You are on page 1of 15

This paper describes objective technical results and analysis.

Any subjective views or opinions that might be expressed


in the paper do not necessarily represent the views of the U.S. Department of Energy or the United States Government.

SAND2019-12374C

• ENVIRONMENT
SAFETY & HEALTH

Sandia National Laboratories Building 1090


Laboratory Modifications
PRESENTED BY: Mark B. Allen
SAND REPORT: SAN I 201 9-XXXX
Co-Author: Joe Zigmond
Radiation Protection Sample Diagnostics

Sandia National Labccatories is a multimission laboratory managedand


operated by National Technology and Engineering Solutions of Sandia LLC, a
wholly owned subsidiary of 1-loneryell International inc. for the U.S.
)A P RRMC 2019
Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned
Departmentof Energys National Nuclear Security Administration under
subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National
contract DE-NA0003525. NuclearSERVICES
ANALYTICAL Security Administration under contract DE-NA0003525.
PROGRAM
Radiation Protection Sample Diagnostics

Mission: Laboratory Analysis Services in Support of


Worker Safety and Health
Liquid Scintillation Counting ICP-MS, ICP-OES
Gas Proportional Counting Flame Atomic Absorption
Gamma spectroscopy Sample preparation facilities
Whole Body Counting
I Alpha spectroscopy

C)Sandia National Laboratories


0
Ea i NMENT
SAFETY & HEALTH
i
2
Building Design Modification History

U Rush to re-locate to new facility (2004)


U Design and build—same contractor
U No prior experience with lab construction ®
o Undersized, stainless steel ductwork.
o Positive air pressure differential from
1090 Evacuation Plan
lab spaces to office spaces. PRIMARY ASSEM1SILY POINT — South end of the east
athing lot for Building 1090.
SECONDARY ASSEMBLY POINT — F re hydrant on the
north side of East Ordinance road, north of Bukfrig 1090.
MGM ;

o Emergency evac plan—traffic flow


Fre Alarm Pull

toward the hazard. [4] Fre Extinguisher


k Post Inclicalthig Valve

U Energy audit(2009)—High power


consumption due to undersized ductwork
o New variable frequency drive installed
to serve exhaust fans.
o New stainless steel ductwork installed
(correct size).
o Energy use significary reduced.

Sandia National Laboratories .livAmo&NHMEgTi 3


Building Design & Modification History

CI Extended power outages (2012)


o Ventilation shuts down while acid
digestions in process.
o No emergency lighting in lab spaces.
CI Stainless steel ductwork incompatible with acid
digestions
o Condensate collects in hoods.
• Insufficient air flow.
o Sub-optimal hood design.
o Corrosion of control valves—leakage into
ceiling spaces.

Sandia National Laboratories or,=Tram 4


Laborator acility Upgrades
Goals:
o Replace corroded ductwork with
PermaShield Pipe (PSP) fluoropolymer
coated ductwork.
o Install new acid-compatible hoods.
o Provide backup power and lighting.
o Improve lab work flow/traffic patterns and
evac routes.
o Re-purpose some under-utilized lab
spaces.
L

11111iiiiirAn

Sandia National Laboratories or% milizrzn 5


Upgraded Facility
Do not use these exits during
an oxygen depleting event

Covered -
Storage

izge -

178
186 Sample Recelyln!
RPSD 172
stable
Radiochemistry CI: 174
la e
Sample
Management
Office
182 180
RPSD Lab
Count Lab Storage

184
RPSD
190A Sample
188 Prep Lab
179 1771 w172
190 RPSD Particulate
Whole Body 168 Fitier Prep
Counting LataL_,
_(1,

•11111

U Consolidated 7 fume hoods (spread out


over 5 rooms)to 3 fume hoods in 1 room
LI Dedicated exhaust fan for acid digestions
U Added additional emergency evacuation
exit(away from potential lab hazards)

Project Cost:$845K
Construction Timeline:4 months

0Sandia National Laboratories E NMENT


SAFETY & HEALTH 6
onstruction Issue: Inadequate Air Flow
Do not use these exits dunng
an oxygen depleting eve t

o Identified from newly installed Covered


Storage

194

differential air pressure monitors. Slorage alb -

ta
86
SD
178
Sample Receiving.' _ HI 172
So hne
e 174 Sample
Rad. : ifif Portable Management
Model SRPM Secure-Sense@ Lab Office
182 180
RPSD Lab
Count Lab Storage 170
Normal Dis.dbled SMO
Sample
0.0015 "4/C Receiving

190A
Alarm 179 172
190 R SD
7:1' EMI ,
I r .1 Whole.,,y
186
Parficulate
Fifier Prep

101
Room Pressure Monitor

1
The pressure reading 1301e drlierentral
Pressure between the hallway and room

7
: 1
002
267 g
1111

111111

o Positive pressure from lab


space to office space during
windy conditions.

\I0 ENNARONMENT
0Sandia National Laboratories —oak SAFETY 6 HEALTH 7
New Project to Extend Walls to Roof Deck

Eli Sandia National Laboratories ‘r aF


lVI ir&NZI H"'
ET 8
Wall Extension Project In Progress

Custom
scaffolding
over hoods

Finished wall
Old ceiling
extended to
line
roof deck

0Sandia National Laboratories Or% =0,14,rn 9


Wall Extension Finished Product

Before After

Project Cost:$ I 54K


Construction Timeline: 3 months

(3Sandia National Laboratories Tek


\F
1V
ET
I IVTH
Ir I -Hi l
Big Improvement to Differential Air Pressure

Before After
Model SRPM Secure-Sense®
Model SRPM Secure-Sense®
lb MEW
Normal Disabled Normal Disabled
—0.0015 "WC !WM —0.0797 "WC

I• 410 0.100 0.100


-0.100 I 0.100 Alarm
Alarm Reset
Reset l * „41

Room Pressure Monitor

Room Pressure Monitor The pressure reading is the differential


1
lowpressure between the hallway and room
The pressure reading is the differential 184.

pressure between the hallway and room 184.

0Sandia National Laboratories ►ENVIROTY HENMENT


gio SAFEALTH
Et
Issues E ounte During Recent Building Mods

UUnderestimated personnel resources needed to support the project


o One lab POC to interface with designers and construction contractors.
o Many competing routine and non-routine laboratory operations and projects.
OUnforeseen hazards/issues
o Mice in the ceilings
o Removal of flooring—increased background in adjacent lab count room
UHow to work around existing hoods
o Special scaffolding required

ENVIRONMENT
Sandia National Laboratories I2
p SAFETY & HEALTH
11 11 essons Learned

O Insist on a design firm with experience in designing analytical lab spaces.


O Consider independent review of design plans by consultant.
O Match hoods and ducting materials to be compatible with chemical and
radiological needs.
O Consider emergency lighting & backup power options.
O Involve Radiation Protection and Industrial Hygiene professionals early in
design and work planning process.
O Need frequent update meetings during construction phase to plan around
lab operations.

Sandia National Laboratories .1


.miTr&NHmEln
11
13
essons Learned

O Consider emergency evacuation routes and options.


O Plan for how doorways are going to used
o Large openings for equipment movement
O Evaluate need for windows on doors and door type (i.e. crash bars).
O Evaluate the need for differential pressure monitors in critical areas.
O Consider an independent post-construction evaluation.
O Need plan for storing construction designs, documents, plans, photos for
future reference.

\
I0ENVVRONMENT
Sandia National Laboratories —oak SAFETY & HEALTH I4
L ASP
• ANALYTICAL SERVICES PROGRAM

rit Sandia National Laboratories I5