New coordinates

Panel Reference
Easting Northing
G26 C8B-G26-PA-SP-01 49950.7 43950
H26 C8B-BPJV-I-H26-01B 49941.34 4049.5
N24 C8B-BPJV-I-N24-01 49742 44655
O23 C8B-O23-PA-SP-01 49651 44747
P24 CPT-POST-C8C-17 (P) 49752 44849
R23 BH-POST-C8C-07 49644 45050
S21 CPT-I-S21-01 49450.9 45141.5
S23 CPT-437 49649.5 45157
T21 BH-POST-C4B-08(P) 49444.5 45253
U22 CPT-PRE-C4B-13 49465 45365
Y11 CPT-I-Y11-01A 48495 45703.7
X11 BH-POST-VST-C6A-X11-01 48447 45647
Y12 CPT-PRE-C6A-03 48548 45750
ZE42 BH-VST-I-ZE42-01 51553 46340
ZH39 CPT-I-ZH39-01 51250 46647
Remark

BPJV truck carried out the internal CPT

BPJV truck carried out the internal CPT


BPJV truck carried out the internal CPT

CPT needs to be carried out again, after clay upheave removal (removal shall be done till -3.8 mCD)
BPJV truck carried out the internal CPT
Access needed
To be done
Done, and compliant
To be done
Access needed
Done, and compliant
Done, top clay above -1.9 mCD
Re test to be done E 49649.5 N 45157
Re test to be done E 49443.6 N 45253.35
Re test to be done E 49546.3 N 45350.07
Done, and compliant
To be done
To be done
Re test to be done E 51574.5 N 46355.0
Access needed