1 Abstract:
The main purpose of this experiment was to study the different maintenance plan is designed to
check the working condition of equipment. From this experiment in which we using these plans
breakdown time can be minimized or totally removed. These plans may be daily base, weekly or
monthly based. So to understand all steps considered in planning is important so that machine
can perform better than expectation.
i
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
Table of Contents
1 Abstract: ................................................................................................................................... i
Table of Contents ............................................................................................................................ ii
1. Introduction ............................................................................................................................. 1
1.1. Objectives ............................................................................................................................ 1
1.2. Theory .................................................................................................................................. 1
1.1 Maintenance: .................................................................................................................... 1
1.2 Aims of maintenance ........................................................................................................ 1
1.3 Importance of maintenance .............................................................................................. 1
1.4 Effects of maintenance ..................................................................................................... 1
1.5 Operation involved in maintenance.................................................................................. 1
1.6 Types of Maintenance ...................................................................................................... 2
1.6.1 Time based maintenance ........................................................................................... 2
2. Equipment and Materials ........................................................................................................ 2
3. Method .................................................................................................................................... 2
4. Discussion ............................................................................................................................... 3
5. References ............................................................................................................................... 3
ii
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
1. Introduction
1.1. Objectives
• To understand the Preparation of a maintenance plan ( cutter) a garment unit.
1.2. Theory
1.1 Maintenance:
Maintenance may be defined as the chronological activities or as the process of systematic
activities done for keeping the m\c or equipments at the heat level for well run or its proper
services.
• Repairing: Repairing or altering of spares & equipment (if necessary) is to be detected &
necessary measures are taken (repairing\altering\setting\adjustment) .
1
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
• Overhauling: It is the work of maintenance, but not frequent or schedule work. It is done
as per as necessary.
2
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
4. Discussion
5. References
Lab demonstration
https://textileapex.blogspot.com/
https://textilelearner.blogspot.com/
https://clothingindustry.blogspot.com/
3
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
Name: _Kashif Raza_____ Registration No. _________16-NTU-0068_______ Total Marks Obtained: _____________
1
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
Discussion Very incomplete or incorrect Some of the results have Almost all of the results have All-important trends and data
interpretation of trends and been correctly interpreted and been correctly interpreted and comparisons have been interpreted
08 comparison of data indicating a lack discussed; partial but discussed, only minor correctly and discussed, a good
of understanding of results incomplete understanding of improvements are needed understanding of results is conveyed
results is still evident
Conclusions Conclusions missing or missing the Conclusions regarding major All-important conclusions have All-important conclusions have been
important points points are drawn, but many been drawn, could be better clearly made, the student shows good
04 are misstated, indicating a stated understanding
lack of understanding
2
Preparation of a maintenance plan for (Cutter) a garment unit
Kashif Raza
Spelling, Frequent grammar and/or spelling Occasional grammar/spelling Less than 3 grammar/spelling All grammar/spelling correct and
grammar, errors, the writing style is rough and errors, generally readable with errors, mature, readable style very well-written
04 immature some rough spots in writing
sentence
structure style
Appearance Sections out of order, too Sections in order contain the All sections in order, formatting All sections in order, well-formatted,
and formatting muchhandwritten copy, sloppy minimum allowable amount generally good but could still be very readable
04 formatting of handwritten copy, improved
formatting is rough but
readable