85.8227
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 49.8978 61.7411 129.829 31.0223 98.8067
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 51.3771 63.5714 137.351 35.6155 101.736
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 54.7099 67.6953 144.286 40.0439 104.242
11 0.883557 78.4408 Sand / Silt 1b 0 33 18.9492 23.4468 80.3523 44.2474 36.1049
12 0.883557 77.5955 Sand / Silt 1b 0 33 17.5872 21.7615 81.2945 47.7846 33.5099
13 0.883557 76.5389 Sand / Silt 1b 0 33 17.6742 21.8692 81.2784 47.6028 33.6756
14 0.883557 74.5046 Sand / Silt 1b 0 33 17.6597 21.8512 80.126 46.4782 33.6478
15 0.883557 71.6271 Sand / Silt 1b 0 33 17.4271 21.5634 78.0076 44.8028 33.2048
16 0.883557 67.9372 Sand / Silt 1b 0 33 16.9715 20.9997 74.9335 42.5969 32.3366
17 0.883557 64.6857 Sand / Silt 1b 0 33 16.294 20.1614 72.2931 41.2472 31.0459
18 0.883557 62.4715 Sand / Silt 1b 0 33 15.354 18.9983 70.7371 41.4822 29.2549
19 0.883557 59.4978 Sand / Silt 1b 0 33 14.1635 17.5252 68.1968 41.2104 26.9864
20 0.883557 55.7439 Sand / Silt 1b 0 33 12.6903 15.7024 64.6086 40.429 24.1796
21 0.883557 51.1972 Sand / Silt 1b 0 33 10.9047 13.4929 59.9072 39.1299 20.7773
22 0.883557 45.8555 Sand / Silt 1b 0 33 8.77892 10.8626 54.0258 37.2989 16.7269
23 0.883557 39.895 Sand / Silt 1b 0 33 6.40646 7.92703 47.122 34.9155 12.2065
24 0.883557 33.1108 Sand / Silt 1b 0 33 3.61228 4.46966 38.8337 31.951 6.88268
25 0.3624 11.2661 Grouted Riprap 100 45 125.384 155.144 84.7027 29.5589 55.1438

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.25938
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.60559 7.05957 11.2977 0 11.2977
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 12.773 16.086 25.743 0 25.743
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 19.119 24.0781 38.5331 0 38.5331
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 29.2546 36.8427 47.1735 3.26608 43.9074
5 0.800058 81.6297 Gravel Replacement 0 40 35.1284 44.24 64.7649 12.0417 52.7232
6 0.800058 94.0885 Gravel Replacement 0 40 39.7513 50.062 79.2282 19.5667 59.6615
Backfill (Compacted 
7 0.72498 98.1015 0 32 36.5844 46.0736 99.551 25.8178 73.7332
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 42.5238 53.5536 116.726 31.0223 85.7037
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 44.101 55.5399 124.498 35.6155 88.8824
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 48.118 60.5989 133.358 40.0439 93.3145
11 0.883557 78.4408 Sand / Silt 1b 0 33 13.9105 17.5186 71.2236 44.2474 26.9762
12 0.883557 77.5955 Sand / Silt 1b 0 33 13.6473 17.1871 74.2504 47.7846 26.4658
13 0.883557 76.5389 Sand / Silt 1b 0 33 15.4201 19.4198 77.5068 47.6028 29.904
14 0.883557 74.5046 Sand / Silt 1b 0 33 17.4005 21.9138 80.2225 46.4782 33.7443
15 0.883557 71.6271 Sand / Silt 1b 0 33 19.3004 24.3065 82.2316 44.8028 37.4288
16 0.883557 67.9372 Sand / Silt 1b 0 33 20.937 26.3676 83.1993 42.5969 40.6024
17 0.883557 64.6857 Sand / Silt 1b 0 33 22.2033 27.9624 84.3056 41.2472 43.0584
18 0.883557 62.4715 Sand / Silt 1b 0 33 22.9299 28.8775 85.9496 41.4822 44.4674
19 0.883557 59.4978 Sand / Silt 1b 0 33 22.8208 28.74 85.4661 41.2104 44.2557
20 0.883557 55.7439 Sand / Silt 1b 0 33 21.6944 27.3215 82.5005 40.429 42.0715
21 0.883557 51.1972 Sand / Silt 1b 0 33 19.4651 24.514 76.8781 39.1299 37.7482
22 0.883557 45.8555 Sand / Silt 1b 0 33 16.1669 20.3603 68.6511 37.2989 31.3522
23 0.883557 39.895 Sand / Silt 1b 0 33 12.0856 15.2203 58.3527 34.9155 23.4372
24 0.883557 33.1108 Sand / Silt 1b 0 33 7.32024 9.21897 46.147 31.951 14.196
25 0.3624 11.2661 Grouted Riprap 100 45 126.608 159.448 89.0069 29.5589 59.448

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.23735
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 15.4873 0 0
3 ‐6.22911 4.0443 41.1866 0 0
4 ‐5.50181 3 70.83 0 0
5 ‐4.70175 2.03413 95.9648 0 0
6 ‐3.9017 1.21087 124.469 0 0
7 ‐3.10164 0.5 152.098 0 0
8 ‐2.37666 ‐0.0635653 186.061 0 0
9 ‐1.65168 ‐0.561069 217.286 0 0
10 ‐0.926698 ‐1 243.359 0 0
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
11 ‐0.0431408 ‐1.4639 265.798 0 0
12 0.840416 ‐1.85697 282.609 0 0
13 1.72397 ‐2.18505 295.688 0 0
14 2.60753 ‐2.4525 303.731 0 0
15 3.49109 ‐2.66261 306.832 0 0
16 4.37465 ‐2.81779 305.337 0 0
17 5.2582 ‐2.91972 299.686 0 0
18 6.14176 ‐2.9695 289.989 0 0
19 7.02532 ‐2.96763 276.041 0 0
20 7.90887 ‐2.91408 258.25 0 0
21 8.79243 ‐2.80832 237.181 0 0
22 9.67599 ‐2.64922 213.576 0 0
23 10.5595 ‐2.43504 188.373 0 0
24 11.4431 ‐2.1633 162.581 0 0
25 12.3267 ‐1.83066 137.671 0 0
26 12.6891 ‐1.67562 42.2707 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.25938
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 15.1522 0.602674 2.27772
3 ‐6.22911 4.0443 39.4609 3.11937 4.51981
4 ‐5.50181 3 66.8901 7.84831 6.692
5 ‐4.70175 2.03413 90.5879 14.2877 8.96297
6 ‐3.9017 1.21087 117.753 23.0461 11.0737
7 ‐3.10164 0.5 144.522 33.3461 12.9927
8 ‐2.37666 ‐0.0635653 176.472 45.7853 14.5446
9 ‐1.65168 ‐0.561069 206.409 58.8111 15.9036
10 ‐0.926698 ‐1 231.996 71.1867 17.0583
11 ‐0.0431408 ‐1.4639 255.032 83.7411 18.1779
12 0.840416 ‐1.85697 272.66 93.7349 18.9719
13 1.72397 ‐2.18505 286.863 101.215 19.4346
14 2.60753 ‐2.4525 295.838 105.125 19.5625
15 3.49109 ‐2.66261 299.133 105.077 19.3549
16 4.37465 ‐2.81779 296.577 101.04 18.8133
17 5.2582 ‐2.91972 288.199 93.3153 17.9413
18 6.14176 ‐2.9695 273.81 82.3858 16.7458
19 7.02532 ‐2.96763 253.069 68.9383 15.2381
20 7.90887 ‐2.91408 226.633 54.1387 13.4352
21 8.79243 ‐2.80832 195.651 39.3117 11.361
22 9.67599 ‐2.64922 161.723 25.7542 9.04831
23 10.5595 ‐2.43504 126.81 14.5348 6.53863
24 11.4431 ‐2.1633 92.9119 6.30531 3.88233
25 12.3267 ‐1.83066 62.2719 1.23612 1.13719
26 12.6891 ‐1.67562 42.2707 0 0

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
List Of Coordinates

Water Table
X Y
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 6.8
‐0.3 6.8
‐0.3 6.5
‐1.5 7

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
‐22.7 7
‐25 7
‐25 ‐1

Material Boundary
X Y
‐4.5 3
‐12.91 3
‐7.29696 0.5
‐3.92913 ‐1
10.25 ‐1
6.5 0.5
1 2.7
0 2.7

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐12.91 3

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
‐25 ‐6
25 ‐6

Material Boundary
X Y
‐0.3 6.5
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐25 ‐1
‐3.92913 ‐1

Material Boundary
X Y
10.25 ‐1
13 ‐2.1

Material Boundary
X Y
‐7.29696 0.5
6.5 0.5

Project
531 C75 - RW - Section 04_Zone 2 - Rapid Drawdown Analysis + Seismic Load
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - Drawdown+Seismic - Zone 2.slim
Zone 2 – Section 4
Case: HAT
Safety Factor
15

0.000
0.250
0.500
0.750
1.495
1.000
1.250 20.00 kN/m2 10.00 kN/m2
10

1.500
1.750
2.000
2.250
2.500
2.750
5

3.000 W
3.250
3.500
3.750
4.000 1.500

4.250 4.650
0

4.500 1.500

4.750 Unit Weight Cohesion Phi


Material Name Color Strength Type Water Surface Hu Type Ru
5.000 (kN/m3) (kPa) (deg)
5.250 Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant
5.500
Sand / Silt 1b 17 Mohr‐Coulomb 0 33 Water Surface Constant
5.750
-5

6.000+ Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant

Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company


1:228
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ HAT

Project Summary

File Name: Section 04 ‐ HAT ‐ Zone 2
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ HAT
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: None

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Strength  Infinite 
Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
Type strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion 
0 0 0 0 0 0 100
[kPa]
Friction 
29 33 38 40 32 40 45
Angle [deg]
Water 
Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Surface
Hu Value 1 1 1 1 1 1 1
Ru Value 0

Global Minimums

Method: bishop simplified
Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
FS: 1.495200
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 2.850
Resisting Moment=11671.6 kN‐m
Driving Moment=7806.03 kN‐m
Total Slice Area=109.003 m2

Method: gle/morgenstern‐price
FS: 1.506780
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 2.850
Resisting Moment=11761.9 kN‐m
Driving Moment=7806.03 kN‐m
Resisting Horizontal Force=646.699 kN
Driving Horizontal Force=429.194 kN
Total Slice Area=109.003 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32555
Number of Invalid Surfaces: 17445

Error Codes:

Error Code ‐99 reported for 17445 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32549
Number of Invalid Surfaces: 17451

Error Codes:

Error Code ‐99 reported for 17445 surfaces
Error Code ‐108 reported for 6 surfaces

Error Codes

The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving 
force is very small (0.1 is an arbitrary number).

Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.4952
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.34755 7.99566 12.7957 0 12.7957
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 12.4781 18.6573 29.858 0 29.858
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 18.9797 28.3785 45.4151 0 45.4151
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 29.2768 43.7746 55.4346 3.26608 52.1685
5 0.800058 81.6297 Gravel Replacement 0 40 35.6031 53.2338 75.4833 12.0417 63.4416
6 0.800058 94.0885 Gravel Replacement 0 40 40.4889 60.539 91.7143 19.5667 72.1476
Backfill (Compacted 
7 0.72498 98.1015 0 32 37.7171 56.3946 116.068 25.8178 90.2506
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 43.2288 64.6357 134.461 31.0223 103.439
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 44.3229 66.2716 141.672 35.6155 106.056
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 47.0434 70.3393 148.357 40.0439 108.313
11 0.883557 78.4408 Sand / Silt 1b 0 33 16.2155 24.2454 81.582 44.2474 37.3346
12 0.883557 77.8344 Sand / Silt 1b 0 33 15.0805 22.5484 82.5061 47.7846 34.7215
13 0.883557 79.2805 Sand / Silt 1b 0 33 14.9837 22.4036 85.2042 50.7057 34.4985
14 0.883557 80.3096 Sand / Silt 1b 0 33 14.902 22.2814 87.3584 53.0481 34.3103
15 0.883557 80.4954 Sand / Silt 1b 0 33 14.6367 21.8848 88.5395 54.8399 33.6996
16 0.883557 79.8689 Sand / Silt 1b 0 33 14.1857 21.2104 88.7621 56.101 32.6611
17 0.883557 78.4508 Sand / Silt 1b 0 33 13.5439 20.2508 88.0287 56.8451 31.1836
18 0.883557 76.2531 Sand / Silt 1b 0 33 12.7037 18.9946 86.3292 57.0801 29.2491
19 0.883557 73.2794 Sand / Silt 1b 0 33 11.6544 17.4256 83.6414 56.8083 26.8331
20 0.883557 69.5256 Sand / Silt 1b 0 33 10.3808 15.5214 79.9278 56.0269 23.9009
21 0.883557 64.9789 Sand / Silt 1b 0 33 8.86323 13.2523 75.1345 54.7278 20.4067
22 0.883557 59.6371 Sand / Silt 1b 0 33 7.08527 10.5939 69.2099 52.8968 16.3131
23 0.883557 53.6766 Sand / Silt 1b 0 33 5.12988 7.67019 62.3244 50.5134 11.811
24 0.883557 46.8924 Sand / Silt 1b 0 33 2.86654 4.28605 54.1488 47.5489 6.59992
25 0.3624 16.9188 Grouted Riprap 100 45 95.0261 142.083 87.2399 45.1568 42.0831

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.50678
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.15797 7.77193 12.4377 0 12.4377
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 11.6576 17.5654 28.1106 0 28.1106
Sand)
Backfill (Compacted 

Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 26.626 40.1195 51.0786 3.26608 47.8126
5 0.800058 81.6297 Gravel Replacement 0 40 31.8311 47.9625 69.2013 12.0417 57.1596
6 0.800058 94.0885 Gravel Replacement 0 40 35.8395 54.0023 83.9241 19.5667 64.3574
Backfill (Compacted 
7 0.72498 98.1015 0 32 32.6876 49.253 104.639 25.8178 78.8213
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 37.7658 56.9048 122.09 31.0223 91.0673
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 38.9667 58.7142 129.578 35.6155 93.9621
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 42.1618 63.5285 137.869 40.0439 97.8248
11 0.883557 78.4408 Sand / Silt 1b 0 33 12.6715 19.0932 73.6483 44.2474 29.4009
12 0.883557 77.8344 Sand / Silt 1b 0 33 12.3919 18.6719 76.5368 47.7846 28.7522
13 0.883557 79.2805 Sand / Silt 1b 0 33 13.5168 20.3669 82.068 50.7057 31.3623
14 0.883557 80.3096 Sand / Silt 1b 0 33 14.9051 22.4587 87.6315 53.0481 34.5834
15 0.883557 80.4954 Sand / Silt 1b 0 33 16.2275 24.4513 92.4915 54.8399 37.6516
16 0.883557 79.8689 Sand / Silt 1b 0 33 17.3545 26.1494 96.3676 56.101 40.2666
17 0.883557 78.4508 Sand / Silt 1b 0 33 18.1387 27.3311 98.9313 56.8451 42.0862
18 0.883557 76.2531 Sand / Silt 1b 0 33 18.4285 27.7677 99.8386 57.0801 42.7585
19 0.883557 73.2794 Sand / Silt 1b 0 33 18.0846 27.2495 98.7688 56.8083 41.9605
20 0.883557 69.5256 Sand / Silt 1b 0 33 16.9993 25.6142 95.4694 56.0269 39.4425
21 0.883557 64.9789 Sand / Silt 1b 0 33 15.1133 22.7724 89.7942 54.7278 35.0664
22 0.883557 59.6371 Sand / Silt 1b 0 33 12.439 18.7429 81.7583 52.8968 28.8615
23 0.883557 53.6766 Sand / Silt 1b 0 33 9.16511 13.8098 71.7785 50.5134 21.2651
24 0.883557 46.8924 Sand / Silt 1b 0 33 5.31731 8.01201 59.8864 47.5489 12.3375
25 0.3624 16.9188 Grouted Riprap 100 45 96.4398 145.314 90.4705 45.1568 45.3137

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.4952
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 17.6025 0 0
3 ‐6.22911 4.0443 46.6729 0 0
4 ‐5.50181 3 80.3298 0 0
5 ‐4.70175 2.03413 110.506 0 0
6 ‐3.9017 1.21087 144.233 0 0
7 ‐3.10164 0.5 177.116 0 0
8 ‐2.37666 ‐0.0635653 215.25 0 0
9 ‐1.65168 ‐0.561069 250.882 0 0
10 ‐0.926698 ‐1 281.011 0 0
11 ‐0.0431408 ‐1.4639 308.369 0 0
12 0.840416 ‐1.85697 326.145 0 0
13 1.72397 ‐2.18505 339.825 0 0
14 2.60753 ‐2.4525 348.31 0 0
15 3.49109 ‐2.66261 351.208 0 0
Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
16 4.37465 ‐2.81779 348.499 0 0
17 5.2582 ‐2.91972 340.271 0 0
18 6.14176 ‐2.9695 326.717 0 0
19 7.02532 ‐2.96763 308.135 0 0
20 7.90887 ‐2.91408 284.936 0 0
21 8.79243 ‐2.80832 257.659 0 0
22 9.67599 ‐2.64922 226.993 0 0
23 10.5595 ‐2.43504 193.8 0 0
24 11.4431 ‐2.1633 158.993 0 0
25 12.3267 ‐1.83066 123.879 0 0
26 12.6891 ‐1.67562 100.461 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.50678
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 17.1225 0.538755 1.8022
3 ‐6.22911 4.0443 44.52 2.78401 3.57827
4 ‐5.50181 3 75.5549 7.01282 5.30286
5 ‐4.70175 2.03413 103.546 12.9194 7.11202
6 ‐3.9017 1.21087 135.001 20.9014 8.80089
7 ‐3.10164 0.5 165.931 30.2867 10.3441
8 ‐2.37666 ‐0.0635653 201.158 41.2861 11.5984
9 ‐1.65168 ‐0.561069 234.465 52.8474 12.702
10 ‐0.926698 ‐1 263.035 63.8481 13.6439
11 ‐0.0431408 ‐1.4639 289.668 75.2419 14.5609
12 0.840416 ‐1.85697 307.4 83.5986 15.2139
13 1.72397 ‐2.18505 321.444 89.7199 15.5952
14 2.60753 ‐2.4525 330.33 92.8569 15.7009
15 3.49109 ‐2.66261 333.225 92.5968 15.5296
16 4.37465 ‐2.81779 329.664 88.847 15.0833
17 5.2582 ‐2.91972 319.352 81.7984 14.3668
18 6.14176 ‐2.9695 302.22 71.9353 13.3886
19 7.02532 ‐2.96763 278.495 60.0144 12.161
20 7.90887 ‐2.91408 248.749 47.0068 10.7012
21 8.79243 ‐2.80832 213.928 34.0035 9.03152
22 9.67599 ‐2.64922 175.363 22.0918 7.18016
23 10.5595 ‐2.43504 134.715 12.2148 5.18092
24 11.4431 ‐2.1633 93.7468 5.03277 3.07296
25 12.3267 ‐1.83066 54.5436 0.856503 0.899647
26 12.6891 ‐1.67562 100.461 0 0

List Of Coordinates

Water Table
X Y
Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
‐25 2.85
25 2.85

Drawdown Line
X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load

X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary
X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 6.8
‐0.3 6.8
‐0.3 6.5
‐1.5 7
‐22.7 7
‐25 7
‐25 ‐1

Material Boundary
Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
X Y
‐4.5 3
‐12.91 3
‐7.29696 0.5
‐3.92913 ‐1
10.25 ‐1
6.5 0.5
1 2.7
0 2.7

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐12.91 3

Material Boundary
X Y
‐25 ‐4
25 ‐4

Material Boundary

X Y
‐25 ‐6
25 ‐6

Material Boundary

X Y
‐0.3 6.5
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3

Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
‐4.5 3
‐4.5 2
0 2
0 2.7
0 3

Material Boundary
X Y
‐25 ‐1
‐3.92913 ‐1

Material Boundary
X Y
10.25 ‐1
13 ‐2.1

Material Boundary
X Y
‐7.29696 0.5
6.5 0.5

Project
531 C75 - RW - Section 04_Zone 2 - HAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - HAT - Zone 2.slim
Zone 2 – Section 4
Case: LAT
Safety Factor
15

0.000
0.250
0.500
0.750 1.503
1.000
1.250 20.00 kN/m2 10.00 kN/m2
10

1.500
1.750
2.000
2.250
2.500
2.750 12.000
5

3.000
3.250
3.500
3.750 W 1.500
4.000
4.800
4.250
0

1.500
4.500 2.000
4.750 Unit Weight Cohesion Phi
Material Name Color Strength Type Water Surface Hu Type Ru
(kN/m3) (kPa) (deg)
5.000
5.250 Sand / Silt 1a 16 Mohr‐Coulomb 0 29 Water Surface Constant

5.500 Sand / Silt 1b 17 Mohr‐Coulomb 0 33 Water Surface Constant


5.750
-5

Sand / Silt 1c 18 Mohr‐Coulomb 0 38 Water Surface Constant


6.000+
Sand / Silt 1d 18 Mohr‐Coulomb 0 40 Water Surface Constant

Backfill (Compacted Sand) 18 Mohr‐Coulomb 0 32 Water Surface Constant

Gravel Replacement 18 Mohr‐Coulomb 0 40 Water Surface Constant


-10

Grouted Riprap 20 Mohr‐Coulomb 100 45 Water Surface Constant

Concrete 25 Infinite strength None 0


-15

-30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30


Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company


1:228
Date File Name
SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
Slide Analysis Information
531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ LAT

Project Summary

File Name: Section 04 ‐ LAT ‐ Zone 2
Slide Modeler Version: 6.025
Project Title: 531 C75 ‐ RW ‐ Section 04_Zone 2 ‐ LAT
Date Created: 2/20/2020, 12:11:19 PM

General Settings

Units of Measurement: Metric Units
Time Units: days
Permeability Units: meters/second
Failure Direction: Left to Right
Data Output: Standard
Maximum Material Properties: 20
Maximum Support Properties: 20

Analysis Options

Analysis Methods Used

Bishop simplified
GLE/Morgenstern‐Price with interslice force function: Half Sine

Number of slices: 25
Tolerance: 0.005
Maximum number of iterations: 50
Check malpha < 0.2: Yes
Initial trial value of FS: 1
Steffensen Iteration: Yes

Groundwater Analysis

Groundwater Method: Water Surfaces
Pore Fluid Unit Weight: 9.81 kN/m3
Advanced Groundwater Method: None

Random Numbers

Pseudo‐random Seed: 10116
Random Number Generation Method: Park and Miller v.3

Surface Options
Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
Surface Type: Circular
Search Method: Slope Search
Number of Surfaces: 50000
Upper Angle: Not Defined
Lower Angle: Not Defined
Composite Surfaces: Disabled
Reverse Curvature: Create Tension Crack
Minimum Elevation: Not Defined
Minimum Depth: Not Defined

Loading

2 Distributed Loads present

Distributed Load 1
Distribution: Constant
Magnitude [kPa]: 10
Orientation: Normal to boundary

Distributed Load 2
Distribution: Constant
Magnitude [kPa]: 20
Orientation: Normal to boundary

Material Properties

Backfill 
Gravel  Grouted 
Property Sand / Silt 1a Sand / Silt 1b Sand / Silt 1c Sand / Silt 1d (Compacted  Concrete
Replacement Riprap
Sand)
Color ___ ___ ___ ___ ___ ___ ___ ___
Strength  Infinite 
Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb Mohr‐Coulomb
Type strength
Unit Weight 
16 17 18 18 18 18 20 25
[kN/m3]
Cohesion 
0 0 0 0 0 0 100
[kPa]
Friction 
29 33 38 40 32 40 45
Angle [deg]
Water 
Water Table Water Table Water Table Water Table Water Table Water Table Water Table None
Surface
Hu Value 1 1 1 1 1 1 1
Ru Value 0

Global Minimums

Method: bishop simplified
Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
FS: 1.503480
Center: 6.551, 12.170
Radius: 15.145
Left Slip Surface Endpoint: ‐7.684, 7.000
Right Slip Surface Endpoint: 12.689, ‐1.676
Left Slope Intercept: ‐7.684 7.000
Right Slope Intercept: 12.689 0.200
Resisting Moment=13850.9 kN‐m
Driving Moment=9212.56 kN‐m
Total Slice Area=87.7987 m2

Method: gle/morgenstern‐price
FS: 1.510860
Center: 6.637, 12.109
Radius: 15.220
Left Slip Surface Endpoint: ‐7.700, 7.000
Right Slip Surface Endpoint: 12.903, ‐1.761
Left Slope Intercept: ‐7.700 7.000
Right Slope Intercept: 12.903 0.200
Resisting Moment=14192.5 kN‐m
Driving Moment=9393.66 kN‐m
Resisting Horizontal Force=784.754 kN
Driving Horizontal Force=519.408 kN
Total Slice Area=90.5224 m2

Valid / Invalid Surfaces

Method: bishop simplified
Number of Valid Surfaces: 32555
Number of Invalid Surfaces: 17445

Error Codes:

Error Code ‐99 reported for 17445 surfaces

Method: gle/morgenstern‐price
Number of Valid Surfaces: 32537
Number of Invalid Surfaces: 17463

Error Codes:

Error Code ‐99 reported for 17445 surfaces
Error Code ‐108 reported for 18 surfaces

Error Codes

The following errors were encountered during the computation:

‐99 = Slip surface intersects an infinite strength material. If infinite strength regions are defined for a model, a large number of potential 
slip surfaces may show this error code. This is Normal.
‐108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving 
force is very small (0.1 is an arbitrary number).

Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
Slice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.50348
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 0.727296 10.9893 0 32 5.33382 8.01929 12.8336 0 12.8336
Sand)
Backfill (Compacted 
2 0.727296 30.3363 0 32 12.441 18.7048 29.934 0 29.934
Sand)
Backfill (Compacted 
3 0.727296 45.5296 0 32 18.9178 28.4425 45.5176 0 45.5176
Sand)
4 0.800058 64.5589 Gravel Replacement 0 40 30.2766 45.5202 54.2489 0 54.2489
5 0.800058 81.6297 Gravel Replacement 0 40 39.7585 59.7761 71.2384 0 71.2384
6 0.800058 94.0885 Gravel Replacement 0 40 47.6538 71.6465 85.3849 0 85.3849
Backfill (Compacted 
7 0.72498 98.1015 0 32 45.6805 68.6797 109.911 0 109.911
Sand)
Backfill (Compacted 
8 0.72498 111.686 0 32 51.4606 77.37 128.844 5.02583 123.818
Sand)
Backfill (Compacted 
9 0.72498 120.6 0 32 52.7697 79.3382 136.586 9.61904 126.967
Sand)
10 0.883557 152.852 Sand / Silt 1b 0 33 55.9946 84.1867 143.684 14.0474 129.636
11 0.883557 78.4408 Sand / Silt 1b 0 33 25.5652 38.4368 77.4384 18.2509 59.1875
12 0.883557 77.5955 Sand / Silt 1b 0 33 24.59 36.9706 78.7179 21.7881 56.9298
13 0.883557 76.5389 Sand / Silt 1b 0 33 23.6597 35.5719 79.4851 24.7092 54.7759
14 0.883557 74.5046 Sand / Silt 1b 0 33 22.4397 33.7376 79.0031 27.0516 51.9515
15 0.883557 71.6271 Sand / Silt 1b 0 33 20.971 31.5295 77.3945 28.8434 48.5511
16 0.883557 67.9372 Sand / Silt 1b 0 33 19.2521 28.9451 74.676 30.1045 44.5715
17 0.883557 63.4558 Sand / Silt 1b 0 33 17.2773 25.976 70.8481 30.8486 39.9995
18 0.883557 58.1947 Sand / Silt 1b 0 33 15.0367 22.6074 65.8959 31.0836 34.8123
19 0.883557 52.1577 Sand / Silt 1b 0 33 12.5157 18.8171 59.7876 30.8118 28.9758
20 0.883557 46.5724 Sand / Silt 1b 0 33 10.3286 15.5289 53.9429 30.0304 23.9125
21 0.883557 42.0095 Sand / Silt 1b 0 33 8.80989 13.2455 49.1276 28.7313 20.3963
22 0.883557 36.6677 Sand / Silt 1b 0 33 7.04126 10.5864 43.2019 26.9003 16.3016
23 0.883557 30.7072 Sand / Silt 1b 0 33 5.09692 7.66311 36.317 24.5169 11.8001
24 0.883557 23.923 Sand / Silt 1b 0 33 2.84742 4.28104 28.1446 21.5524 6.59224
25 0.3624 7.49764 Grouted Riprap 100 45 94.2764 141.743 60.9031 19.1603 41.7428

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.51086
Base  Base  Effective 
Base  Shear  Shear  Pore 
Slice  Width  Weight  Base  Friction  Normal  Normal 
Cohesion  Stress  Strength  Pressure 
Number [m] [kN] Material Angle  Stress  Stress 
[kPa] [kPa] [kPa] [kPa]
[degrees] [kPa] [kPa]
Backfill (Compacted 
1 1.0718 22.701 0 32 6.37003 9.62423 15.402 0 15.402
Sand)
Backfill (Compacted 
2 1.0718 61.2859 0 32 15.2239 23.0012 36.8097 0 36.8097
Sand)
3 0.78347 63.2076 Gravel Replacement 0 40 26.721 40.3717 48.1131 0 48.1131

Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
4 0.78347 79.3837 Gravel Replacement 0 40 34.8867 52.7089 62.816 0 62.816
5 0.78347 92.1255 Gravel Replacement 0 40 42.3503 63.9854 76.2549 0 76.2549
Backfill (Compacted 
6 0.703153 94.2222 0 32 39.5568 59.7648 95.6436 0 95.6436
Sand)
Backfill (Compacted 
7 0.703153 106.569 0 32 44.4398 67.1423 112.454 5.00421 107.45
Sand)
Backfill (Compacted 
8 0.703153 117.541 0 32 47.5564 71.8511 124.594 9.60842 114.986
Sand)
9 0.852568 146.397 Sand / Silt 1b 0 33 50.0129 75.5625 130.419 14.0623 116.356
10 0.852568 96.3131 Sand / Silt 1b 0 33 30.5207 46.1125 89.3189 18.3119 71.007
11 0.852568 76.1356 Sand / Silt 1b 0 33 22.4851 33.9718 74.2396 21.9276 52.312
12 0.852568 75.9314 Sand / Silt 1b 0 33 23.1182 34.9283 78.7429 24.9581 53.7848
13 0.852568 74.3654 Sand / Silt 1b 0 33 23.4498 35.4293 81.9968 27.4404 54.5564
14 0.852568 72.0309 Sand / Silt 1b 0 33 23.6265 35.6963 84.37 29.4026 54.9674
15 0.852568 68.9587 Sand / Silt 1b 0 33 23.5314 35.5526 85.6116 30.8654 54.7462
16 0.852568 65.1706 Sand / Silt 1b 0 33 23.0344 34.8017 85.4337 31.8437 53.59
17 0.852568 60.6807 Sand / Silt 1b 0 33 22.007 33.2495 83.5467 32.347 51.1997
18 0.852568 55.4962 Sand / Silt 1b 0 33 20.3409 30.7323 79.7038 32.3802 47.3236
19 0.852568 49.7731 Sand / Silt 1b 0 33 18.0712 27.3031 73.9867 31.9435 42.0432
20 0.852568 45.4067 Sand / Silt 1b 0 33 16.4521 24.8568 69.3089 31.0328 38.2761
21 0.852568 40.9665 Sand / Silt 1b 0 33 14.509 21.9211 63.3948 29.6392 33.7556
22 0.852568 35.8616 Sand / Silt 1b 0 33 11.8879 17.9609 55.4061 27.7488 27.6573
23 0.852568 30.2007 Sand / Silt 1b 0 33 8.78936 13.2795 45.7901 25.3415 20.4486
24 0.852568 23.7503 Sand / Silt 1b 0 33 5.2606 7.94803 34.6294 22.3905 12.2389
25 0.358678 7.72447 Grouted Riprap 100 45 97.3479 147.079 67.0865 20.0074 47.0791

Interslice Data

Global Minimum Query (bishop simplified) ‐ Safety Factor: 1.50348
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.6837 7 0 0 0
2 ‐6.9564 5.32113 17.678 0 0
3 ‐6.22911 4.0443 46.8768 0 0
4 ‐5.50181 3 80.6926 0 0
5 ‐4.70175 2.03413 108.938 0 0
6 ‐3.9017 1.21087 135.87 0 0
7 ‐3.10164 0.5 158.554 0 0
8 ‐2.37666 ‐0.0635653 187.476 0 0
9 ‐1.65168 ‐0.561069 214.378 0 0
10 ‐0.926698 ‐1 236.185 0 0
11 ‐0.0431408 ‐1.4639 253.511 0 0
12 0.840416 ‐1.85697 261.428 0 0
13 1.72397 ‐2.18505 265.591 0 0
14 2.60753 ‐2.4525 266.006 0 0
15 3.49109 ‐2.66261 262.837 0 0
16 4.37465 ‐2.81779 256.372 0 0
Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
17 5.2582 ‐2.91972 247.024 0 0
18 6.14176 ‐2.9695 235.33 0 0
19 7.02532 ‐2.96763 221.959 0 0
20 7.90887 ‐2.91408 207.733 0 0
21 8.79243 ‐2.80832 192.435 0 0
22 9.67599 ‐2.64922 175.146 0 0
23 10.5595 ‐2.43504 156.753 0 0
24 11.4431 ‐2.1633 138.232 0 0
25 12.3267 ‐1.83066 120.974 0 0
26 12.6891 ‐1.67562 17.2556 0 0

Global Minimum Query (gle/morgenstern‐price) ‐ Safety Factor: 1.51086
X  Y  Interslice  Interslice  Interslice 
Slice 
coordinate  coordinate ‐ Bottom  Normal Force  Shear Force  Force Angle 
Number
[m] [m] [kN] [kN] [degrees]
1 ‐7.70017 7 0 0 0
2 ‐6.62836 4.64664 29.4002 1.87452 3.64817
3 ‐5.55656 3 73.6505 9.26659 7.17118
4 ‐4.77309 2.03594 99.0418 16.7532 9.60086
5 ‐3.98962 1.2126 123.353 25.9134 11.8639
6 ‐3.20615 0.5 144.42 35.8168 13.9286
7 ‐2.503 ‐0.061323 170.216 47.4985 15.5917
8 ‐1.79985 ‐0.558903 194.837 59.7933 17.0607
9 ‐1.09669 ‐1 216.264 71.6274 18.3251
10 ‐0.244125 ‐1.46692 234.402 83.3443 19.5734
11 0.608443 ‐1.8664 243.99 91.2322 20.5017
12 1.46101 ‐2.20407 249.836 96.4277 21.1048
13 2.31358 ‐2.48423 252.133 98.7091 21.3802
14 3.16615 ‐2.71015 250.61 97.8435 21.3267
15 4.01871 ‐2.88427 245.102 93.8148 20.9448
16 4.87128 ‐3.00838 235.61 86.8543 20.2357
17 5.72385 ‐3.08371 222.353 77.444 19.2029
18 6.57642 ‐3.11099 205.818 66.288 17.8522
19 7.42899 ‐3.09047 186.793 54.2473 16.194
20 8.28156 ‐3.02197 166.213 42.194 14.2439
21 9.13412 ‐2.90481 143.08 30.478 12.0251
22 9.98669 ‐2.73785 118.004 19.8927 9.56876
23 10.8393 ‐2.51939 92.5077 11.2206 6.91583
24 11.6918 ‐2.24707 68.1541 4.90471 4.11619
25 12.5444 ‐1.91776 46.7421 1.00128 1.22717
26 12.9031 ‐1.76123 18.8667 0 0

List Of Coordinates

Water Table
X Y
‐25 0.2
Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
25 0.2

Drawdown Line

X Y
‐25 2.85
1.375 2.85
5.35 1.26
25 1.26

Line Load
X Y
‐1.5 7
‐8.5 7

Line Load
X Y
‐8.5 7
‐22.7 7
‐25 7

External Boundary

X Y
‐25 ‐2
‐25 ‐4
‐25 ‐6
‐25 ‐12
25 ‐12
25 ‐6
25 ‐4
25 ‐2.1
25 ‐1.8
13 ‐1.8
1 3
0 3
0 6.8
‐0.3 6.8
‐0.3 6.5
‐1.5 7
‐22.7 7
‐25 7
‐25 ‐1

Material Boundary

Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
X Y
‐4.5 3
‐12.91 3
‐7.29696 0.5
‐3.92913 ‐1
10.25 ‐1
6.5 0.5
1 2.7
0 2.7

Material Boundary
X Y
13 ‐2.1
25 ‐2.1

Material Boundary
X Y
‐22.7 7
‐12.91 3

Material Boundary

X Y
‐25 ‐4
25 ‐4

Material Boundary
X Y
‐25 ‐6
25 ‐6

Material Boundary
X Y
‐0.3 6.5
‐0.3 6.3
‐0.8 6.3
‐0.8 6
‐1.8 6
‐1.8 5
‐2.4 5
‐2.4 4
‐3 4
‐3 3
‐4.5 3
Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim
‐4.5 2
0 2
0 2.7
0 3

Material Boundary

X Y
‐25 ‐1
‐3.92913 ‐1

Material Boundary

X Y
10.25 ‐1
13 ‐2.1

Material Boundary
X Y
‐7.29696 0.5
6.5 0.5

Project
531 C75 - RW - Section 04_Zone 2 - LAT
Analysis Description

Drawn By Scale Company

Date File Name


SLIDEINTERPRET 6.025
2/20/2020, 12:11:19 PM Section 04 - LAT - Zone 2.slim